Loading…
Loading…
2,890 results • Best match
Development of Internal Infrastructure for Integrated Manufacturing and Logistics Cluster at Firozabad and Etawah with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five Years on EPC Mode
EXPRESSION OF INTEREST cum REQUEST FOR PROPOSAL FOR PROJECT MONITORING CONSULTANT PMC WORK FOR CONSTRUCTION OF 37 NOS COURT ROOMS FOR INTEGRATED COURT COMPLEX AT AURAIYA UP INDIA ON EPC MODE
Construction of 02 lane R.O.B. on Sampar No. 186 Special located at Km. 1084 15-17 of Dilkusha-Malhaur rail section of Northern Railway in District Lucknow U.P. on EPC MODE.
Design Engineering and Procurement of Construction of Integrated Court Complex in different districts of UP India on EPC mode i Shamli 23 Courts ii Auraiya 37 Courts iii Hathras 44 Courts
Design and Construction of 02 lane ROB at LC 136 SPL/3E On Bahraich Tulsipur Marg (NH-730) Near Jharkhandi in Tulsipur Assembly Constituency of District Balrampur, U.P. on EPC Mode.
EXPRESSION OF INTEREST cum REQUEST FOR PROPOSAL FOR PROJECT MONITORING CONSULTANT PMC WORK FOR CONSTRUCTION OF RESIDENTIAL AND NON RESIDENTIAL BUILDINGS OF POLICE LINE AT AURAIYA ON EPC MODE 2nd Call
Stage strengthening from km. 0.000 to km. 43.750 Mohanganj to Lalgopalganj section and km. 52.200 to km. 96.600 Muratganj to Mahewaghat section of NH-731A in Uttar Pradesh on EPC mode
Design Engineering Procurement for Construction of 30 Nos Type A and 170 Nos Type B Residences in the Police Line of Police Commissionerate Gautambudh Nagar Uttar Pradesh INDIA on EPC Mode
PMC work for Construction of Department of Pediatrics Faculty Housing Category 4 and 5 Staff Housing Category 2 and Nursing Hostel in SN Medical College at district Agra on EPC mode
RFP for Development of Chaudhary Charan Singh Seed Park at Atari, Malihabad Lucknow with Concurrent Period of Five Years for Defect Liability Period DLP and Operation and Maintenance on EPC Mode
Design and Construction of Bridge, Approach Road and Protection work over River Kiwani in Village Belva Basahiya of Development Block Sakran of Assembly Constituency Biswan of District Sitapur on EPC Mode.
Design Engineering Procurement for Construction of Expansion Plan Phase I of Lady Loyal Womens Hospital Campus of SN Medical College Agra at district AGRA UP INDIA on EPC Mode 4th Calling
Work of stage strengthening of existing road from Km. 79.350 to Km. 107.000 (excluding Km. 99.00 to Km.104.00) of NH-731K in the State of Uttar Pradesh under EPC mode
Construction of two lane with paved shoulder from existing Km. 0.000 to Km. 55.610 (Des. Ch. 0.00 to 54.048) of NH-124D on EPC mode in the state of Uttar Pradesh.
Supervision Consultant services during OnM phase for 4lane with paved shoulder config of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in Uttar Pradesh on EPC mode.
Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd)
Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode
Develop. of 6lane GF PKG-IIA starts from Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode (2ND CALL)
O and M and other Road Safety Works on Muzaffarnagar Haridwar Sec of NH334 from Km 130.500 to Km 206.220 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Development of 6 lane GF(PKG IIB)starts from Design Start from Ch.32.090 to Ch.51.200 around Kanpur city(Length19.110 kms)in the state of Uttar Pradesh on EPC mode
Periodical Renewal (PR) work from km 130.400 to km 135.000 and km 154.000 to km 168.000 of NH 28B (New NH -727) on EPC mode in the State of Uttar Pradesh.
Supervision by Authority Engineer of Design Engineering Procurement for Construction of Buildings of State Disaster Management Authority at district Lucknow UP INDIA on EPC basis
Construction of 4 lane Flyover with 2 loops and 2 ramps at Shaheed Path Intersection, RHS bank of Gomti River, Lucknow (UP) on EPC Basis
Selection of Contractor for Integrated Infrastructure Development Works, in Atal Puram Township at Gwalior Road Agra in the State of Uttar Pradesh on EPC basis
as per NIT and tender document
Augmentation of FGK Internal Electrical Power Distribution System on Turn-key Basis
Construction and Development of Company Garden in Saharanpur with 5 years of Operation and Maintenance Period including one-year Defect Liability Period on EPC (Turn-Key) basis under Smart City Mission
Work of Periodic Renewal from km. 28.580 to 29.639, Km. 30.029 to km. 30.060 and km. 30.659 to km. 44.843 of NH-334DD on EPC mode in the State of Uttar Pradesh
Authority Engineer/PMC supervision for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km31.260 on NH 730 in the State of Uttar Pradesh Under EPC Mode
PMC work for Construction of One Block of Type 3 54 Residences and Three Blocks of Type 2 216 Residences for Government Colony Badshahnagar at district Lucknow UP India on EPC mode
Development of Internal Infrastructure for Uttar Pradesh Defence Industrial Corridor, Aligarh Node, Phase II with Defect Liability Period and Operation and Maintenance for Concurrent Period of Five 05 Years on EPC Mode.
RFP for the work of Construction of Two Lane with paved shoulder highway from Design Ch.0.000 to Ch.49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.
Periodical Renewal from Km. 77.000 to 78.460, 78.645 to 84.600, 85.290 to 85.750, 86.950 to 87.210 and 87.360 to 105.000 of NH-135C on EPC Mode in the State of Uttar Pradesh.
Work of construction of a minor bridge over Kaimua Nala in Km 24 on newly declared NH-731 K on Shahjahanpur- Bisalpur road in the state of Uttar Pradesh under EPC mode
Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh
Constr. of Additional Structures of 12 Nos Grade Separator VUP LVUP CUP on Rajasthan Border Fatehpur Salasar Sec of NH-52 and NH-58 on EPC Mode in the State of Rajasthan
Construction of Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai river bridge of Raebareli Prayagraj section of NH30 (Old NH24B) under Bharatmala Pariyojna in Uttar Pradesh on EPC mode
Design Engineering and Procurement of Construction of 500 Bedded 08 storey multistorey building and patient utility complex for expansion of trauma center in King Georges Medical University Lucknow UP on EPC mode
RFP for Design and Construction of Vehicular Underpass VUP at Km. 21.150 near Angira College on Jhansi Khajuraho Section Pkg 1 of NH 39 in the State of MP on EPC Mode.
Construction of 4 lane Connector from Delhi Meerut Expressway (Km. 50.000 of Package IV) to Km. 8.520 of NH 235 in the State of Uttar Pradesh on EPC Mode (Length 14.600 Km).
Construction of VUP at Km 51.300 (Baghola) of Delhi-Agra Section from Km 20.500 to 200.000 of National Highway No.2 (New NH-19) in the state of Haryana on EPC mode.
Design and Construction of Bridge, Approach Road and Protection work over River Gomti At Kankar Ghat on Ameer Nagar - Barbar Road in Assembly Constituency Mohammadi of District Lakhimpur Kheri on EPC Mode.
Widening and Strengthening from Km. 0.000 to Km. 15.089 (Purkaji-Laksar-Haridwar Road) of NH-334A to two lane with paved shoulder configuration in the State of Uttar Pradesh on EPC mode
PMC work for Construction of MBBS and Nursing Boys and Girls Hostel in Dr Ram Manohar Lohiya Medical Sciences Institute at Gomti Nagar Vistar in Lucknow U P India on EPC Mode
Design Engineering Procurement for Construction of Residential Buildings of Police Training School to Double its Capacity at Sitapur Uttar Pradesh INDIA on EPC Basis 2nd Calling
Construction of GST Building (2 basement G7 floor ) Composite structure on EPC basis at kamla Nehru Nagar (Near Hapur Chungi) Ghaziabad (U.P) (SH:- Misc Electrical Works)
Construction of 02 Lane Bridge Over River Sharda Between Akbarpur Raipur Village on Benti Chandibhanpur ambour Road along with Approach Road and Protection work in District Lakhimpur Kheri Uttar Pradesh on EPC MODE.
EXPRESSION OF INTEREST cum REQUEST FOR PROPOSAL FOR PROJECT MONITORING CONSULTANT PMC WORK FOR CONSTRUCTION OF TRANSIT HOSTEL 4 TOWERS OF S PLUS 12 IN POLICE LINE PRAYAGRAJ UP INDIA ON EPC MODE
PMC work for Construction of New District Jail Kanpur Nagar of 5000 Prisons Capacity Construction For 3000 Prisons Capacity and Future Expansion For 2000 Prisons Capacity Kanpur Nagar UP India on EPC Mode
Design and Construction of Bridge, Approach Road and Protection work over Bhaghar Lake of Sharda River in Ramuapur Village of Development block Behta in Assembly Constituency Hargaon of District Sitapur on EPC Mode.