Loading…
Loading…
1,707 results • Best match
Laying of New Drainage Pipe line place of damaged lines, Certain civil and sanitary works at Staff Quarters at Road No.13 Banjara Hills Hyderabad(Under Turnkey) Call 2
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Nandimyadaram (V) in Dharmaram (M) of Peddapally Division of Operation Circle Peddapally under partial turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Mattewada (V) in Gudur (M) of Mahabubabad Division of Operation Circle Mahabubabad under partial turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Sagaram (V) in Zaffergadh (M) in Ghanpur Division of Operation Circle Jangaon under partial turnkey basis
Sub Work: Renovation of Gents and Ladies general toilets at Ground floor and first floor of Annex Building located in the premises of Telangana Legislative Assembly, Hyderabad. (Turnkey Basis)
Detailed Design and preparation of working drawings, Construction and Establishment of ABSL 2 Laboratory Facility and associated works at NIAB, Hyderabad, Telangana on Turnkey Basis as per NIT Specifications.
Design, Supply, Installation and commissioning of Pre-Weigh Truck Loading Systems (PWTLS), 2 Nos. with Single Gantry on turnkey basis including 3 years AMC for Kistaram OC, KGM Area
Certain Civil and Sanitary works in the P/o R&B Office Complex Building and O/o Executive Engineer, Central Buildings Division, A.C. Guards, Hyderabad. (Under Turnkey) - Call-4
Erection of 2 nos. 33/11 KV substations at G.S.Estate and Dehagaom (with 25% Agency allowance on labour portion) in Adilabad division of Adilabad Circle on partial turnkey basis
Erection of 33/11KV (GI) substation with connected 33KV & 11KV lines at Ramsingh Thanda (V) Sarangapur (M) Nirmal Division and Circle under T&D /SI on partial turnkey basis
Erection of 33/11KV substation (GI) with connected 33KV & 11KV lines at Huzurabad (town), Huzurabad (M) Huzurbad Division and Karimnagar Circle under T&D /SI on partial turnkey basis
Erection of 33/11KV (GI) substation with connected 33KV & 11KV lines at Rayagudem (V) in Hanamkonda Rural Division of Hanamkonda Circle under T&D/SI on partial turnkey basis
Supply erection testing and commissioning of 400/220kV Damaracherla SS, 2 Nos bays at 400kV Jangaon SS and connected lines on turnkey basis under Yadadri Thermal Power evacuation scheme.
Erection of 33/11KV substation (GI) with connected 33KV & 11KV lines at Double bedroom Colony (Shyampet) (V) Hanamkonda Division and Circle under T&D /SI on partial turnkey basis
Execution of various works for System Strengthening Improvement and Renovation of Rural Distribution Network in Sirpur Kagaznagar Division in Komuram Bheem Asifabad Circle of TSNPDCL on partial turnkey basis
Construction and Commissioning on Turnkey basis of Sthambampally L.I.Scheme on Right Bank of Godavari River in Dharmapuri Mandal of Jagityal District including Operation of the scheme for Five Years
Erection of 33/11KV substation (GI) with connected 33KV & 11KV lines at Wajrakhandi (V) Jukkal (M) Banswada Division and Kamareddy Circle under T&D /SI on partial turnkey basis
Erection of 33/11KV substation with connected 33KV & 11KV lines at Odyaram (V) Gangadhara (M) Karimnagar Rural Division and Karimnagar Circle under T&D /SI on partial turnkey basis
Construction and Commissioning on turnkey basis of Rayapeta L.I.Scheme on Right Bank of Hussainmiya Vagu in Srirampur Mandal of Peddapalli District including Operation of the Scheme for Five years
Erection of 33/11KV substation (GI) with connected 33KV & 11KV lines at Polepally (V) Thorrur (M) Thorrur Division and Mahabubabad Circle under T&D /SI on partial turnkey basis
Construction and Commissioning on Turnkey basis of Dammannapeta L.I.Scheme on Right Bank of Godavari River in Dharmapuri Mandal of Jagityal District Including Operation of the Scheme for Five Years
Renovation of toilets of Minister room 31,32 and providing new GYP board false ceiling in CMO office in the p/o Telangana Legislative Assembly, Hyderabad (Turnkey Basis) (3rd Call)
Erection of 33/11KV Sub-Station at Adavisomanpalli (V) in Manthani (M) of Manthani Division of Operation Peddapally Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Sub-Station at Akkarajupally (V) in Tharigoppula (M) of Jangaon Division of Operation Jangaon Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Substation at Gudem (V) in Chithalamanepally (M) of Sirpur Khagaznagar Division of Operation Asifabad Circle under T and D/ SI Scheme on partial turnkey basis..
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Royyur (V) in Eturungaram (M) of Mulugu Division of Operation Circle Bhupalpally under partial turnkey basis
Providing renovation of toilets, along with other civil and sanitary works in Quarter No.305, Main Block, MS-III, 120 Flats MLAs Residential Complex at Hyderguda, Hyderabad. (Turnkey Basis)
SUPPLY INSTALLATION & COMMISSIONING OF AUTOMATIC ALXE BOX TEMPERATURE RECORDING SYSTEM (HOT AXLE HOT BOX DETECTOR SYSTEM WITH ELECTRICAL POWER SUPPLY ARRANGEMENTS) ON TURNKEY BASIS AS PER THE SPECIFICATION ATTACHED
Supply, erection, testing & commissioning of following works on turnkey basis (i) 1No.132KV bay at existing 132/11KV Kothakota LIS for 132KV RTSS Wanaparthy(ii)132KV DC/SC line from existing 132/11KV Kothakota LIS to proposed RTSS Wanaparthy for a ... on turnkey basis
C/o. Administrative Building (G plus 3 Floors) i/c internal Water Supply, Sanitary Installations and Development & Bulk Services which include OHT, UG Sump, Pump Room over UG sump, external water supply, tube wells, external sewerage, septic tank, ... on EPC Mode -I ...
Renovation of toilets, replacement of windows, gypsum false ceiling, granite platform, painting and other civil works at qtr no 801 MS II, at Old MLA qtrs, Hyderguda, Hyd (turnkey basis)
Erection of 33/11 KV SS at Palvoncha Town (4 Roomed 1x5 MVA PTR) of Kothagudem division of Khammam Circle under Integrated Power Development Scheme (IPDS) on partial turnkey basis
Erection of new 33 KV lines for takeoff arrangements from new 132/33 KV SS at Bachannapeta in Jangaon division of Jangaon Circle under P:SI scheme on partial turnkey basis
Erection of new 33 KV lines for takeoff arrangements from new 132/33 KV SS at Kotagiri in Bodhan division of Nizamabad Circle under P:SI scheme on partial turnkey basis
Estimate for Additions, alterations and renovations of toilets to the residence earmarked to the Chief Secretary of the state at Quarter No. 04, (Block - C) at Kundanbagh, Hyderabad. (Under Turnkey)
Cleaning of Sump and Overhead Tank and certain Civil and Sanitary works in the P/o Office of Executive Engineer (R&B), Central Buildings Division, A.C Guards, Hyderabad (Under Turnkey)
Revival on Turnkey basis of Suraram L.I.Scheme on Right Bank of Kinnerasani River in Paloncha Mandal of Bhadradri Kothagudem District including Operation and Maintenance of the Scheme for Five Years
Renovation of common toilet and Other works etc in Government Quarter No. BH- 1/6 at IAS/ IPS Quarters, at Road No. 10, Banjara hills, Hyderabad. (Under Turnkey) - Call-II
Renovation of guard toilet, cupboards , UPVC winodws and other civil and sanitary work in qtr no 304 at MS II block old MLA quarters, Hyderguda, Hyderabad (turnkey basis) 3rd call
Erection of 33/11KV substation (GI) with connected 33KV & 11KV lines at Thorrur (P) (V) Palakurthy (M) Ghanpur Division and Jangaon Circle under T&D /SI on partial turnkey basis
Erection of 220KV line (9KM) with MC towers for making LILO of existing 220KV Durshed-Siricilla DC line to proposed 400/220KV SS Ramadugu in Karimnagar District on Turnkey basis.
Construction and Commissioning on Turnkey basis of Bojja Thanda and Bhimla Thanda L.I.Scheme on Vemuleru Vagu in Mattampally Mandal of Suryapet District Including operation of the scheme for Five years
Quarterly maintenance for attending normal & emergent water supply and sanitary repair work in the p/o New MLA's quarters, Adarsh nagar, hyd for 2nd qtr F.Y 2020-21 (turnkey basis)
Internal works and premises development in guest house,Block No.11(Recreation Club erstwhile Block No.12),Nyayaviahr complex , shaikpet ,Hyderabad-proposals to convert into 3 bedroom guest house (Turnkey)
Providing new toilet for Medical Officer, renovation of existing toilets, UPVC windows, ramp, internal putty and painting to Homeopathy Dispensary MS-1 at Old MLA Quarters, Hyderguda, Hyderabad. Turnkey Basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Viswanadhapuram (V) in Geesukonda (M) in Warangal Rural Division of Operation Circle Warangal under partial turnkey basis
Shifting of HT & LT lines from Ramulapally Bus Stop to Asifnagar Bus Stop for road widening works in Karimnagar town of Karimnagar Division in Karimnagar Circle on partial turnkey basis
Removing and refixing the existing tiles and certain civil and sanitary Works In Minister Quarter No. 4 at Ministers Residential Coloney at Road No. 12, Banjara Hills Hyderabad. (Under Turnkey)
Erection of 1 No 33/11KV substation with connected 33KV & 11KV lines at R&B Quarters in Karimnagar (Town) Division of Karimnagar Circle under T&D on partial turnkey basis
Quarterly maintenance of various Civil and Sanitary repairs in the premises of Raj Bhavan and Garrage Staff Quarters,Hyderabad i.e. From Sept. 2020 to November 2020 (3-Months) (Under Turnkey)