Loading…
Loading…
1,708 results • Best match
Proposal for erection of 13.31KM new DC/SC 33 KV line from 132/33KV SS Peechara in operation rural division Hanamkonda, Hanamkonda circle under T&D/SI on partial turnkey basis
Erection of new 33 KV lines for takeoff arrangements from new 132/33 KV SS at Nimmapally in Karimnagar town division of Karimnagar Circle under P:SI scheme on partial turnkey basis
Erection of 33 KV double circuit line from 132/33 KV Waddepally EHT SS to near Waddepally Church in Hanamkonda Division of Warangal Urban Circle under P:SI on partial turnkey basis
Erection of 2 nos. 33/11 KV substations at Mamidipally in Armoor division of Nizamabad Circle and Durki in Banswada division of Kamareddy Circle under T&D on partial turnkey basis
Providing and fixing synthetic membrane felt at Minister Quarters Entrance Security Room, and Certain civil and sanitary works in the Minister Banglow at Road No:- 12 Banjara Hills Hyderabad. (Under Turnkey)
Renovation of old toilets and pipelines, colouring to internal walls of rear side of lift 2nd floor of administration building in p/o Telangana legislative assembly, Hyderabad (Turnkey Basis)(2nd Call)
Painting to the Entire Quarter and Replacement of Existing Sanitary Fittings with Allied Civil and Sanitary Works to Government Residential Quarter No. T-7/5 (Ganga Block), Kundanbagh, Hyderabad(Under Turnkey)
Hiring of Consultants - Milestone/Deliverable Based - Proof Checking Consultancy as per IS18299 for Civil and Structural Engineering of EPC package For Singrauli STPP StageIII 2x800MW; Engineering Design; No; Hybrid(As specified in scope of work)
Releasing of Agl Services by erection of 25/63/100 KVA DTRs with connected 11 KV and LT lines in Banswada Division of Kamareddy Circle under IE (Distribution) on partial turnkey basis
Providing of polyethylene water storage tank with double layer at 1st floor terrace along with CPVC pipeline in the P/o Executive Engineer (R&B), Assembly building division, Basheerbagh, Hyderbad (Turnkey basis)
Erection of 33/11 KV SS to extension of supply to R&R colony at Bittupally in Manthini mandal in Manthini division of Peddapally district under 100% ORC on partial turnkey basis
Renovation of 3 Nos Ladies and 3 Nos Gents Toilets, and renovation of Secretary Toilet, Certain Civil and Sanitary works in Telengana Public service Commission at Nampally Hyderabad. Telengana State. (Under Turnkey)
Certain Civil & Sanitary repairs in Multi storied office Bldg Complex, O/o E-in-C (R&B), at Errumanzil, Hyderabad. For the period of 3-months, w.e.f 1.4.2022 (Under Turnkey) - Call-5
Erection of 1 No 33/11KV substation with connected 33KV & 11KV lines at Narayanapuram (V) in Aswaraopet (M) of Kothagudem Division of Bhadradri Kothagudem Circle under T&D on partial turnkey basis
Revival on Turnkey basis of Nagaram L.I.Scheme on Right Bank of Kinnerasani River in Paloncha Mandal of Bhadradri Kothagudem District Including Operation and Maintenance of the Scheme for Five Years (6th call)
Erection of 2 nos. 33/11 KV substations at Kothimeer and Dantanpally (with 25 % Agency allowance on labour portion) in SK Nagar and Utnoor divisions of Adilabad Circle on partial turnkey basis
Balance works of Construction and Commissioning of Roopnarayanapeta LI Scheme on Turnkey basis of Manair River in Odela Mandal of Peddapally District Including Operation and Maintenance of the Scheme for Five Years
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in NARSAMPET RURAL Sub division of NARSAMPET division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Erection of 2 Nos. 33/11KV Substations at Mutharam (V) and Mallampally (V) in Palakurthy (M) of Ghanpur Division of Jangaon Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 1 No 33/11KV substation (GI) with connected 33KV & 11KV lines at Shivalayam, Katherasala Road, Chennur (V&M) in Mancherial District & Circle under T&D/SI on partial turnkey basis
Erection of 1 No 33/11KV substation (GI) with connected 33KV & 11KV lines at Ammanagurthy in Saidapur (M) of Huzurabad Division of Karimnagar Circle under T&D/SI on partial turnkey basis
Extension of 11 KV HT Power Supply Lines with a CMD 400 KVA Load on 100% Turnkey Basis to Mahadevapuram L.I.Scheme on Wyra River in Madhira Mandal of Khammam District (3rd call)
Erection of 33/11KV Sub-Station at Theegalaguttapally in Operation section Theegalaguttapally in Karimnagar Rural Sub-Division of Karimnagar Division of Operation Circle Karimnagar under T&D /SI on partial turnkey basis
Extension of temporary supply to State Festival Sri Sammakka Saralamma Jathara-2020 at Medaram(V) under 33/11KV Sammakka new Substation area in Tadvai(M) of Mulugu Division on partial turnkey basis.
Providing painting to internal walls and renovation of toilets with new sanitary fittings opposite to lift portion of 1st floor of administration building in p/o Telangana legislative assembly, Hyderabad (Turnkey basis)
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in NARSAMPET Town Sub division of NARSAMPET division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Supplying, laying SWG pipes and certain front side Shed Reparing work in Minister Quarter no: 06 in the p/o Minister Residences Colony at Road no: 12, Banjara Hills, Hyderabad. (Under Turnkey)
Erection of 33/11KV substation(GI) with connected 33KV line at Gannevanipalle (V) in Musthabad (M) in Sircilla district under Karimnagar operation Division & Circle under T&D /SI on partial turnkey basis
Balance works of Construction and Commissioning of Indurthy LI Scheme on Turnkey basis of Manair River in Odela Mandal of Peddapally District Including Operation and Maintenance of the Scheme for Five Years
Balance works of Construction and Commissioning of Bayampally LI Scheme on Turnkey basis of Manair River in Odela Mandal of Peddapally District Including Operation and Maintenance of the Scheme for Five Years
Replacing Windows, providing new cupboards, painting, replacing CPVC line in CT, Painting and other civil and sanitary works at Quarter No. 701 MS-II at Old MLA Quarters, Hyderguda, Hyderabad. Turnkey Basis.
Renovation of toilets, replacement of kitchen cupboard and windows, along with other civil and sanitary works in Quarter No.604 MS-II at Old MLA Quarters, Hyderguda, Hyderabad. (Turnkey Basis) (3rd Call)
Contingency of C/o various building for MSME at Bhubaneswar i/c Civil, Electrical & Mechanical and Horticulture service on EPC basis.SH-Providing service of running inspection vehicle for office of the AE(E)-III, CPWD, Bhubaneswar.
Releasing of Agl Services by erection of 25/63/100 KVA DTRs with connected 11 KV and LT lines in Mulugu Division of Jayashankar Bhupalpally Circle under IE (Distribution) on partial turnkey basis
Design, Supply, Installation and commissioning of Pre-Weigh Truck Loading Systems (PWTLS) with 110 meters Gantry on turnkey basis including 3 years AMC for KOC-3, YLD Area and KTKOC-3, BHPL area.
Releasing of Agl Services by erection of 25/63/100 KVA DTRs with connected 11 KV and LT lines in Bhupalpally Division of Jayashankar Bhupalpally Circle under IE (Distribution) on partial turnkey basis
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in Wardhannapet Mandal Wardhannapet Sub division of WARANGAL division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Extension of supply to M/s. BTPS raw water line intake pump house at Ramanujavaram(V) in Manuguru Mandal in Bhadrachalam Division of Badradri Kothagudem District under 100% ORC on partial turnkey basis
Providing Sanitary fittings in place of damaged , Providing and fixing Mesh doors in Minister Quarter no: 10 in the p/o Minister Residences Colony at Road No: 12, Banjara Hills, Hyderabad. (Under Turnkey)
Erection of 132/33KV SS at Bachannapet and 132KV DC/SC line from proposed 220/132/33KV SS Jangaon to the proposed 132/33KV SS Bachannapet (13.86KM) in Jangaon District on turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Gadiguda (V and M) in Utnoor Division of Adilabad Circle under T and D/SI Scheme on partial turnkey basis.
Supply, Erection & commissioning of 36.0 KMs of 11 KV Line with 50 sq.mm covered conductor along with supports and associated accessories in Forest area under STSDF of Adilabad District under 100% turnkey basis
Quarterly maintenance for attending normal and emergent water supply and sanitary repair works in premises of Assembly Buildings at Telangana Legislative Assembly,Hyderabad for Second Quarter of the Financial Year 2022-23 (Turnkey)
Quarterly maintenance for attending normal and emergent water supply and sanitary repair works in the premises of Council buildings at Telangana Legislative Council, Hyderabad for the 3rd qtr F.Y. 2020-21 (Turnkey Basis)
Balance works of Construction and Commissioning of Madaka-III LI Scheme on Turnkey basis on Manair River in Odela Mandal of Peddapally District Including Operation and Maintenance of the Scheme for Five Years
Construction and Commissioning on Turnkey Basis of Nellikal L.I.Scheme on Foreshore of Nagarjuna Sagar Reservoir near Nellikal Village in Tirumalagiri-sagar Mandal of Nalgonda District including operation of the Scheme for Five Years
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in Rayaparthy Mandal Wardhannapet Sub division of WARANGAL division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Erection of 220KV LILO line (8.5Km) from 220KV KTS-Shapurnagar SC line to 220/132KV SS Waddekothapally ii)2Nos.220KV Bay extensions at 220/132KV SS Waddekothapally in Jangaon District on Turnkey Basis
Renovation of washroom attached to Ante room inside the chamber of Hon ble Speaker located at ground floor of annex building in the premises of Telangana Legislative Assembly, Hyderabad. (Turnkey Basis) (4th Call)
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Dhathojipet(V) in Kadam (M) in Nirmal Division of Nirmal Circle under Tand D/SI Scheme on partial turnkey basis.