Loading…
Loading…
1,706 results • Best match
Periodical Renewal from Km.184.0 to 193.0 of Jagityal Karimnagar Warangal Khammam Section of NH 563 in the State of Telangana on EPC Mode 2nd call .
Periodical Renewals from km 34.4 to 39.5 and 44.3 to 46.0 of Khammam to Aswaraopeta Section of NH 365BB in the State of Telangana under EPC mode.
Partial Strengthening from km 1.5 to 10.4 and 52.9 to 59.0 of Khammam to Aswaraopeta Section of NH 365BB in the State of Telangana under EPC mode.
Periodical Renewals from km 28.5 to 30.8 and 39.5 to 44.3 of Khammam to Aswaraopeta Section of NH 365BB in the State of Telangana under EPC mode.
Strengthening to NH 63 Nizamabad Jagadalpur road from Km 98.0 to 108.000 under NH O for the year 2019 20 in the State of Telangana EPC Mode.
Construction of Flyover at Km 520.000 to 521.650 near BHEL junction on Pune Hyderabad Section of NH 65 under NHO on EPC Mode in the State of Telangana
Strengthening and improvement of road safety from Km 671.555 to Km 678.555 of NH 61 on EPC mode in the State of Telangana for the year 2021 22
Periodical renewal from Km 143.000 to 150.000 and km 160.000 to 167.000 of Jagityal to Warangal road of NH 563 in the State of Telangana under EPC mode
Construction of Foot over Bridge at Km 24 570 of Nakrekal Nagarjunasagar section of NH 565 in the state of Telangana for the year 2024 25 on EPC Mode
Periodic Renewal of the stretch from Km 0.0 to 1.9 , Km 3.6 to 7.8 on Hyderabad Bhupalapatnam section of NH 163 for the year 2021 22 on EPC mode.
Strengthening and Improvement of Road safety from Km. 59.200 to 67.200 of Sironcha Atmakur Section of NH 353C on EPC Mode under NHO-TSP in the State of Telangana
Project Management Consultancy Services for Proof checking, Construction of 4-lane bidirectional elevated Corridor from Indira Park to VST main road crossing NTR Stadium Junction, Ashok Nagar Cross Road Junction, RTC Cross road Junction and ... under Engineering Procurement and Construction (EPC)/Turnkey ... ( EPC )/Turnkey ... (EPC)/ Turnkey -
Project Management Consultancy Services for Proof Checking, Construction Supervision, Quality Assurance, Quality Control and Quality Audit for the work of "Construction of an Iconic Bridge across Mir Alam Tank Connecting Bengaluru National Highway at ... ( EPC ) ... (EPC) mode / ... mode/ Turnkey Basis
Engagement of user fee collection agency for Kothagudem fee plaza in the State of Telangana on EPC Mode and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Providing and Laying of Optical Fiber Cable (OFC) from km 22.000 to km 534.72 of Hyderabad Bangalore Highway on EPC mode in the state of Telangana, Andhra Pradesh, and Karnataka.
Periodic Renewal of the stretch from Km 9.9 to Km 18.8 on Hyderabad Srisailam section of NH765 in the state of Telangana for the year 2021 22 on EPC mode
Construction Reconstruction of 4 lane ROB in Jadcherla Town in km 17.000 to km 18.000 of Jadcherla Kalwakurthy section of NH 167 in the State of Telangana on EPC mode
Construction of Lecture Hall complex G1 floors on EPC Mode 1 basis with Civil and Electrical works at Hyderabad Central University Hyderabad Subwork/Packages: Providing inspection vehicle for the O/o Assistant Executive Engineer HYD III 4 CPWD Hyderabad during 2025-26
Periodical Renewal to Jagitial to Karimnagar to Warangal Section of NH 563 from km 81.5 to 88.0 for the year 2020 21 in the State of Telangana under EPC Mode.
Strengthening to NH61 Kalyan Nirmal Jagtial road from Km 707.055 to 719.055 and 734.550 to 745.550 under NHO for the year 2019 20 in the state of Telangana under EPC mode
Periodical Renewal from km 137.4 to 140.0 and Km.150.0 to 152.0 of Jagityal Karimnagar Warangal Khammam Section of NH 563 in the state of Telangana on EPC Mode 2nd Call.
Construction of 5 nos Foot Over Bridges (FOBs) at Km.92.830, 110.200, 113.200, 118.350 and 122.270 on Yadgiri-Warangal section of NH-163 in the state of Telangana on EPC mode
Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode
6 laning of existing 4lane stretch of NH44 from Gundlapochampally Design chainage km 471.300 to Bowenpally Design chainage km 481.331 total length 10.031 km in Telangana on EPC mode under BMP
Improvements and widening to 6 lane plus PS with drains from Km 14.200 to Km 18.600 of Hyderabad to Bhopalapatnam section of NH 163 in state of Telangana Under EPC mode.
Periodical Renewal from km 157.0 to 1600 and Km. 169.0 to 175.0 of Jagityal Karimnagar Warangal Khammam Section of NH 563 in the state of Telangana under EPC Mode 2nd call.
Project Management Consultancy Services for Proof Checking, Construction Supervision for Design and Construction of Down ramp of PVNR Expressway at Laxminagar, Hyderabad under EPC basis.
Widening of Existing 2 lane bridge to 4 lane at Km 4.4 of Nizamabad Jagdalpur Section of NH 63 in the state of Telangana under Annual Plan 2021 22 on EPC mode
Construction of VUP including approaches and Service Roads at Shedgaon Junction at Existing Ch.59.455 (Design Ch.59.437) of NH-44 on Nagpur Hyderabad section in the State of Maharashtra on EPC mode
Conducting survey using Network Survey Vehicle for the work Widening to two or four lane with paved shoulders from km180.6 to 223.0 of NH-63 on Nizamabad-Jagdalpur road on EPC mode 3rd Call
Widening to 2 lane with paved shoulders from Km 62.920 to Km 106.830 of Medak Yellareddy Section of NH 765D in the state of Telangana on EPC Basis
Periodical Renewal of the stretch from km 0.000 to 0.970 of Janagaon Tirumalagiri section and from km 0.000 to 5.180 of Janagaon Duddeda section of NH 365B in the state of Telangana on EPC Mode
Permanent Restoration of Flood-Damaged Sections from Km 92.000 to Km 119.000 of Two-Lane with Paved Shoulder stretch in Tanamcherla to Jamandlapally Section of NH-365 in the State of Telangana on EPC Mode.
Construction of 4 lane Vehicular Underpass VUP at Aler Jeedikal Cross Road at Km 72.010 along with Slip or Service Roads on Hyderabad Warangal section of NH163 in the state of Telangana on EPC mode.
AE services for 6-lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad- Banglore Section of NH-44 in Telangana under BMP on EPC Mode.
Periodic Renewal of the stretch from km 56.9 to 60.0 Kodangal Bypass and from km 74.8 to 82.3 Tandur bypass on Mahabubnagar Chincholi section of NH 167N for the year 2021 22 on EPC mode
One time improvement of existing road from Km 29/4 to 37/4 and Km 39/8 to 50/4 of NH 365BB of Suryapet - Khammam section in the state of Telangana on EPC mode
Construction of VOP near Sadahalli Gate at Km.538.832 of Ministry identified blackspot KA01 016BS for Hyderabad Bengaluru Section of NH7 from Km. 534.720 to Km. 556.840 in the State of Karnataka on EPC mode
Construction of Zonal Training Institute ZTI Building Complex and Guest house cum transit accommodation for National Academy of customs, Indirect Taxes and Narcotics NACIN at Attapur Hyderabad Telangana on Design, Engineering, Procurement and Construction EPC basis...
Providing Service of Utility Vehicle on monthly basis for the office of AE(E)-VII, CPWD, HCU Campus, Hyderabad. Subwork/Packages: Chargeable to Construction of 400 Students Mens Hotel (G plus 3) Floors on Engineering Procurement and Construction (EPC Mode-I)...
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to Two lane with paved shoulders from 106.830 to 158.496 of Yellareddy to Rudrur Section of NH 765D in the state of Telangana on EPC mode
Upgradation to two-lane with paved shoulder of Hanumangarh to Kenchiyan from km 0.000 (existing chainage Km 23.200) to Km 49.605 (existing chainage Km 74.645) of NH-54 in the state of Rajasthan on EPC mode
Strengthening of the road from Km 152.0 to 157.0, Km 175.0 to 180.0 and Km 198.0 to 203.0 of Jagityal to Khammam road of NH 563 in the state of Telangana under EPC Mode 2nd call.
Improvement of Road Safety through provision of Vehicular Underpass and Service roads from Km 20.000 to 21 .150 on Hyderabad Bangalore section of NH 44 in the State of Telangana under NH O on EPC mode.
PR from Km 128.0 to 132.0 and 144.00 to 150.0 Warangal town limits By passed Stretch of Hyderabad to Bhoopalapatnam road of NH 163 under Control of NHAI in the state of Telangana on EPC Mode.
6 lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad Bangalore Section of NH44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode.
Periodical Renewal to Jagitial to Karimnagar to Warangal Section of NH 563 from km 63.0 to 71.0, 72.0 to 75.5 and 77.0 to 81.5 for the year 2020 21 in the State of Telangana under EPC Mode.
Carrying out NSV and FWD survey for the work Rehabilitation and Upgradation of NH 167 from Km 157.707 Alinagar to Km 187.723 Miryalaguda to two lane with paved shoulders on EPC mode in the state of Telangana
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from Km 62.920 to Km 106.830 of Medak toYellareddy Section of NH 765D in the state of Telangana on EPC mode
CONSULTANCY SERVICES FOR AUTHORITY S ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from km 34.250 to km 71.675 of Khammam Kuravi Section of NH 365A on EPC mode in the State of Telangana