Loading…
Loading…
25,584 results • Best match
Upgradation to two-lane with paved shoulder of Hanumangarh to Kenchiyan from km 0.000 (existing chainage Km 23.200) to Km 49.605 (existing chainage Km 74.645) of NH-54 in the state of Rajasthan on EPC mode
Widening to 4 Lane with paved shoulder Configuration of Vodarevu Chilakaluripet Section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh under Annual Plan 2022 23
Construction of Underpasses VUP LVUP SVUP for long term mitigation measures on MoRTH identified blackspots and other Potential Blackspot locations in Lakhnadon section of NH 34 and Sleemnabad to Lakhnadon Section of NH30 on EPC Mode.
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.
Consultancy Services for Supervision Consultants of New NH-354 section from Khemkaran to start of Amritsar Bypass from Km 22.673 to Km 71.496 for length of 48.822 Km on EPC mode in the State of Punjab
Construction of Two-Lanes with-without paved shoulders from km 0.000 to km 69.480 (Design) of Sanquelim to Belagavi Section of NH-748AA in the State of Goa and Karnataka on EPC Mode under Bharatmala Pariyojana
FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 OLD NH 30 FROM KM 54.530 TO KM 115.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PH-I ON EPC MODE PACKAGE II
CS for AE of Const. of 4L South East Bypass for Azamgarh City connecting NH28 at exist Ch. Km 218.800 to Purvanchal Expressway at exist Ch. Km 247.850 TL 14.905 Km in UP on EPC Mode
Permanent Rectification of Black Spots TN-(05)-077, TN-(05)-078, TN-(05)-076, TN-(05)-075 in Salem to Ulundurpet section of NH-79 in the State of Tamil Nadu on EPC mode - 2nd Call
Permanent Rectification of 7 Nos. Blackspots in Madurai - Tuticorin Section of NH-38 and Permanent Rectification of 4 Nos. Blackspots in Tuticorin - Tirunelveli Section of NH-138 in the State of Tamil Nadu on EPC Mode
Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur Gondal Rajkot section from km 117.600 to km 185.000 on NH27 (old NH8B) in Gujarat on EPC mode.
Design and Construction of 6 lane Standalone single span Grade Separated structure at Km 532 552 on Gonde Vadape section of NH 3 New NH 848 in the state of Maharashtra balance work on EPC Mode
Construction of 6-lane VUP at Km 94.909 including construction of New Service Road on Kaithal to Rajasthan /Haryana Border section of old NH-65 (new NH-152) in the state of Haryana on EPC mode.
UPGRADATION OF ROAD KARGIL-DUMGIL (BATALIK ROAD) FROM CL-9 TO NHDL SPECIFICATIONS FROM EXISTING KM 35.160 TO KM 49.754 (DESIGN CHAINAGE KM 0.000 TO KM 14.594) UNDER PROJECT VIJAYAK, IN LADAKH (UT) ON EPC MODE
Consultancy services for Authoritys Engineer for Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh.
Consultancy services for AE for supervision of Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24-913 (near Nandura) in the state of Maharashtra on EPC mode.
CS for AE for Supervision of Upgradation and rehabilitation of Service Roads on both sides in urban areas of Pune City on Pune Satara sec of NH48 in Maharashtra on EPC Mode under NH(O) Projects.
Construction of 4 lane Greenfield North East side Gorakhpur bypass (26.616 kms) starting from NH29E (Km 83.308) and end at NH28 (Km 285.100) under NHDP Phase-7 in Uttar Pradesh under Bharatmala pariyojana on EPC mode
Slope Protection Works for the location at Km 227.7 to 228.5 of four Laning of Hassan Marnahalli Section of NH48 New NH75 from Km. 189.700 to Km.237.000 in the State of Karnataka on EPC mode
Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH-2 from Km. 215.000 to Km. 230.000 and from Km 280.000 to 295.000 as per Crash Vulnerability Audit Report on EPC Mode
Construction of 4 lane access controlled highway from Samarlakota to Achampeta Jn (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH16 connectivity in Andhra Pradesh on EPC mode under Bharatmala Pariyojana
CS for AE for Supervision of Cons of 4lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 of NH543(Design Length 41.210 Km)under BMP in Madhya Pradesh and Maharashtra on EPC Mode.
Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode.
Consultancy Services for AE for Supervision of 4 Laning of Akola to Medshi from Km 0.000 to Km 47.700 of NH-161 including Bypasses at Patur and Medshi in the state of Maharashtra on EPC Mode.
RFP for Construction of 5 No. FOBs between Solan to Kaithlighat section of NH22 (Now NH 05) from Km. 106.139 to Km. 129.050 under NHDP Phase III of EPC mode in the state of Himachal Pradesh.
Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in Jharkhand
Construction of 8Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi and near Bhamaiya village in Panchmahal district (Ch.756.052-781.282) section of Delhi-Vadodara GAon EPC Mode under BMP in Gujarat
Long Term Remedial Measures at Muguru Dodda Aladamara to Kumar Farm and Tirumala Tower to SVP Nagar on Kerala Border to Kollegala section on NH766 Old NH 212 in the State of Karnataka under EPC mode
Engagement of user fee collection agency on the basis of CB through e-tender for Vishankhedafor rehabilitation and up-gradation of Jabalpur-Bhopal section of EPC mode under NHDP-III in the state of Madhya Pradesh
4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I
CS for AE for Supervision of balance work and Operation and Maintenance of project of Four Laning of Kodebad Dhamtari section (Km 43.400 to Km 82.209) of NH30 in Chhattisgarh under NHDP IV through EPC mode
Construction of 6-Lane Durg Raipur Arang Bypass section of NH-53 from design ch. 0.000 (Vill. Tendesara) to design ch. 44.500 (Vill. Parsada) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package A)
Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode
Permanent Rectification of Black Spot TN(02)039 by Constructing a LVUP (12m X 4m) at km.130.200 (Poottuthakku) in the project of Krishnagiri -Walajahpet section of NH-48 (Old No NH-46) on EPC mode
slope protection work in Ghat Section from Km 219.280 to 226.750 of four Laning of Hassan Maranahalli Section of NH48 New NH75 from Km. 189.700 to Km.237.000 in the State of Karnataka on EPC mode
CONSTRUCTION OF ROAD KIBITHU KUNDAO FROM KM 0.000 TO KM 52.000 DESIGN LENGTH 0.000 TO 19.557 KMS GREEN FIELD ALIGNMENT TO NHSL SPECIFICATIONS UNDER PROJECT UDAYAK IN ANJAW DISTRICT OF ARUNACHAL PRADESH STATE ON EPC MODE
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
Construction of Long Term Remedial measures for River Cut bank erosion at 3 nos locations RC17 RC24 RC27 between Kullu Manali section of NH03 old NH 21 in the state of Himachal Pradesh on EPC mode
Construction of Four Lane VUP at Km. 649.617 including Service Road and Drains at Hanuman Tekari and other miscellaneous work on Abu road- Swaroopganj Section of NH-27 in the state of Rajasthan on EPC mode
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh
Rehabilitation and Up-gradation for Yedshi-Latur road Section of stretch, NH- 63, starting from Ch. 24-350 to Ch. 61-875 Km (Length-37.525 Km) to 4LPS in the State of Maharashtra on EPC Mode.
CS for Supervision of Dubrajpur Bypass with 4lane configuration of length 5.676 km on NH-60 from design chainage 0.00 to design chainage 5.676 in the district of Birbhum West Bengal on EPC Mode 2nd Call
Construction of 02 Lane Rail Over Bridge at LC No 47 Excluding Railway Portion at Lucknow Jafrabad Rail Section of NR on Akbarpur Kadipur Chanda Patti Delhupur SH-128 Road in Distt Sultanpur om EPC Mode.
Construction of Srinivasapura Bypass from existing Km 453 890 Design Ch 0 000 to existing Km 461 450 Design Ch 10 080 on NH 69 in the State of Karnataka Under NH O on EPC mode
Consultancy services for Authoritys Engineer for Supervision of Rehabilitation and up-gradation of Sabalkhed to Ashti and Chinchpur to Jamkhed of NH-561 to 2PLS/Four lane configurations in the state of Maharashtra on EPC mode
Strengthening of the road from Km 152.0 to 157.0, Km 175.0 to 180.0 and Km 198.0 to 203.0 of Jagityal to Khammam road of NH 563 in the state of Telangana under EPC Mode 2nd call.
Strengthening to road connecting NH-61 - Belhe - Alkuti - Devibhoyre - Nighoj - Shirur and terminating at NH753F in Pune District. NH761, section - Belhe - Shirur, km 0/00 to 48/019, in the State of Maharashtra under EPC mode
Improvement of Road Safety through provision of Vehicular Underpass and Service roads from Km 20.000 to 21 .150 on Hyderabad Bangalore section of NH 44 in the State of Telangana under NH O on EPC mode.