Loading…
Loading…
3,377 results • Best match
Work of replacement of dilapidated AB Cable at various place and errection of extra LT circuit to maintain load of various capacity T/F on semi turn-key basis under A.B.P. 2024-25 in the area of EDD-IInd, Mughalsarai.
HT LT line, repair and replacement of dilapidated places in Sujabad Nagar Panchayat under Jama Yojana in Sujabad under EDD-IInd, Mughalsarai area to provide fixed hours power supply in the newly created extended municipal bodies. On full turn-key.
Carrying out various electric works on Turn key basis to release new connection of 2500 KVA load for Electric Bus charging station (Under Full Deposit scheme) in the area of EE, EUDD II Mathura in the jurisdiction of SE, EUDC, Mathura.
Construction of New 33 kV U/G Line from Primary Substation 132/33 kV Krishna Nagar, for releasing New Connection of 5.5 MVA to 20 MLD Capacity Common Effluent Treatment Plant (CETP), under EUDD-Jajmau, Kesco, Kanpur (Turn-Key Basis)
Shifting of 11 KV lines, T/f and its Associates works at old G.T. Road Km 180.000 to 161.800 (Puramufti to SPM IIT) in District Kaushambi under EUDC-II, Alld. on Semi Turn-Key basis under full deposit year 2018-19.
Construction of 11 KV Overhead Line and its associated work to release 800KVA permanent electricity connection on single point for the new Airport Building at Bamrauli under EUDC II, Alld, on Turn-Key Basis under full deposit year-2018-19.
Shifting of 33 KV feeder Talanagri and 33 KV line of Mankameshwar feeding from 132/33/11 KV S/S Boner due to extention of Air strip, Dhanipur under deposit scheme under jurisdiction of EDD-III, Aligarh. (On turn key basis)
Construction of New 11 KV Line From New Constructed 33/11 KV S/S Shriduttganj (Vill Jigna) to Near Vill Kandhbhari Tiraha Shriduttganj Bazar against Business Plan 2017-18 on the Semi Turn-key basic under Electricity Distribution Circle, Balrampur
11 KV LINE SHIFTING WORK ON TURN KEY BASIS.
33 KV LINE SHIFTING WORK ON TURN KEY BASIS.
construction of 132kV Transmission line on Turn Key basis
INSTALLATION OF BUSBOX ON TURNKEY BASIS IN THE AREA OF EUDC, ALIGARH
Development of Agra Lucknow Expressway to Ganga Expressway Via Farrukhabad Link Expressway Package- II in the state of Uttar Pradesh on EPC basis.
Construction and Development of Infrastructural facilities in the main campus of National Institute of Technology, Uttarakhand at Sumari, Pauri Gharwal on EPC basis
Redevelopment of Carriageway, Footpath, Vending Zone, Covering ROW within ABD area of Aligarh Smart City (CW-1, CW-5, CW-6, CW-7, CW-21) on EPC mode (Package-4)
EPC Package of 140TR Solar Thermal Thermal Energy Storage based Space Conditioning System (STnTES-SCS) for NTPC Dadri Hospital
Blackspot Rectification -Long Term
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
line bifurcation on semi turnkey under EDD-I/III
LINE SHIFTING WORK UNDER EDD-II MAHOBA(TURNKEY BASIS)
regrouping of work on semi turnkey under EDD-IV
Establishment of Additional T/F and Electrification Semi turnkey
Turnkey Based BID for Equipment Furniture and Saaj Sajja
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
Construction of 132KV S/S Bilochpura on turnkey basis
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
Segregation of Agriculture Feeder on Turnkey Basis Under RDSS
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
NAMAMI GANGE JAL JEEVAN MISSION WORK (SEMI TURNKEY BASED)
Linear Accelerator (Linac) with Ring Gantry and Turnkey Works
Supply and Installation of Air Conditioner on Turnkey basis
Business Plan 2024-25 work on Semi-Turn Key Basis.
Work of feeder bifercation of 11KV Industrial-2 and Ramnagar-2 feeder and reconductoring of 11KV Industrial-1, patnva and jivnathpur feeder and erection of new line for interconnected system of 11KV feeders on semi turn-key basis under A.B.P. 2024-25
Carrying out various electric works to Release new connection for each tubewell at various places of Nagar Nigam, Mathura Vrindavan on Turn Key Basis (Full Deposit Work) in the area of EE, EUDD III Mathura in the jurisdiction of SE, EUDC, Mathura
CONSTRUCTION OF 11 KV LINE REQUIRED FOR LOAD SHIFTING FROM 11 KV SAKALDIHA RURAL 2 FEEDER FROM 33/11 KV S/S SAKALDIHA RURAL TO 11 KV SADALPUR FEEDER, 33/11 KV S/S BANULI DISTT. CHANDAULI ON SEMI TURN-KEY BASIS
The Work For Construction of 11 KV O/H and U/G line to bifurcate of 11 KV, Shivpur feeder in the area of UEDD-V, Varanasi Under EE, UECD-II, Varanasi on Semi Turn-Key Basis in Grismkalin Business Plan-2022-23
For the work of Installation of 33 KV RMU and new distribution transformers, protection related work on distribution T/Fs on semi turn-key basis in the Business Plan 2024-25 (Part-2) scheme under the area of EDD-1 Sikandra, Agra
Carrying out various electric works to Release new connection for each tubewell at various places of Nagar Nigam, Mathura Vrindavan on Turn Key Basis (Full Deposit Work) in the area of EE, EUDD III Mathura in the jurisdiction of SE, EUDC, Mathura.
The work plan of Rs. 20.00 cr. allocated for the system strengthening work under Additional BP 2023-24 in EDD-I, Chandauli, the work of replacing the dilapidated AB cable dilapidated wire installed on the LT line. on semi turn-key basis
Under the additional BP 2023-24 in EDD-I, Chandauli, under the work plan of Rs.20.00 crore allocated for system strengthening work, 11KV line construction work strengthening and LT line dilapidated AB cable/wire will be done. on semi turn-key basis
SHIFTING OF 33 KV LINE DUE TO CROSSING OVER THE FIELD AT SHEKHPUR OF SRI SANJEEV KUSHWAHA S/O SRI LALCHAND KUSHWAHA, VILLAGE- SHEKHPUR, BLOCK- SAIDPUR DIST- GHAZIPUR EMANATING FROM 132/33 KV S/S SAIDPUR (JAUHARGANJ), GHAZIPUR ON SEMI TURN KEY BASIS.
Work for Construction of 11 KV independent feeder for Uninterruptible power supply of Jagriti Mahila Prerna Laghu Udyog, Vill-Gauspur, Panjiri Plant from 33/11 KV S/s Bindki Town under Turn Key basis under jurisdiction of EE, EDD-II, Bindki, Fatehpur
Carrying out various electric works to Release new connection for each tubewell at various places of Nagar Nigam, Mathura Vrindavan on Turn Key Basis (Full Deposit Work) in the area of EE, EUDD III Mathura in the jurisdiction of SE, EUDC, Mathura
Construction of New 33 KV line and Maintenance of Old Line 250 Mtr. from 132 K.V. Sub-Station to Taping Point No. 1980 true (N25 34.915 E79 34.732) Independely to Feed, 33/11 K.V. Sub-Station Rath Second Distt. Hamirpur (Turn-key)
for the consturction work of 11 KV new line by shifting the 11 KV line passing through Agra Airport New Civil Enclave and Runway Extension complex site on Turn-key basis in full deposit schme under the area of EDD-2 Agra
Increasing the capacity of distribution transformers is among the works to be done under the work plan of Rs. 20.00 cr. allocated for the work of system strengthening under the additional BP 2023-24 in EDD-I, Chandauli. On Semi-Turn-Key Basis
Surveying Soil investigation design and Supply of all materials labour T and P etc complete required for completion of following works of Extension of pipe line of Ghatampur Water Scheme on turn key basis Construction of Tube well Over Head Tank Pump
Carrying out various electric works to Release new connection for each tubewell at various places of Nagar Nigam, Mathura Vrindavan on Turn Key Basis (Full Deposit Work) in the area of EE, EUDD I Mathura in the jurisdiction of SE, EUDC, Mathura.
PROVIDING, LAYING AND JOINTING OF AC PRESSURE PIPE BY MAZZA PROCESS OF 500 MM dia and 350 MM dia LENGTH 2.90 KM and 5.10 KM RESPECTIVELY WITH ALL FITTINGS AND OUTLETS ON TURN-KEY BASIS AT NEW MAHOI PUMP CANAL DISTRICT JALAUN