Design, Supply, Installation, Testing, commissioning with Remote Monitoring System with Comprehensive Warranty, guarantee for 5 Years and Operation and Maintenance of the Complete Plant for 5 Years from Commissioning Date for the Grid Connected, ... 100% turnkey and ...
Construction, Erection, Testing and Commissioning of 100KLD effluent treatment plant with Membrane Bio Reactor (MBR) Technology with suspended growth process including cost of all associated civil, mechanical, electrical and instrumentation items ... on turnkey basis ...
Supply, Erection, Testing and Commissioning of (i) 2 Nos. 220kV Bays at proposed 220/132/33KV Chandanvally (TSIIC) SS (ii) 220KV Single Moose DC line (2.2 KM) from proposed 220/132/33KV Chandanvally (TSIIC) SS to proposed 220KV M/s. Amazon ... on Turnkey Basis
Erection of 10 KM 33 KV interlinking line between 33 KV Vemulawada feeder and 33 KV Nandikaman feeder which are emanating from 132/33 KV Mallaram SS by taking tapping from 33/11 KV Boinapally SS to Kodurupaka cross road to give supply to 33/11 KV ... partial turnkey basis
Supply, Erection, Testing and Commissioning of (i) 220KV MC/DC Line from 220/132KV Fabcity SS to proposed site of M/s. Amazon Data services India Pvt. Ltd at TSIIC industrial park Fabcity (2.5 Kms), (ii) 2 Nos. 220KV Feeder bays at 220/132KV Fabcity ... on Turnkey Basis
Retrofitting of Existing Cement Mill 1 and 2 ESP in to Pulse Jet Bag Houses PJBH as per norms of Pollution Control Board on turnkey basis in phase manner.
Setting up of a Biogas plant based on CSIR-Indian Institute Of Chemical Technology (CSIR-IICT) Anaerobic Gas Lift Reactor (AGR) Technology or any other relevant technologies for generation of Biogas to cooking fuel cum Electricity generation (To ... on Turnkey basis ...
Construction of one tower of office complex and another tower of residential building including internal water supply, sanitary installation & all development & bulk services, Horticulture works on EPC mode1 basis including comprehensive maintenance & operation of Civil, E&M and Horticulture works for 7 years after completion of original construction work for Ranga Reddy, Secunderabad, Medchal, Audit-1, Audit-II commissionerates of Central Tax at Khajaguda, Serilingampally, Hyderabad (SW: Providing services of inspection vehicle and LMV driver for the Assistant Engineer (E)-1 O/o EE&SM(E)-1, CPWD, Hyderabad
Maintenance Repair work on Agartala to Khowai NH-108B existing road from Km 19.300 to Km 32.800 at various sections from Mohanpur to Subalsingh road (NH-108B) at the risk and cost of EPC Contractor in the
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Akenepally (V) in Bellampally (M) of Bellampally Division of Mancherial Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Laxmipuram (V) in Bonakal (M) of Wyra Division of Khammam Circle under T and D/ SI Scheme on partial turnkey basis
Operation And Maintenance Of Other Machines And Plants - Assistance in preventive maintenance and repair works of Ventilation Systems and other various equipment at NUOFP (O), NUOFP(P), and EPC Block(B) facilities like NST, Incinerator, NDF & NSDF et..
Supply, erection, testing and commissioning of Lot-1:-(i) 132KV DC line (6km) from existing 132/33KV SS Chandrugonda to proposed 132/25KV Chandrugonda Railway Traction substation (CMD of 10 MVA) (ii) 2Nos. 132KV Bays extension at 132/33KV SS ... on turnkey basis.
Proposal for erection of 22Nos, M+9 Towers and dismantling of 23Nos Rail poles, 02 Nos RS Joist Poles, dismantling and restringing of 1.40KM 33KV DC line from Thulasi Bar to KUC X-Road -33KV line from 33/11KV SS Gopalpur to 33/11KV SS KUC and 33KV ... semi turnkey basis
Supply, erection, testing and commissioning of i) 2nd ckt stringing (10km) on existing 220KV Kamareddy-132KV Chippalapally line up to Loc.No.34 with 1st ckt live for solid tapping arrangements on 132KV Yellareddypet-Domakonda ii) 2nd ckt stringing ... on turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Narsingapur (V) in Chandurthy (M) of Karimnagar Town Division of Karimnagar Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Rejarla (V) in Sathupally (M) of Sathupally Division of Operation Circle Khammam under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Muthapuram (V) in Gundala (M) of Kothagudem Division of Operation Kothagudem Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Sayanapally (V) in Gundala (M) of Kothagudem Division of Operation Circle Kothagudem under T and D/ SI Scheme on partial turnkey basis.
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Kachanapally (V) in Gundala (M) of Kothagudem Division of Operation Circle Kothagudem under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Gourapur (V) in Kodimial (M) of Jagitial Division of Operation Jagitial Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Maddulapally (V) in Kamepally (M) of Khammam Division of Operation Khammam Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Lachan (V) in Madnoor (M) of Banswada Division of Operation Circle Kamareddy under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Papaiahpally (V) in Thangalapally (M) of Siricilla Division of Operation Circle Siricilla under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Kuchlapur (V) in Thallamadugu (M) of Adilabad Division of Operation Circle Adilabad under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Kupti (V) in Neredigonda (M) of Adilabad Division of Operation Circle Adilabad under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Bonthupally (V) in Veenavanka (M) of Huzurabad Division of Operation Circle Karimnagar under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Chalvai (V) in Govindaraopet (M) of Mulugu Division of Operation Circle Bhupalpally under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Burugupally (V) in Dharmapuri (M) of Jagitial Division of Operation Circle Jagitial under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Venugumatla (V) in Gollapally (M) of Jagitial Division of Operation Circle Jagitial under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Jangalapally (V) in Mulugu (M) of Mulugu Division of Operation Circle Mulugu under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Hasanparthy (V) in Hasanparthy (M) of Hanumakonda Rural Division of Operation Circle Hanumakonda under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Ankushapur (V) in Kagaznagar (M) of Sirpur Kagaznagar Division of Operation Circle Asifabad under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Gudlabori (V) in Kowtala (M) of Sirpur Kagaznagar Division of Operation Circle Asifabad under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Nallabelly (V) in Wardhannapet (M) of Warangal Rural Division of Operation Circle Warangal under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Sofinagar (V) in Nirmal (U) (M) of Nirmal Division of Operation Circle Nirmal under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Mahagaon (V) in Bhainsa Rural (M) of Bhainsa Division of Operation Nirmal Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Jaggaram (V) in Dammapeta (M) of Palvoncha Division of Operation Bhadradri Kothagudem Circle under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at Reddypuram (V) in Hasanparthy (M) of Hanumakonda Rural Division of Operation Circle Hanumakonda under T and D/ SI Scheme on partial turnkey basis
(i). Erection of 3.30 KM 33KV interlinking line with erection of 3no. M+6 GI Towers between 33KV Bhupalapally Town tapping to 33/11KV SS Jangeedu of Bhupalapally Town Section in Bhupalapally Division, (ii).Erection of 10.10 KM 33KV interlinking line ... partial turnkey basis.
Maintenance and Repair of Balance Length 6450 Km from Ch. 78 200 to Ch. 84 650) of NH44A vaghmun to Simlung section at Risk and Cost of the EPC Contractor on item rate basis work order basis in F.Y 2024-25 (2nd Call)
R R work on NH 208 from km 63.700 to km 75.700 Total Length 12.000 Km at various sections of Bamanchara to Srirampur at risk and cost of EPC Contractor in Tripura in FY 2025 26 on item rate basis work order basis
Proposal for shifting of lines and DTR structures due to widening and strengthening of Kothapally to Husnabad road in operation section Indurthy of Nustulapur sub-division in karimnagar rural division of operation circle Karimnagar on partial turnkey basis
Erection of 33/11KV Substation with connected 33KV and 11KV lines at By pass Road RN Palem (V) in RN Palem (M) of Khammam Division of Operation Circle Khammam under T and D/ SI Scheme on partial turnkey basis
Erection of 33/11KV Indoor Substation in the premises of Old Bus Stand in Khammam Town-V Section of Khammam Urban (M) of Khammam Division of Operation Circle Khammam under T and D/ SI Scheme on partial turnkey basis.
Proposal for extension of supply with load of 5.4MW by erection of 3.27KM of 33KV line from 132/33KV Burugupally SS and tapping to the existing 33KV Line along with erection of 35Nos M 6 Towers in the line that is passing over the villages for making ... partial turnkey basis
Proposal for extension of supply to HT Cat-II(A) load with a CMD of 2500 KVA at 33 KV Voltage level to Super specialty Hospital at Central Prison Land in Rangampet of Operation section Pochammaidhan of Operation Division Warangal in Warangal Circle ... partial turnkey basis
ELECTRICAL LAB EQUIPMENT FOR YADADRI TPS
Supply, Erection, Testing and Commissioning of following works in Ranga Reddy (erstwhile) District on Turnkey basis. Lot-I:- 220/33kV Substation at M/s.CPRI premises with 220/33KV, 2x100MVA PTRs. Lot-II:- i) 132kV 2nd circuit stringing on existing 132kV DC/SC line from 132kV SS Amangal to 132kV SS Keshampet (27.63 Km), ii) Erection of 1 No. 132kV Bay at 132/33kV Keshampet SS and iii) Erection of 1 No. 132kV Bay at 132/33kV Amangal SS. Lot-III:- i) 132kV 2nd circuit stringing on the existing132kV DC/SC line from 220/132/33kV SS Chegur to 132/33KV SS Kothur (7Km) (ii) Erection of 1 No. 132kV Bay at 132kV Kothur SS.
Supply, erection, testing and commissioning of (i)Diversion of existing 220KV Gajwel-Medchal line between loc No.88 and Loc.no.90 for the proposed Railway line crossing in Siddipet district.(2.5KM) (ii)Diversion of existing 220KV Gajwel-Medchal line ... on turnkey basis