CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Rehabilitation-Upgradation of Karanja-Kherda-Murtizapur Section to 4-LPS standards (Excluding overlapping portion with Samruddhi Mahamarg) section of NH 361C on EPC Mode in the state of Maharashtra.
Strengthening or Widening or New Construction in Km 3.400 to 50.0 (excluding chainage 5.975 to 19.525 and 26.825 to 41.200) on NH-11 (New) (Fatehpur-Mandawa-Jhunjhunu Road) in the State of Rajasthan on EPC mode.
Rehabilitation and Up-gradation to 4 lane Road with PS configuration from Undewadi Kade pathar (Ch. Deshmukh Chowk and Dhawan Patil Chowk (Baramati) Phaltan section of NH-160 in the State of Maharashtra on EPC mode.
PR from Km 128.0 to 132.0 and 144.00 to 150.0 Warangal town limits By passed Stretch of Hyderabad to Bhoopalapatnam road of NH 163 under Control of NHAI in the state of Telangana on EPC Mode.
Construction of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the State of Uttar Pradesh
CONSTRUCTION OF TWO GRADE SEPARATORS AT SIRSA GATE CHOWK KM 295.700 AND KHURSIPAR GATE CHOWK KM 300.400 OF NH-53 RAIPUR-DURG FOUR LANE ROAD IN THE STATE IN THE STATE OF CHHATTISGARH ON EPC Mode.
Construction of 3 no of Bypasses at Sheikhpura, Jamui and Khaira alongwith 1no of realignment at Sikandra with pre_construction activity(total length_13.472Km)to 2lane with paved shoulders standard alongwith Utility Shifting in NH333A under EPC mode
Rehabilitation and Upgradation of Kundam to Shahapura section of NH-45 from design Km 68.100 to 103.700 (Total Length- 35.600km) to Two lane with paved shoulder configuration in the State of Madhya Pradesh on EPC Mode
Construction of Minor Bridge at Hangarga Khurd Village at km 84.820 on NH161A Kundral to Wazar road section including its approach road on EPC Mode in the State of Maharashtra Total Length including approach 0.361 km
Construction of Access Controlled Pune Ring Road (East) in the State of Maharashtra on EPC Mode Package PRR E6 from Km.81 900 Sonori to Km.97 900 Garade, Taluka Purandar, District Pune (Length-16.000 Km)
Design and constructiohn of 690m Long 2 lane motor bridge over Chalti river from Chainage 29.875 to 30.565 of Tanakpur Jauljibi motor road along Indo Nepal Border in Champawat District of Uttarakhand state in EPC mode
Periodic renewal work from Km. 0.000 to 68.300 of NH-931 (Pratapgarh -Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 and 53)
Periodic Renewal (PR) from Km 172/900 to Km 177/600 on National Highways during 2019-20 on NH-39 (New 29), under NH Division No-I Kohima in the State of Nagaland on EPC mode
Strengthening of Service road from Ch. 315.725 to Ch. 323.350 with white topping and reconstruction with PQC from Ch. 323.350 to 324.000 on Bhopal Biaora section of NH46 in the state of MP on EPC mode
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh
6 lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad Bangalore Section of NH44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode.
Construction of 5 HL Bridges at 379.000 km (Pangam),439.400 km (Potteru), 444.237km (Kongurukonda), 457.075 km(MV-90), 468.150 km (MV96), of NH326 at on Malkangiri-Motu road in the state of Odisha on EPC mode
Construction of AIIMS at Awantipora Kashmir, Jammu and Kashmir (on EPC Mode 3 basis) SH: Providing services of four wheeled inspection vehicle for the O/o Assistant Engineer (Elect.), AIIMS Awantipora Kashmir Project Zone CPWD Srinagar
Construction of High-Altitude Hill Road to Indo China Border from Muguthang (Altitude-14832 ft) to 20R (Altitude-15331 ft) having length of 12.42 km in the state of Sikkim under Phase-II (EPC Mode-III)
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package-VIII)
Consultancy Services for Implementation of RAP for Rehabilitation and Upgradation of Paonta Sahib-Gumma-Fediz of NH-707 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Balance work of construction of two/four lane with paved shouder from km 422.00 to 523.60 (chitradurga to shivamogga section) of NH-13 in the state of Karnataka on EPC mode NH-369 (old NH-13)
Construction of 6 Lane SVUP at Km.124.000 with service Road and Bus Shelter in Village Gulara on Jhansi- Orai Section of NH-27 (Old NH-25) in the State of Uttar Pradesh on EPC Mode.
Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
Widening to Two Lane with Paved Shoulders from Km 0.00 (Design Chainage 0.00) to Km 23.338 Design Chainage 23.310 of NH166E MH KNT Border- Kanamadi Bijjargi Tikota section in the state of Karnataka in EPC Mode
Design, Build, Construct, Install and Commissioning of MRF of 10 TPD for Dry Waste along with operation and maintenance of the plant for 5 years including the tipping fee on EPC Mode in Nagar parishad Supaul.
Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
Engineering Procurement and Construction of 5kWp solar power plant and provision of 22kWp solar modules in existing solar plant including warranty of one year and comprehensive Operation and Maintenance of five years at IndianOil Bhavan Dhakuria
EPC Turnkey execution of Heo Hydro Electric Project (240 MW) in Shi Yomi District, Arunachal Pradesh.
Development of Pantnagar Airport on EPC Mode.
CONSTRUCTION OF NORTH CARGO BERTH III AT V.O CHIDAMBARANAR PORT ON ENGINEERING PROCUREMENT AND CONSTRUCTION CONTRACT BASIS
Execution of 03 Nos of Individual Rural Piped Water Supply Project pertaining Malkangiri and Koraput District including 5 years Operation and Maintenance on EPC contract under the package
Execution of Rural Piped Water Supply Project pertaining to Ambabhona Block Bhatil Block and Sohela Block in Bargarh District including 5 years Operation and Maintenance on EPC contract
Execution of two Nos Individual Rural Piped Water Supply Project pertaining Saiantal Block of Bolangir District including five years Operation and Maintenance on EPC contract under the package
Ancillary Civil works in New Staff Quarters in connection with Non Compliance of Agreement Conditions of EPC Contract in the newly constructed Staff Quarters at Coimbatore International Airport.
Design & Construction of Working Womens Hostel Building including maintenance of building for 1 year under EPC contract at Residential Layout, Vasanthanarasapura Industrial Area, 3rd Phase, Tumakuru Taluk & District
Appointment of EPC Contractor for Airslide Conveyor System balance work Completion on turn-key basis at Ariyalur Cement works Ariyalur District
TURN KEY Setup of ICU post operative wardTURN KEY Setup of ICU post operative ward
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 186
E-65 Low Temperature H2O2 gas plasma sterilizer along with Endoscopy washer on turn Key
Construction of Ishwarpur weir scheme in block Deori District Sagar(MP) on TURN KEY basis
INCREASING CAPACITY OF 33/11KV SUBSTATION HARHUWA FROM DISTT. VARANASI ON SEMI TURN KEY BASIS
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 180
CONST. OF HYDT, 02 NOS. TOILET ETC. ON TURN KEY BASIS GROUP NO. PAKUR 01
CONST. OF 06 NOS. BATHING UNIT ETC. ON TURN KEY BASIS. GROUP NO. PAKUR 01
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 185
Tender No. E- 5126/HBPCL/PC/Turn Key Work For C T Stimulator/2023-24
E-53 (24-25) Modular burn care complex with essential equipment on turn key basis
Geo Tagging of 58000 Mangroves plants of Mira Bhayander Municipal Corporation Under Turn key Project