Loading…
Loading…
1,706 results • Best match
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Widening to 2 lane with paved shoulders from Km 0.00 to km 32.970 of Adilabad to bela section of NH 353B in the State of Telangana on EPC Mode
Construction of Minor Bridge at Km.419.285 and Construction of Box Culverts at Km.354.872 and Km.354.892 towards Flood Damage repairs on Nagpur-Hyderabad section of NH-44 in the State of Telangana on EPC Mode.
Project Management Consultancy Services for Proof Checking, Construction Supervision for Design and Construction of Up and down ramp near Pillar No.170 (at Upperpally) of PVNR Expressway under EPC basis
One time improvement of existing road from Km 0.0 to 2.360 Km 26.930 to 30.0 and Km 30.270 to 30.6 of NH 365A (left over bits) of Kodad Khammam Section in the State of Telangana on EPC mode
Construction of 2 No of FOB at Km 267. 6 to 8 and 273.0 to 2 on Mahbubnagar Jadcherla section of NH 167 in the State Of Telangana under Road Safety Annual Plan 2022 23 on EPC mode
Construction of 6 lane Light Vehicular Underpass (LVUP) (1x12x4.0m) at Km.59.825(Wangapally Motakonduru Cross Road) along with Approaches and Service Roads on Yadgiri to Warangal section of NH 163 in the state of Telangana on EPC mode
Supply, installation, testing and commissioning of 10KLPD Milk Chilling Centre on turn-key basis at Nirmal
Certain civil works in the Government quarter No.1 ,Ministers Block ,Kundanbagh, Begumpet , Hyderabad,(Turn key)
One time improvement of left over stretches at Bypasses and realignment stretches on NH 365 Nakrekal Tanamcherla section from km 0.0 to 72.0 and NH 167 Miryalaguda Kodad Section Km 187.723 to 234.434 in Telangana State on EPC Mode
Consultancy Services for preparation of DPR for Widening to 2 lane or 4 lane from Km 0.000 to 33.000 of Adilabad Bela section of NH 353B in the state of Telangana under Annual Plan 2021 22 on EPC mode
Consultancy services for investigation of approach road and bridge work of Widening of existing 2 lane bridge to 4 lane at Km 4/4 on Nizamabad -Jagdalpur section of NH 63 in the state of Telangana on EPC Mode.
Long Term Rectification of MoRTH identified Blackspots 17 and Removal of 2 At-Grade Junctions and allied works on existing 4-6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000-Km.221.500 in Telangana on EPC mode
Permanent rectification of Accident Spot at Lingampally X Road for construction of VOP at Km 463.138 on MH KNT Border to Sangareddy Section of NH 65 Old NH 09 in the state of Karnataka and Telangana on EPC mode
Periodical Renewal to Duddeda Siddipet Siricilla road NH 365B from km 154.0 to km 155.0, km 160.0 to km 175.0 and km 179.0 to km 183.570 for the year 2021 22 in the state of Telangana on EPC Mode
Arresting the leakages along with certain Civil works at High Court Building at Barkatpura , Hyderabad (Turn key)
Supply, installation,testing and commissioning of curd plant on turn key basis at Peddakarpamula in Nagarkurnool District
Arresting leakages in the Electrical sub station located in the premises of High Court , Hyderabad Turn Key
Certain Civil and drainage works in Servant quarters at Nyayavihar complex , Shaikpet , Hyderabad (Turn key)) 6th call
Drilling of Bore well in the III Additional District and Sessions Judge Court complex , Kukatpally (Turn key)
Consultancy Services for Authority Engineer for Supervision of Construction of Two Lane with Paved Shoulders for Gowrelly to Valigonda Section from Km 0.000 to Km 41.920 Green Field Alignment of NH 930P in the State of Telangana on EPC Mode
Periodical Renewal to Jagityal Karimnagar Warangal Section NH 563 from km 25.0 to 26.2 , 26.4 to 6 , 26.8 to 27.2 , 27.4 to 6 and 27.8 to 35.0 for the year 2020 21 in the state of Telangana under EPC mode.
Conducting survey using Network Survey Vehicle for the work of Widening to 2 lane 4 lane with paved shoulders from Km182 120 to 227 6 of on Haggari jadcherla Road on EPC mode NH O in the State of Telangana
Widening and Strengthening of existing intermediate lane or two lane to two lane with paved shoulders from km 678.555 to km 699.655 of Nirmal to Khanapur section of NH 61 Extended in the state of Telangana under NHO on EPC mode
Consultancy services for preparation of Detailed project Report for Widening of Existing 2 lane to 2 lane with Paved shoulders from km 279.150 to 290.500 on Hyderabad Bhupalapatnam road of NH 163 in the state of Telangana under EPC mode
Consultancy Services for Authority s Engineer for Construction of elevated corridor at the congested areas and widening of the existing road to six-lane along NH-44, RR-12 and SH-01 Road in the State of Telangana on EPC Mode
Periodical Renewal to Jagityal Karimnagar Warangal Section of NH 563 from km. 75.5 to 77.0, Km. 90.0 to 93.0, Km.95.0 to 96.0 and Km. 97.0 to 100.0 for the year 2020.21 in the state of Telangana on EPC Mode.
Conducting survey using Network Survey Vehicle for the work Widening to 2 lane with paved shoulders from Km.59.50 to Km.132.033 of Manneguda to Ravulapally Section of NH 163 (ErstwhileSH-4) on EPC mode in the State of Telangana
Balance Works for 6 laning of existing 4 lane stretch of NH 44 from Gundlapochampally (Design chainage km 471.300) to Bowenpally (Design chainage km 481.331) total length 10.031 km in the State of Telangana on EPC mode under Bharatmala Pariyojana.
One time improvement of existing road from Km 1/0 to 8/4, Km 9/0 to 10/9 and Km 19/3 to 21/8 of NH 365BB of Suryapet - Khammam section in the state of Telangana on EPC mode
Construction of 6-Lane Flyover at AIIMS Bibinagar from Km.32.125 to Km.33.825 under MoRTH identified Blackspot TS-05-128 for the period 2019-21 on Hyderabad-Yadgiri section of NH-163 in the state of Telangana on EPC Mode.
AE for Long Term Rectification of MoRTH identified Blackspots 17 and Removal of 2 AtGrade Junctions and allied works on existing 4/6 Lane Hyderabad Vijayawada section of NH65 from Km.40.000 to Km.221.500 in Telangana on EPC mode
AE Services for 6 laning of existing 4 lane stretch of NH-44 on Nagpur-Hyderabad Section in Tel. under BMP on EPC Mode from Kallakal at Km.454.000 toGundlapochampally at Km 471.000 from Gundlapochampally at Km. 471.300 to Bowenpally 481.331
6 laning of existing 4 lane stretch from Kalkallu at km. 454.000 to Gundla Pochanpally at km 471.000 on Nagpur-Hyderabad section (Design length 17.000 km) of NH-44 in the state of Telangana under Bharatmala Pariyojana on EPC Mode
Balance work of 6 lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad Bangalore Section of NH 44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode
Widening and Improvement of existing carriageway to 2 lane with paved shoulders from Km 86.160 to 131.730 of Jangaon to Duddeda section of NH 365B in the State of Telangana on EPC Basis
Widening and strengthening to 2 Lane and 4lane with paved shoulders from km 0.000 to km 60.255 of Mahabubnagar to Chincholi section of NH 167N in the State of Telangana on EPC Basis
Tender for Construction of Vertical Extension on the Existing Library Buildingat Palamuru University Campus Bandameediapally Mahabubnagarand Construction of Boys Hostel and Girls Hostel Buildings at PG Center Wanaparthy in Telangana on EPC basis.
SR for certain civil and sanitary works at Quarter No B4/F1 at Kaladera Colony,Hyderabad(Turn key)
Renovation of Assistant Registrar chambers 1st floor of two storied Building in the High Court premises (Turn Key)
Certain Civil repairs and renovation works to be undertaken in the first floor of Ashokvihar , Hyderabad (Turn key)
Supply, Installation, testing and commissioning of 10KLPD Milk Chilling Centre on turn-key basis at Peddakarpamula, Nagarkurnool District
S.R for certain civil works in Govt. Qtr. No. B4/F3 at Madannapet Colony, Hyderabad. (Turn key Basis)
SR for certain civil and sanitary works to Govt quarter no :- B3/F4 at Kaladera colony (Turn key)
Providing Mechanical Passenger Lift (2 Nos) in the Senior Civil Judge's quarters at West Marredpally , Secunderabad (Turn Key)
Widening from 2 Lane to 4 Lane of reach from Km 1.5 to 3.7 under Long Term Rectification of blackspots ID TG 02 205 TG 05 181 on Khammam Aswaraopeta Section of NH 365BB in the state of Telangana on EPC mode
Consultancy services for Authority Engineer for Supervision of Widening Strengthening of existing IL or 2lane to 2lane with PS from km 678.555 to km 699.655 of Nirmal to Khanapur section of NH 61 Extended in the state of Telangana on EPC mode
Consultancy Services for preparation of Detailed Project Report for widening of existing 2 lane to 2 lane with paved shoulders from Km. 0/0 to 46/4 on Jangaon-Duddeda Section of NH-365B in the State of Telangana under EPC Mode
Strengthening of the road from Km.152/0 to 157/0, Km.175/0 to 180/0 & Km.198/0 to 203/0 of Jagityal to Khammam road of NH-563 on EPC Mode. Sub-Work:- Coducting the NSV & FWD Survay.( 4th Call).
Providing Pedestrian Guard Railing and Construction of FOB in Tukkuguda town limits from Km 17.4 to 18.4 on Hyderabad Srisailam road section of NH 765 in the State of Telangana under Road Safety Annual Plan for the year 2022 23 on EPC mode
Construction of 6 Lane Flyover(1x25.1x30.1x25) at Km.21.076 (Ghatkesar Junction of MoRTH identified Blackspot TG 03 187) and LVUP (12mx4m) at Km.21.890 (Ghattumaisamma Junction) on Hyderabad to Yadgiri Section of NH 163 in the State of TS on EPC Mode