Loading…
Loading…
2,891 results • Best match
RFP for the work of Construction of a Minor Bridge over River Chadahi at Ch,61.600 of Hariya - Bhabnan Mankapur- Darjikuwa Marg (NH 727G) District Gonda under EPC Mode in the state of Uttar Pradesh.
Construction of Six Lane VUP (Single box 12x5.5 m with approach) at Sachendi (Ch. 454.460) on Etawah-Chakeri (Kanpur) Section of NH-19 (Old NH-2) in the State of Uttar Pradesh on EPC Mode
CS for AE of Const. of a 4L Western bypass for Jaunpur city connect NH731 at exist. Ch.Km.223.200 to NH135A Eastern Bypass at Ch.Km. 107.780 TL 12.205 km in Uttar Pradesh on EPC mode
Design Engineering and Procurement of Construction of Construction of Residential and Non Residential Buildings of UP Special Security Force Headquarter and 1st Battalion of Special Security Force at District Lucknow Uttar Pradesh on EPC mode
Design Engineering and Procurement for Construction Work of 500 Bedded Multi Super Specialty Hospital by Demolishing 11 Unusable Dilapidated Buildings in SSPG Divisional District Hospital Varanasi Associated with NHM at Varanasi India on EPC mode
Construction of a bridge, approach roads, additional approach roads, and protection works over the Garra River near Village Chauhanapur on the Chauhanapur-Shahabad road, within the Dadraul Assembly Constituency of Shahjahanpur District on EPC Mode.
Design and Construction of Bridge, Approach Road and Protection work over River Sarayan on Lalkurti - Maheshpur Road Near Maheshpur - Chelwara Village in Development Block Khairabad of Assembly Constituency Sadar of District Sitapur on EPC Mode.
Development of Botanical Garden of Indian Republic (BGIR) at Sector-38, Noida, Uttar Pradesh on EPC Mode (SH: Providing Services of Data Entry Operator and MTS in Division and Sub Division office under CED-IV).
CONSTRUCTION OF BOYS HOSTEL AT MNNIT ALLAHABAD ON EPC BASIS (SH REPAIR / RE-FIXING OF STRUCTURAL GLAZING WORK AND ALUMINIUM WINDOW SHUTTER OF BOYS HOSTEL) Subwork/Packages: REPAIR OF STRUCTURAL GLAZING WORK
Construction of cement concrete pavements from Km. 224.830 to Km. 229.630 of NH-330 (4.8 km) in the state of Uttar Pradesh under EPC Mode. (Job No. NH(O)330/UP/2021-22/ 595,dated-03.08.2021)
Construction of 02 lane railway portion composite girder 37.28 m center to center of expansion joint at LC No 123A at near Devipatan Mandir at Tulsipur Gonda Tulsipur rail section in District Balrampur on EPC Mode
Consultancy services for Authoritys Engineer for Supervision of Work of Widening to four lane with paved shoulder from design km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh.
Construction of Academic Block of College of Nursing and College of Paramedical Sciences in New Premises of Dr Ram Manohar Lohia Institute of Medical Sciences at Sector7 Gomti Nagar Extension Lucknow UP India on EPC Mode
Proposed Construction of Various Building in Pondicherry University Campus like A) Department of Community College, B) Department of Food science, C) department of Performing Arts and D) Proposed Students Amenities cum Internet centre on EPC Mode
Widening of existing four lane to six lane road from chainage 3.000 to 7.469 of NH-235 (New NH-334) Meerut (Hapur Adda to Bijli Bamba chauraha) in the State of Uttar Pradesh under EPC mode.
Consultancy services for Authoritys Engineer for Supervision of Work of Widening to two Lane with paved shoulder from Design Km 0.000 to Km 49.200 of NH-731B on EPC Mode in the State of Uttar Pradesh.
Design and Built,( On EPC Mode) Additional Multistoried Parking cum Community Facilities Block (Finished) having Basement plus Stilt plus 6 Floors plus Mumties and Lift Machine rooms plus water storage tank plus parapet walls etc complete
Design and Construction of Bow String Steel Girder Railway Bridge Portion at LC No 108A on Barabanki Akbarpur railway route in Distt Ayodhya including work of foundation and sub structure of Rly Portion on EPC Mode
Improvement and upgradation to two lane with paved shoulder configuration from existing km.55.00tokm.90.000(Design length 34.760)of NH-227A(Near Chhapia Village to near Sikriganj)in the state of UP on (EPC)mode Contract.
Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH 24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
Const. of 03 nos. of VUPs at Ayodhya Bypass from km 135.120 to km 137.060 L1.940 km of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode Deposit work basis in Uttar Pradesh.
CS for AE of Const. of 4L South East Bypass for Azamgarh City connecting NH28 at exist Ch. Km 218.800 to Purvanchal Expressway at exist Ch. Km 247.850 TL 14.905 Km in UP on EPC Mode
Consultancy services for Authoritys Engineer for Construction of 4-lane with paved shoulder highway from km 112.950 to km 147.200 of NH-731A along with Chitrakoot Bypass on EPC Mode in the State of Uttar Pradesh.
Construction of 4 lane Greenfield North East side Gorakhpur bypass (26.616 kms) starting from NH29E (Km 83.308) and end at NH28 (Km 285.100) under NHDP Phase-7 in Uttar Pradesh under Bharatmala pariyojana on EPC mode
Implementation of Road Safety Works on 6 Lane Agra Etawah Bypass section of NH-2 from Km. 215.000 to Km. 230.000 and from Km 280.000 to 295.000 as per Crash Vulnerability Audit Report on EPC Mode
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh
Construction of 02 Lane Rail Over Bridge at LC No 47 Excluding Railway Portion at Lucknow Jafrabad Rail Section of NR on Akbarpur Kadipur Chanda Patti Delhupur SH-128 Road in Distt Sultanpur om EPC Mode.
Construction of Balrampur bypass with two lane flexible pavement configuration from km 223.000 of NH-330 to km 328.300 of NH-730, design length of 20.515 km under EPC mode in the State of Uttar Pradesh
Periodic renewal work from Km. 0.000 to 68.300 of NH-931 (Pratapgarh -Amethi-Musafirkhana Road) under EPC mode in the State of Uttar Pradesh (Excluding Km. 7, 14, 17, 18, 42, 50, 51, 52 and 53)
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh
Construction of 6 Lane SVUP at Km.124.000 with service Road and Bus Shelter in Village Gulara on Jhansi- Orai Section of NH-27 (Old NH-25) in the State of Uttar Pradesh on EPC Mode.
Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP
INCREASING CAPACITY OF 33/11KV SUBSTATION HARHUWA FROM DISTT. VARANASI ON SEMI TURN KEY BASIS
Release of Connections Jal Jeven Mission Karyakaram on turn key basis under EDD-2 Nanpara
INCREASING CAPACITY OF 33/11 KV SUBSTATION CHHAHI DIST.-VARANASI ON SEMI TURN-KEY BASIS.
INCREASING CAPACITY OF 33/11 KV SUBSTATION CHOLAPUR DIST.-VARANASI ON SEMI TURN-KEY BASIS.
Shifting work against Deposit Work under EDD-2, 3 Nanpara Kaiserganj on Turn Key Basis
CONSTRUCTION OF ALL WORK AT TURN KEY BASIS of BAHIRABARI WS BLOK SEWARAHI DIST KUSHINAGAR
CONSTRUCTION OF ALL WORK AT TURN KEY BASIS of MAIRAWA WS BLOCK SEWARAHI DIST KUSHINAGAR
Release of Connections Jal Jeven Mission Karyakaram on turn key basis under EDD-3 Kaiserganj
CONSTRUCTION OF ALL WORK AT TURN KEY BASIS of SIKATIA WS BLOCK DUDAHI DIST KUSHINAGAR
Work for Erection of 11 Kv Lines on semi turn key basisi under EDD Fatehpur
Construction of Rigid Pavement Parking Footpath Road Gates Rest area Toilets for Drivers including External Development Drainage Sewage and other Basic Development Services at ICP Sunauli (Design Drawing and Construction) on EPC Basis
RFP for the work of Rehabilitation and up-gradation from km. 0.000 to km.40.390 of NH-730S (Maharajganj , Nichloul , Thuthibari) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Consultancy Services for Authoritys Engineer for superv.of Impro.and Upgrada.from Km.73.300 Km (Bikapur)to Km.140.960 (Patranga)(Design length 67.660 Km (84 Kosi Parikrama Marg)) to 2Lane with P.S.configu. under EPC mode in the State of U.P.
Design and Construction of 02 lane ROB in lieu of LC 37 C at Km 54/15-16 of RAC-SPC Rail Section of Northern Railway on Chandra - Bargavan - Kulhaghat Road In District Sitapur on EPC Mode.
Selection of AUTHORITYS Engineer (AE) PMC Services for Supervision of Construction of Mariahu Bypass with four lane paved shoulder configuration (Km. 53.540 to Km.59.200) of NH-135A on EPC mode in the state of Uttar Pradesh.
RFP for the work of Widening and Strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configuration under EPC mode in the State of Uttar Pradesh.
Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing km. 90.000 to km.130.000 (Design length 39.150) of NH-227A (Sikriganj to Barhalganj) in the state of Uttar Pradesh on (EPC) mode Contract.