Loading…
Loading…
3,373 results • Best match
WS Scheme at Kachnaav GP
WS Scheme at Tendua GP
WS Scheme at Khairahana GP
LINE SHIFTING WORK
Erection of Arial Branch Conducor and Interposing pole on the Semi Turnkey basis on the Semi Turnkey basisunder EDC, Balrampur
Custom Bid for Services - Installation of New 250 KVA Distribution Transformers in Business Plan 2026-27 on Semi Turn-key Basis under the area of Electricity Distribution Circle, Etawah Similar Category Operation And Maintenance Of Substation Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Work for 150 fit boring, installation of 01 No submersible 1 HP, installation of 1000 leter capacity water tank with plumbring work to ensure water supply on turn-key basis at S/S Bajrang Nagar, Kasalee and Chhatideeh (Chauree) in the area of SDO-I K
work for replacement of 33KV and 11 KV VCBs installed at various 33/11 kv Sub-stations against Business Plan 2024-25 for quality power supply in Aligarh City on Semi Turn-key Basis under the area EUDC, Aligarh
For the work of 33 KV and 11 kV line strengthening and 11 KV new line construction work on semi turn-key basis in the Business Plan 2024-25 (Part-2) scheme under the area of EDD-2 Agra.
Under Additional Business Plan 2023-24 (Rs. 10 crores) in EDD-Ird, Chandauli, the work of cutting the load of 11 KV Industrial-1 feeder of Jeevnathpur power sub-station and 11 KV Shivam feeder (Semi Turn-Key Basis)
The work for Reconductoring of 33 KV Line of S/S Pannalal Park from Dog to Panther in the area of UEDD-Varunapar, Varanasi Under EE, UECD-II, Varanasi in Business Plan 2025-26 on Semi Turn Key Basis
The work for electrification of New Mini Tubwell connection of 10 HP with 11 KV S/C cable at Kazi Sadullahapur, Varanasi in the area of UEDD-VIII, Varanasi Under deposit work 2020-21 on Semi Turn-Key Basis
For the work issuing connection of various capacity in LMV-7 (Site-Pahadi kalan, Sainya, Barigavan Khurd n Ujrai Akola) under Jal jeeval mission on Semi Turn Key Basis in full deposit scheme under area of EDD-Kheragarh, Agra.
For the work of 33 KV and 11 kV line strengthening and 11 KV new line construction work on semi turn-key basis in the Business Plan 2024-25 (Part-2) scheme under the area of EDD-1 Agra.
Work of overhauling and capacity enhancement of power transformers, as well as line construction and strengthening, within the Industrial Area (Phase-1) under the jurisdiction of EDD- Chandauli pursuant to the BP 2026-27 (on Semi Turn-key basis).
Construction of New 11 KV Line From New Constructed 33/11 KV S/S Shriduttganj (Vill Jigna) to Vill Godahna Near Vill Gaur against Business Plan 2017-18 on the Semi Turn-key basic under Electricity Distribution Circle, Balrampur
Supply and Installation of Single Phase Two Wire Static Electronic Energy Meter (10-60Amp.) DLMS type with Box at the premises of APL Category consumers on turn-key basis in different distribution divisions of Faizabad Zone of MVVNL, Lucknow
line bifurcation on semi turnkey under EDD-IV
Campus Wide Networking TurnKey Project for Military Hospital
feeder bifurcation on semi turnkey under EDD-I
TF Incresing and sami turnkey under EDD-IV
TF Incresing on sami turnkey under EDD-II
TURNKEY CONTRACT FOR SOLAR HIGH MAST AT VARIOUS
Work of Line Shifting on Semi Turnkey Basis
Construction of 100 Type-III multi-storey quarters at Bauliya Railway Colony And 05 Nos of V.I.P Suits at Ramgarh Tal Railway Colony on EPC Mode at Gorakhpur, U.P.
EPC Package for VRFB storage at NETRAAs per Bid Doc. No. CS-0011-004L-9
Carrying out various electric works on Turn key Basis for shifting of 11 KV, LT line, Transformer with other associated infrastructure due to Road Widening Between Chatikara Radhakund (Under Full Deposit scheme) in the area of EE, EUDD II Mathura
The Work for Replacement of Damaged cable of 11 KV Police Feeder, 11 KV Feeder Ganeshpur, 11 KV Feeder Bhavanipur and 11 KV Feeder Laxmanpur Under EE, UECD-II, Varanasi in Business Plan-2024-25 on semi turn key basis
Carrying out various electric works on Semi Turn key Basis for protection and strengthening of 33 KV line and other infrastructure at different places in the area of EE, EUDD-I, II, III, Mathura under the jurisdiction of SE, EUDC, Mathura
Under the Full Deposit Scheme in EDD-IInd, Mughalsarai, the work of shifting HT and LT lines for the construction of Rail Flyover between Chief General Manager DFCCIL/DDU P.D.D. U. Nagar and Vyasnagar Railway Station.(On semi turn-key basis)
Supply of material for Shifting of 33KV, 11KV and LT lines and conversion of overhead HT/LT into underground lines passing in the area of under construction of Railway line from Etah to Jawahar Thermal Power Project Malawan on turn key
Carrying out various electric works of load enhancement and Releasing new connection for sewage pump at various places under Yamuna pollution control unit, Jal Nigam on Turn-Key Basis (Full Deposit scheme) in the area of EE, EUDD III Mathura
For the work of Increasing Capacity of Different Type Distribution TFs, Installation of New Distribution TFs and making of 11 KV/LT lines nd other associates works in Business Plan 2024-25 on Semi Turn Key Basis under EDC-1 Agra
Add. BP 2023-24 in EDD-I, Chandauli work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line. on semi turn-key basis.
The Work for Bifuracation of 11 KV Mawiya Feeder From 33/11 KV S/s Goithaha and Hukulganj Feeder From 33/11 KV S/s Sankul Under EE, UECD-II, Varanasi in Business Plan-2024-25 on semi turn key basis
Add. BP 2023-24 in EDD-III, Sakaldiha work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line on semi turn-key basis
Establishment of additional distribution transformer in the works to be done under the work plan of Rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in EDD-I, Chandauli. on semi turn-key basis
Construction of 11 KV underground and overhead line, LT ABC and DT work for RFO-2 Allahabad, Bamrauli 4th line from track no. 831/12 to 833/19, Bamrauli, against Semi Turn Key Basis of Deposit work Under EUDD-Bamrauli, Prayagraj.
The Work for Replacement of Damage condutcor by Dog cond., Replacement of Damage condutcor by ABC, laying of Additional ABC and Trolly Amounted T/F 630 KVA under EE, UECD-II, Varanasi in Business Plan-2019-20 on Turn-Key Basis
For the Work of 11 KV Line Construction/Strengthing, Increasing Capacity of Dist. T/F, Installation of New T/Fs and other associated works Head on Buisness Plan 2023-24 GREESHM RITU on Semi Turn Key Basis under EDC-1 Agra.
Work for Line Shifting and other associated work under Semi Turn Key Basis during road wending of Bullet Chauraha to Circiut House Fatehpur (33 KV, 11 KV and LT Lines, transformers and other associated work) under jurisdiction of EDD-I Fatehpur
DESIGN, DETAILED ENGINEERING, MANUFACTURING, SUPPLY OF 132 KV 630SQMM SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES CABLE LAYING 132 KV SOLAR BAY ON TURN-KEY BASIS AT 400 KV GIS S/S RASARA UNDER ETD, BALLIA
The work of installation of Additional converter and capacity enhancement is among the work plan of Rs. 20.00 cr. allocated for the work of system strengthening under the Additional BP 2023-24 in EDD-II, Mughalsarai. on Semi-Turn-Key Basis
supply and fixing of various spare parts for 630, 400, 250 KVA Transformer on Turn-key basis for the purpose to Reinforcement of infrastructure at various place in the area of EUDD II, Mathura under the jurisdiction of SE, EUDC, Mathura
Newly created expanded municipal bodies for fixed hours, Sujabad Nagar Panchayat under Deposit Scheme in Sujabad under EDD-IInd, Mgs. area 33-11 Installation work of 630 KVA Mobile Trolley Transformer at 11KV power sub-station. On full turn-key basis
The work for L.T./H.T. Connection of M/S The Akashay Patra Foundation C/o Sri Rahul Kuamr Jha Arazi No 64/1 L.T Collage Campus Ordali Bazar Varanasi in the Area of UEDD-V, Varanasi on Turn-Key Basis
Work of supplying materials related to protection of 33 11kV sub-stations under the work plan of Rs. 07.50 crore allocated for the work of system strengthening under Additional BP 2023-24 in ETD-Chandauli. (on semi turn-key basis)
Work for Line Shifting of Gajeepur to Vijayipur Road Fatehpur (33 KV, 11 KV and LT Lines, transformers and other associated work) and its energization under Semi Turn Key Basis during road wending under jurisdiction of EDD-III, Khaga, Fatehpur
The Work for construction of 33 KV Independent Feeder D/C from 132/33 KV S/S cholapur to 33/11 Udaipur and Goithaha under the area of UEDD-VI Varanasi on Semi Turn-Key Basis in System Strengthening Scheme
Work of replacement of dilapidated AB Cable at various place and errection of extra LT circuit to maintain load of various capacity T/F on semi turn-key basis under A.B.P. 2024-25 in the area of EDD-IInd, Mughalsarai.