Loading…
Loading…
1,708 results • Best match
Quarterly Maintenance for attending normal and emergent civil, water supply and sanitary repair works in the premises of Legislators Residential Complex (MS III Block), Old MLAs Quarters, Hyderguda, Hyderabad for the First Quarter of the Financial ... ( Turnkey Basis)
Quarterly Maintenance for attending normal and emergent civil, water supply and sanitary works in the New Council Building and other Council Buildings located in the premises of Telangana Legislature Secretariat, Hyderabad for the First Quarter of ... ( Turnkey basis)
Setting up of Feacal Sludge and Septage Treatment Plants (FSTPs) by Supply Installation, commissioning non-mechanized FSTP plant at Injapur Lake, Abdullapurmet Mandal for 20KLD on turnkey basis including Manning, Operation and Maintenance of FSTP and its assets for a period of 2 years
Supply and Erection of 132 KV DC Line from Loc.No.10 near Sanghiguda junction to Loc.No.31 (proposed 132kV DC line from 220kV SS Shamshabad to 132kV RTSS Thimmapur) in Median of HMDA P1 road from Chinna Golconda to Palmakula (9 KM)on turnkey basis
Proposal for extension of supply to HT Cat-IX service, with a CMD of 6000KVA @ 33KV level for Electric Vehicle Charging Station to Depot Manager, TSRTC, Warangal-1 at Chowrastha Hanumakonda in Hanumakonda Town division of Hanumakonda circle under ... partial turnkey basis
Conversion and strengthening of single phase HT & LT network into three phase network by erecting required 11 KV & LT lines and 3-Phase DTRs in Sirpur Kagaznagar, Dehagaon , Sirpur, Kowtala, Chintalamenepally of Sirpur Kagaznagar division of Asifabad ... partial turnkey basis
Renovation of Toilet, Laying of New pipe line in place of damaged pipe line at 2nd floor (Pent House) and Certain Civil & Sanitary Works In Minister Quarter No. 10 at Ministers Residential Complex at Road No. 12, Banjara Hills Hyderabad. (Under ... (Under Turnkey )
Erection of 1No 33/11KV Sub Station with connected 33 KV, 11 KV and LT lines and Erection of DTRs for extension of supply to 750 Plots (R&R Colony) at Ratnapur (Vill) Ramagiri Mandal of Manthini Division in Peddapally Circle on partial turnkey basis
Setting up of Feacal Sludge and Septage Treatment Plants (FSTPs) by Supply Installation, commissioning non-mechanized FSTP plant at Nagaram Lake, Keesara Mandal for 20KLD on turnkey basis including Manning, Operation and Maintenance of FSTP and its assets for a period of 2 years
Supply, erection, testing and commissioning of stringing of 2nd circuit on existing 132kv DC/SC line from Shaligowraram to Mothkur line (22KM), 1 no bay extension at 132KV SS Shaligowraram and 1 no bay extension at 132KV SS Mothkur on turnkey basis in Nalgonda Dist.
Erection, testing and commissioning of new 33/11KV Substation with connected 33 KV, 11 KV line lines and Construction of Control room, retaining wall for switchyard and compound wall for substation at TSIIC Industrial Park, Thuniki Bollaram (V), ... on Turnkey basis.
Extension of power supply under HT cat-II, 625KVA to M/s Warora-Kurnool Transmission limited(WKTL) for Auxiliary supply to 765/400KV SS at Thimmampet (V) in Zaffergadh section of Ghanpur SD & Division of Jangaon circle under 100% SLC on partial ... partial turnkey basis
Design, engineering, manufacturing, testing before dispatch, loading, supply for destination including transportation, civil & construction works, erection, testing and commissioning of Two (2) Nos. 400kV Bays for installation of 125MVAR Bus Reactors ... on turnkey basis
Supply, Erection, Testing and Commissioning of (i) Laying, Jointing and Terminations of 132kV 630Sqmm XLPE DC UG Cable from 132/33kV Asifnagar to proposed 132/33kV GIS Seetharambagh SS (4.2Km) and (ii) Supply & Erection of 3 Nos 132kV Bays at ... on turnkey basis.
DC Work- Shifting of existing 132KV DC/SC line (1.1 Km) from 220/132/33 KV SS Siricilla to M/s ReNew Ranga Reddy Solar Power Pvt Ltd at Sircilla for Railway line crossing at chainage No.102550 in Siricilla district on Turnkey basis
Estimate for certain renovation works inside Honble Chief Minister chamber, ante room and washroom along with provision for waiting lounge in duct area located beside Honble CM Chamber at ground floor of Annex building in the premises of Telangana ... ( Turnkey Basis)
Strengthening to NH 63 in stretches from Km 136.8 to Km 139.0,Km 140.0 to Km 144.0, Km 145.0 to Km 147.0,Km 156.0 to 157.0, Km 163.0 to 164.0, Km 166.0 to Km 168.0, Km 170.0 to Km 173.4 and Km 174.2 to Km 180.600under NH O in Telangana EPC.
Flux Reference System 1, AMC 2, AMC 3, AMC 4, AMC 5, Sensor 6, Sensor 7
Renovation of Security room with toilet , at Entrance side , Replacement of old and damaged FRP sheet with GI Profiled sheet , certain civil and sanitary works in Minister Quarter no: 10 in the p/o Minister Residences Colony at Road no: 12, Banjara ... (Under Turnkey )
DC work Supply Erection Testing and commissioning of extra 132kV Bays for HMWS and SB Bulk feeders at 132kV SS Kodandapur 132kV SWS Nasarlapally 132kV SWS Godakandla by providing summation meters to avoid power supply interruptions and for proper ... on Turnkey Basis
Erection of 3 Nos. 33/11KV Sub-Stations with connected 33KV and 11KV lines at Collectorate (Warangal) GI substation in Warangal Town Division, Gurijala in Narsampet Division and Jagannadhapally in Warangal Rural Division of Warangal Circle under T ... partial turnkey basis.
Providing of washbasin, water closet commode, cement flooring in lawn garden in front of building and water supply and sanitary connection at Minister qtr no 5 (allotted to Hon'ble speaker TSLA) in the p/o Minister residential complex(MRC), roadno ... Hyd( Turnkey basis)
Supply, Erection, Testing & Commissioning of (i) 132/33KV SS at Nagaram and (ii) 132KV line for making LILO of 132KV DC/SC line from 132/33KV SS Thungathurty to 400/220/132KV SS Suryapet to proposed 132KV SS Nagaram (12km) on turnkey basis in Suryapet District
Shifting of DTRs, HT/11 KV Lines which are coming in the alignment of parallel canal (from Desaipally SS-II to Vilasagar 33/11 KV SS) on left side of floor flow canal in various villages of Boinpally operation section in CESS jurisdiction under Semi ... Semi turnkey basis
Erection of 32 KM of 33 KV alternate line for enhancement of load of SC.No.PDL-252 to M/s. Executive Engineer LIS Div.1 TS Transco KNR at Goliwada Sundilla (V) in Operation section, Anthergaon of Operation Division, Manthini in Peddapally Circle on ... partial turnkey basis
Erection of 8.5 KM of 33 KV line from 132/33 KV SS Narmetta to 33/11 KV SS Tharigoppula to give over load relief (OLR) on 33 KV Ankushapur feeder in Tharigoppula section, Jangaon Division of Jangaon Circle under T&D improvement on partial turnkey basis
Supply,erection, testing and commissioning of "Raising of height of teh conductor between loc No 10 and Loc No 11 of LILO of Gajwel-Chegunta to 400KV Gajwel (Length:1.5KM) for teh propsoed Manoharabad to Kothapally railway line under DC works on ... on turnkey basis ...
Execution of Seven (7) Nos. 400kV Bays for installation of 125 MVAR Bus Reactor one each at Suryapet SS Maheshwaram SS Jangaon SS Two Nos at Dindi SS and One No 80 MVAR Bus reactor and 63 MVAR line Reactor at Asupaka SS on turnkey basis
Erection of 1 No. 33/11 KV SS with 2x8 MVA PTRs and connected 33 KV lines at Kaleswaram Lift Irrigation Scheme, Stage-II pump house at Garepally (V) of Kataram (M&S) in Kataram sub-division of Bhupalpally division of Bhupalpally Circle on partial ... partial turnkey basis
Providing of water supply, sanitary fittings and painting of internal wall servant Qtr no 22,20,08,13 and 12 at road no 13 attached to residence of Hon'ble Speaker, Telangana Legislative Assembly of Qtr no12 at Minister Residential complex (MRC) Road ... ( Turnkey Basis)
Proposal for erection of 18Nos M+6 Towers for height of existing 1.38KM 33KV DC line from Waddepally church junction to Gopalpur Cheruvu bridge along the 100 feet Road said in Gopalpur Section of Naimnagar Sub division in Hanumakonda Town division of ... partial turnkey basis
Design, Supply, Erection, Testing and Commissioning of Integrated/Individual Automatic Mist Spray Dust Suppression System and Automatic Fire Fighting System for total P&M of CHP, Srirampur Area on turnkey basis along with 5 years AMC after guarantee period as per the Scope of work, Terms and Conditions of NIT.
Erection of 3 nos. of 150 T Steel Bunkers along with 03 nos. of Gantries for Grade mixing and Lorry Loading System and 2Nos.of 90/125KW conveyor drive head unit(CDHU)including structures each about 130mtrs with plain water Dust suppression system at ... on turnkey basis-
Extension supply to 1no. HT Cat-II ,CMD-100KVA at 33KV voltage level to avail auxiliary supply to 400KV switching Sub-station to Executive Enginner, LIC Division no. 1, TS TRANSCO, Karimnagar at Kachapur Village in Julapally Section , Dharmaram ... partial turnkey basis
Design, Construction and handing over of 480 EWS flats (each of Built-up area of 528 Sft), with (Stilt + 10) floors pattern consisting of 4 blocks with conventional or Monolithic concrete construction with any innovative technology (Shear wall ... under EPC Contract system ...
Design, Supply, Fabrication, Erection and Commissioning of 360 KLD Expandable to 720 KLD Capacity Consisting of Multiple Effect Evaporator, ATFE and Paddle Drier With Supporting Structure, Sheeting and Condensate Treatment Plant of 600 KLD Expandable ... on Turnkey Basis ...
Erection of 8.050 KM 33KV interlinking line between Giddemutharam Sub station to Ramakrishnapur Sub station in Chityal Section of Bhupalapally Division and Erection of 14.00 KM 33KV interlinking line between 132/33KV Regonda SS to 33/11KV Narsapur SS ... partial turnkey basis
Construction of 400/220/132kV GIS Sub-Station at Rayadurg (2 x 500 MVA & 2 x 160 MVA), 2 Nos 400kV Bay extension at 400/220kV Kethireddypalli SS, 400kV DC Line from 400kV SS Kethiredypally to 400kV Rayadurg SS of 43kM (approx.) and 220kV/132kV ... on Turnkey Basis
Supply,erection,testing and commissioning of (i) 132/33 KV Padmanagar Substation ii) 132 Kv DC/SC line (7km) for making LILO of 132 KV line from 220/132 KV SS Durshed to 220/132 KV SS Sirisilla (one circuit) to proposed 132/33 KV SS Padmanagar in ... on Turnkey Basis
Design, Supply, Erection, Testing and Commissioning of Integrated/Individual Automatic Mist Spray Dust Suppression System and Automatic Fire Fighting System for total P&M at GDK.1 CSP, RG-1 Area on turnkey basis along with 5 years AMC after guarantee period as per the Scope of work, Terms and Conditions of NIT
Design, engineering, manufacturing, testing before dispatch, loading, supply for destination including transportation, civil & construction works, erection, testing and commissioning of 2 Nos. Quad Feeder Bay extensions at 400/220kV Dicpally ... on Turnkey Basis.
Erection of 16.8Kms of 33KV Line and Extension of supply to 1No HT Category-II service with a CMD 630KVA at 33KV Voltage level to avail station supply to the Executive Engineer Construction 400 KV SS at Nandi Medaram(V) in Khilavanaparthy section of ... partial turnkey basis
Shifting of DTRs, HT/11 KV Lines crossing alignment of parallel canal on left side of flood flow anal of (Kaleshwaram Project Link-II additional 1.10 TMC under package-IV from Km 10.000 to Km 23.275) at Vilasagar village to the border of Asampally ... Semi turnkey basis
Providing of EWC WHB and sanitary fixture providing of modified bitumen membrane treatment to the terrace for gunman room, servant rooms, construction of dhobi ghat and other civil works in the Minister qtr no 12 at Minister residential complex raod ... ( Turnkey Basis)
Proposal for extension of supply to 1 no HT Cat-VI service connection with a CMD of 1000 KVA at 33KV voltage level to the Township Ramagundam Fertilizers and Chemicals Limited in Operation Section P.K. Ramaiah colony (now Markandeya Colony) in ... partial turnkey basis
Supply, Erection, Testing and Commissioning of (i) 220/132/33 KV Sub-station at Chandanvally (ii) 220KV Twin Moose DC line from 400KV Kethireddypally SS to 220KV Chandanvally SS (8KM) (iii) 2No.s 220KV Feeder bays at 400/220/132KV Kethireddypally SS ... on Turnkey Basis.
Supply, erection, testing and commissioning of raising height of condcutor between () Loc no 35 and 36 of 132kV siddipet to shanigaram and 132kV Ellanthakunta to chandulapur lines (0.7KM) (ii) Loc.NO.154 and 155 of 220kV siddipet to Durshed ans 220kV ... on turnkey basis ...
Construction works for i) Diversion of 400kV QMDC line from 400kV Julurupadu SS to KTPS VII at Loc.No. 38 to 43 of length 2.4kM (ii) Diversion of 400kV TMDC line from KTPS -VI to Khammam (PGCIL) at Loc. 129- 132 of length 1.5kM for crossing of BG ... on turnkey basis.
Providing of alternate 11KV Express feeder to existing HT SC NO. PDL-256 to M/s Dy. General Manager (Elet.), RFCL Ramagundam at Murmur by erection of 3.15MVA PTR and 3.0 KM 11KV line from Akenapally SS in Operation Section Anthergaon of Operation ... partial turnkey basis
Supply, erection, testing and commissioning of (i) 132KV DC line (6.1km) from existing 132/33KV SS Geesugonda to M/s Kitex Garments Limited proposed to be established at M/s Kakatiya Mega Textile Park, Shyampet (V), Geesugonda (M) in Warangal ... on turnkey basis.