Loading…
Loading…
1,708 results • Best match
Erection of 6.38KM 33KV double circuit line for 5 nos. feeders from 132 33 KV SS Padmanagar in Karimnagar Town Division of Karimnagar Circle under T and D SI on partial turnkey basis
Providing of sanitary fittings and other civil work at Minister quarter no 5 (allotted to Hon'ble Speaker of TSLA) in the p/o MRC at road no 12, Banjara hills, Hyderabad (Turnkey basis)
Certain civil and sanitary repair works to the existing toilets to arrest leakage in the O/o Executive Engineer, NH Ist floor, R&B office complex, A.C. Guards, Hyderabad. (Under Turnkey) - Call-5
Extension of 33 KV HT Power Supply Lines with a CMD 1450 KVA Load on 100% Turnkey basis to Sthambampally L.I.Scheme on Right Bank of Godavari River in Velgatoor Mandal of Jagitial District
Extension of 33 KV HT Power Supply Lines with a CMD 1000 KVA Load on 100% Turnkey basis to Velgatoor L.I.Scheme on Right Bank of Godavari River in Velgatoor Mandal of Jagitial District
Quarterly maintenance for attending normal and emergent civil, water supply and sanitary repair works in the p/o Legislator's Residential complex (MS-III block) Old MLA quarters, Hyderguda, Hyderabad (Turnkey Basis)(3rd call)
Supply,Erection, Testing & Commissioning of (i)220KV TMDC line from proposed 400/220KV SS Damaracherla to 220KV SS Miryalaguda & (ii) 2Nos 220Kv bays at 220KV SS Miryalaguda on turnkey basis in Nalgonda District
Proposal for erection of 9.55KM, 33 KV line for takeoff arrangement from newly erecting 132/33KV Pammi SS at Mallannapalem village, in Khammam Rural Division in Operation Circle Khammam under partial turnkey basis
Quarterly maintenance for attending normal and emergent water supply and sanitary repair works in premises of Assembly Buildings at Telangana Legislative Assembly,Hyderabad for third Quarter of the Financial Year 2022-23 (Turnkey)
General maintaince of civil, water supply and sanitary repairs and other civil works in the premises of Sammrudhi staff Quarter, Community Hall, School Building and police Barracks of Raj Bhavan, Hyderabad. (Under Turnkey)
Erection of two 33/11KV substations (GI) with connected 33KV & 11KV lines at Banjapally and Gajya Nayak Thanda in Machareddy Mandal of Kamareddy Division & Circle under T&D /SI on partial turnkey basis
Erection of 2 Nos. 33/11KV Substations at Somla Thanda (V) and Vemnoor (V) in Mahabubabad (M) of Mahabubabad Division of Mahabubabad Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Kesamudram-II of Kesamudram (M) in Mahabubabad Division of Mahabubabad Circle under Tand D/SI Scheme on partial turnkey basis.
Erection of 33/11KV Substations at Rebbavaram (V) in Wyra (M) and Remedicherla (V) in Yerrupalem (M) of Wyra Division of Khammam Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Kondapur (V) in Nallabelly (M) of Narsampet Division of Warangal Circle under Tand D/SI Scheme on partial turnkey basis.
Erection Testing and Commission of 1 Nos. 33/11KV Sub stations Indoor with connected 33KV and 11KV lines at Girls High School Hanumakonda in Hanumakonda Division Circle of TGNPDCL on partial turnkey basis.
Erection of 5.6 KM 33KV interlinking line from 33/11KV SS Dhamrajpally to 33/11KV SS Surajpur via Bhdanakurthy Godavari river crossing in Metpally Operation Division of Jagitial Circle on partial turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Wankidi (V) in Neradigonda (M) in Adilabad Division of Adilabad Circle under Tand D/SI Scheme on partial turnkey basis.
Arresting of low roof leakages certain civil and sanitary works and other miscellaneous works in Govt. Qtr No.BH 1/1 at IAS/IPS Quarters at Road No.10 Banjara Hills, Hyderabad.(Under Turnkey)
Architectural and Structural design and construction of office cum lab building stilt 4 floor for MPEDA on EPC Basis including Internal water supply, sanitary installations, sewer system , drainage & development of site Internal water supply sanitary installations sewerage system, Drainage & Development of site internal roads & paths external sewer lines, water supply ,storm water drains, rain water harvesting pits, Boundary wall, 11kv/0.433kv substation dg set VRV/VRF System Online 3 phase UPS System Grid Interactive roof top solar photo voltaic power generation system water supply pump sets IP based CCTV System, LAN System IP based EPABX System LED Street lighting Exhaust System Insulated Mini Cold Storage System at Bhimavaram W.G.Dist Andhra Pradesh. SH: Providing services of MTS for O/o Assistant Engineer-III/CPWD, Bhimavaram for 6 months from December 2022 to May 2023. Subwork/Packages: package
Inviting RFP for the "Consultancy services for preparation of Investigation Report, Project Preparatory Report (PPR) and EPC Tender documents for Construction of approaches to proposed new Parallel ROB adjacent to existing ROB and Vehicular Underpass across existing ROB
Supply & Erection of 11KV, LT lines & 25KVA distribution transformers for service connection to newly drilled bore wells at various locations around outer ring road as per the sanctioned estimate of TSSPDCL under turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Porumalla (V) in Medipally (M) of Metpally Division of Operation Circle Jagitial under Tand D/SI Scheme on partial turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Sirikonda (V) in Kathlapur (M) of Metpally Division of Operation Circle Jagitial under Tand D/SI Scheme on partial turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Ethonda (V) in Kotagiri (M) of Bodhan Division of Operation Circle Nizamabad under Tand D/SI Scheme on partial turnkey basis.
Erection of 33/11KV Substation with connected 33KV and 11KV lines at BRpuram (V) in Enkoor (M) of Sathupally Division of Operation Circle Khammam under T and D/ SI Scheme on partial turnkey basis
Quarterly maintenance for attending normal & emergent civil & water supply and sanitary repairs works in the P/o MS-I Old MLA quarters at Hyderguda, Hyd 1st Qtr F.Y.2020-21 (Turnkey Basis) (2nd Call)
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in Warangal and Kapula kanaparthy Sub divisions of WARANGAL division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in Chennaraopet Mandal in NEKKONDA Sub division of NARSAMPET division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Erection of 2 Nos. 33/11KV Sub-Stations with connected 33KV and 11KV lines at Jaggannapet and Lingala in Mulugu Division of Bhupalpally Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Nashkal (V) in Chilpur (M) of Ghanpur Division of Operation Circle Jangaon under T and D/ SI Scheme on partial turnkey basis
Erection, Testing and Commission of 1 Nos. 33/11KV Sub-station (Indoor) with connected 33KV and 11KV lines at Vaikuntadhamam Vajpeyee Colony, Hanumakonda in Hanumakonda Division and Circle of TGNPDCL on partial turnkey basis.
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Danora (V) in Kerameri (M) of Asifabad Division of Operation Asifabad Circle under T and D/ SI Scheme on partial turnkey basis
Extension of temporary supply to State Festival Sri Sammakka Saralamma Jathara 2020 at Medaram(V) under 33/11 KV Medaram Old substation (Kothuru) area in Tadvai(M) of Mulugu Division on partial turnkey basis
Erection of 2 Nos. 33/11KV Sub-Stations with connected 33KV and 11KV lines at Wadlakonda and Kurchapally in Jangaon Division of Jangaon Circle under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Substation with connected 33KV line at Vemulawada Temple, Vemulawada (V) in Vemulawada (M) of Karimnagar Division of Operation Circle Karimnagar under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Upparapally (V) in Kesamudram (M) of Mahabubabad Division of Operation Circle Mahabubabad under T&D/SI Scheme on partial turnkey basis.
Construction and Commissioning on Turnkey basis of Bheemghanapur L.IScheme (Segment-I) on Bheemghanapur Reservoir near Gollabuddaram Village in Bhupalapally Mandal of Jayashankar Bhupalpally District including Operation and Maintenance of the scheme for Five Years
Electrification of Households and Public Institutions in Tribal Habitations through On-Grid mode in Nekkonda Mandal in NEKKONDA Sub division of NARSAMPET division in WARANGAL Circle under DA-JGUA scheme on Partial turnkey basis
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Narsingapur (B) (V) in Bheemaram (M) in Mancherial Division of Mancherial Circle under Tand D/SI Scheme on partial turnkey basis.
Erection of 33/11KV Sub-Station with connected 33KV and 11KV lines at Dhannora (B) (V) in Indervelly (M) of Utnoor Division of Operation Circle Adilabad under TandD/SI Scheme on partial turnkey basis
Extension of temporary supply to State Festival Sri Sammakka Saralamma Jathara - 2022 at Medaram(V) under 33/11 KV Medaram Old substation (Kothuru) area in Tadvai(M) of Mulugu Division on partial turnkey basis
Erection of 33/11 KV Substation with necessary associated equipment and connected 33KV &11KV lines for proposed 33/11 KV SS at E-city, Raviryala(V), Maheshwaram (M) , RR District, Telangana on turnkey basis.
Extension of temporary supply to State Festival Sri Sammakka Saralamma Jathara - 2024 under 33/11 KV Medaram Old substation (Kothuru) area at Medaram(V) in Tadvai(M) of Mulugu Division on partial turnkey basis
Construction and Commissioning on Turnkey basis of Peddamidisileru L.I.Scheme on Right Bank of Pagidi Vagu in Cherla Mandal of Bhadradri Kothagudem District including Operation and Maintenance of the scheme for Five Years (2nd call)
REVISED ESTIMATE FOR SHIFTING OF LT LINE FROM AMBEDKAR CHOWRASTA TO RAMA TALKIES IN WANAPARTHY TOWN IN OPERATION DIVISION IN WANAPARTHY IN OPERATION CIRCLE WANAPARTHY (UNDER TURNKEY) UNDER BPS/ LRS FUNDS IN WANAPARTHY MUNICIPALITY.
Extension of supply to Angarika Township at R.K. Colony of Thimmapur Mandal of Operation Section Nusthulapur of Nusthulapur Sub-division of Karimnagar Rural Divison of Karimnagar Circle under 100% SLC on partial turnkey basis
Supply, Erection & commissioning of 53.61 KMs of 11 KV Line with 50 sq.mm covered conductor along with supports and associated accessories in Forest area under STSDF of Bhadradri Kothagudem District under 100% turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at New Collectorate, Battisavargaon in Kathlapur (M) of Adilabad Division of Adilabad Circle under T and D/ SI Scheme on partial turnkey basis
Renovation of 5 nos toilets with sanitary fixture, marble floor Polishing , providing Cupboards and certain civil works in Minister Quarter No:11 at Ministers Residential colony Road No:12 Banjara Hills Hyderabad. (Under Turnkey)