Loading…
Loading…
3,379 results • Best match
Bifurcation of 11 KV Line and Construct new 11 KV Line Semi turnkey base
In EDD Bansi under BP 2025-26 substation misscellenous work on semi turnkey basis
Modification of /upgradation of existing system of ETP of Khadia Project on Turnkey basis.
Turnkey Execution of a 15 MLD Modular Sewage Treatment Plant at Mathura, Uttar Pradesh
INCREASING CAPACITY OF 33/11 KV SUBSTATION JANGHAI DIST.-JAUNPUR ON SEMI TURNKEY BASIS.
INCREASING CAPACITY OF 33/11 KV SUBSTATION HARHUWA DIST. VARANASI ON SEMI TURNKEY BASIS.
Work of Electrification under Advance Deposit Scheme (Semi Turnkey Basis) in EDD-IV, Azamgarh
INCREASING CAPACITY OF 33/11 KV SUBSTATION MAHARAJGANJ, DIST- GHAZIPUR ON SEMI TURNKEY BASIS.
System Strenthening work (20 Crore Per District) on Semi Turnkey Basis Under EDC SAMBHAL
Construction of 33 KV RANGJI BAGICHA Line in Mathura district on semi turnkey basis
Work of DT metering on turnkey basis in Non RAPDRP IPDS Towns of PVVNL
CONSTRUCTION OF 1X5 MVA 33/11KV S/S NAWALI, DIST. GHAZIPUR ON SEMI TURNKEY
DESIGN, DETAILED ENGINEERING, MANUFACTURE, SUPPLY OF 220/132 KV SINGLE CORE 1200/1000/630 SQ. MM COPPER/ALUMINIUM CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES, CABLE LAYING, ERECTION OF JOINTS, TERMINATIONS ON TURNKEY
The work for construction of 33 KV U/G line form 132 KV Alaipur to 33/11 KV IDH and 33/11 KV Alaipur S/S with D/C 3x300 XLPE cable in the area of UEDD-VIII, Varanasi. under EE, UECD-II, Varanasi on semi turn key basis in Adittional business Plan
HVAC project for Golden Jubilee Building , Mechanical Science Building and Lecture Complex-II including Plant room and SITC of Sub-station for AC plant at National Institute of Technology-Rourkela. SH-SITC of HVAC system with centrifugal chillers ... on EPC basis .
Architectural cum DPR Consultancy Services for Construction of 896 flats/residential buildings of proposed Type 3 and Type 4 category in Devghat Jhalwa for Class 1 and 2 category officers of Honble High Court at district Prayagraj UP India EPC mode
Development of Convention Centre at Chunniganj on EPC Model Under Kanpur Smart City Limited. Interior WorK. Fourth Call
Enlistment of EPC Bidders for Development of Roof Top Solar PV Power Projects below 10 MW Capacity
Custom Bid for Services - Balance Electrical And CI works for EPC Package for NTPC Unchahar stage IV
Rural Electrification work on semi turnkey bais of Block Bah Jaitpur Kalan Shikohabad of Agra District
Construction of 220/132/33 kV GIS S/s Jalpura Greater Noida on turn key basis
Providing of better Electricity Supply in Newly Developed OR Extended Nagar Nikay Under jurisdiction of Electricity Distribution Division III Mainpuri On Turnkey Basis
WORK FOR SYSTEM AUGMENTATION / STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-II, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2023-24.
WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SIKRIGANJ, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2023-24.
WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-SIKRIGANJ, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2023-24.
WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-II, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2023-24.
WORK FOR SYSTEM AUGMENTATION/STRENGTHENING (ON SEMI TURNKEY BASIS) IN THE AREA OF ELECTRICITY DISTRIBUTION DIVISION-KAURIRAM, GORAKHPUR AGAINST BUSINESS PLAN SCHEME 2023-24.
Rural Electrification Work on Semi Turnkey Basis of Block-Achhnera Akola Bichpuri FatehpurSikri Jagner of Distt-Agra
Construction of SAS Based (2x60MVA), 220/33kV GIS Substation Trans Ganga City, Unnao on Turnkey Basis
CAMC of CT Scan machine on turnkey basis (Model Somatom emotion 16 slices)
Line Shifting due to Construction on Turnkey Basis Under EDD-I, Mau in Deposit Scheame.
FOR THE WORK OF AGAINST SANCTIONED PACKAGE NO. 76/2020-21 ON FULL TURNKEY BASIS
Replacment of VCB, Line Bifercation, Construction of Mobile Trolly on sami turnkey under EDD-III
Electrification of Two no Work with Semi Turnkey basis in Jama Yojana under EDD Padrauna
SEMI TURNKEY BASIS DEPOSIT WORK OF RAJKIYE HIGHSCHOOL OF GIVING ELECTRICITY CONNECTION UNDER EDD MAURANIPUR
BUSINESS PLAN 2025-26 SEMI TURNKEY BASIS 09 NO.WORK OF SUBSTATION PROTECTION UNDER EDD MAURANIPUR
Business Plan 2025-26 11 KV Line Work Under EDD-Kulapahad Mahoba (Semi-Turnkey Basis)
Upgradation work of capacitor bank installed at power substations under PuVVNL Varanasi On Turnkey basis
Construction of 132/33 KV S/s Khajni, Gorakhpur on turnkey basis against ESD-566.
INCREASING CAPACITY OF 33/11KV SUBSTATION JIWANATHPUR CHANDAULI ON SEMI TURN ON SEMI TURNKEY BASS.
Extension of under Construction SAS Based 220kV Hybrid Substation Jewar, Gautambuddh Nagar on Turnkey Basis
Construction of 2x5 MVA 3311 KV Substation Tilkagarhi in Mathura district on semi turnkey basis
Construction of 2x5 MVA 3311 KV Substation Dhangaon in Mathura district on semi turnkey basis
Construction of 2x5 MVA 3311 KV Substation Rajrai in Agra district on semi turnkey basis
Construction of 2x5 MVA 3311 KV Substation Ranhera in Mathura district on semi turnkey basis
Construction of 2x5 MVA 3311 KV Substation Anoda in Mathura district on semi turnkey basis
Construction of 2x5 MVA 3311 KV Substation Raal in Mathura district on semi turnkey basis
Work of DT metering on turnkey basis in Non-R-APDRP IPDS Towns of PVVNL
Civil and Electrical work, Supply and Installation of capital items and Furniture.
As Per NIT