Loading…
Loading…
1,194 results • Best match
Strengthening of road in District Uttarkashi, Uttarakhand State by Bituminous concrete in Tyuni Purola Naugaon Motor Road SH-17 Length 23.00 KM under Special Assistance Scheme
Remaining work of internal road in front of Job 14 to 21 at New Mandi Yard, Gadarpur (U.S. Nagar)
Reconstruction of internal road, drain and allied works of internal campus of UTDB and GIHM Nimbuwala, Garhi Cantt. Dehradun.
Construction of internal road in Cant Assembly, at Patel Nagar, Vijay Park, Panditvadi, Indrapuram, under State Sector, Distt. Dehradun.
Internal road and Drain Formation in Babugarh Nawabgarh Jivangarh and Dakpathar in Vikasnagar Constituency, Dist. Dehradun. Under State Sector.
SPECIAL REPAIR TO INTERNAL ROAD AT 127 INF BN (TA) ECO, GARH RIF CONNECTING BEAHAR ROAD UNDER GE DEHRADUN
Construction of Internal Road by Cement Concrete interloking Tile in Different Gram Sabha of Banbasa Area in Distt Champawat
Land development Terracing including internal road and retaining wall for PEQ facility at ICAR CITH Regional station Mukteshwar Uttarakhand
Under the state scheme, road widening work by DBMS, BC from Kathgharia to Paniyali in the Kaladhungi assembly constituency of Nainital district in the Haldwani Development block
Shifting of HT/LT overhead line from Kargi Chawk to Kali Mandir and Kali Mandir to Lalpul Patel Nagar due to road widening on semi turnkey basis
Maintenance work of Salna to Kanakote motor road transferred from PMGSY (One time maintenance)
Maintenance work of Nachani to Bansbagar motor road transferred from PMGSY (One time maintenance)
Construction of Purola to Chhara Motor Road Under PMGSY Phase XIX Package No UT13147
UT1315 Hadwari to Sewa Motor Road Under PMGSY Phase XXI Stage II Length 12.900
UT1313 Saur to Osala Motor Road Under PMGSY Phase XXI Stage II Length 28.100
slip clearance of Chailusain Devikhet MR Km5 to Bamoli MR stage II under PMGSY
Slip Clearance of L036 Bhuvneshwar to Rawalkhet Motor Road VR36 Stage II Under PMGSY
Maintenance work of Nachani to Bansbagar motor road transferred from PMGSY (One time maintenance)
Maintenance work of Dasaithal to Agron motor road transferred from PMGSY (One time maintenance)
Maintenance work of Chupkote bend Jamrari Motor road transferred from PMGSY (One time maintenance)
Slip Clearance of L027 Baikhet to Bawari Kichar Stage I AND II Under PMGSY
Improvement of riding quality by 30 mm B.C. of Dehradun - Kargi - Mothrowala Road, Matawala Bagh to Single Mandi Pathri bhag Chowk, Negi Sweet Shop to Sewla Kalan, etc. under Central Special Assistance Scheme (2020-21).
Construction of internal roads by CC interlocking tiles and brick paving extending from the Badheri Main Road towards the Mustafaabad graveyard in the Magroompur-Mustafaabad village of Piran Kaliyar constituency, under State Sector (Job-2)
Construction of S.S.O. Quarter, Yard Fencing, Approach Road and Other Misc. Civil Works at 33/11 KV Sub-Station, Rajsthar (Uttarkashi) under Electricity Distribution Division Barkot.
New approach road, drainage system and other civil work against pending work of TSS Railway bay at 132KV S/s, Kashipur under OandM Division, PTCUL, Kashipur
Construction Of J.E. Store, J.E. Room, Revenue Collection Room,Toilet, Approach Road and Other misc. civil works at 33/11 kv S/S Maldhanchaur Ramnager (Nainital)
C/o Approach road of CC Pavement, Random Rubble Masonry Wall, Reinforced Cement Concrete wall and Providing and fixing MS Railing of NBPGR Bhawali, Distt Naintital
Repair Of Road from Tanakpur Road (NH-125) to Polyplex Corporation at Khatima
Const. of Rural road (stage-1) from semwal dhalde namak tok of pipaldali swadi motor road to J.H.School Gadoliya via Gadoliya village , Block Jakhnidhar
Construction work of Rural Road from Village Akheti to Prempuri Under Block Chaukhutia District Almora(Stage-1) (With 05 Year Maintanance Under PBMC)
Construction of Rural road from Piran Kaliyar Roorkie road towards Hazikyum and Zunaid land Almarpur Abulhasanpur to Mevadkalan at block Roorkie Distt. Haridwar.
Widening of road from Goraparao Mall Tirahe to house of Ghanshyam Joshi in Haripurbachi via Indrapur Hanuman Mandir in Lalkuan Constituency of District Nainital Under Honorable Chief Minister Declaration No 28 2019.
Renewal and improvement of road from Shankaracharya Chowk to towards Kankhal up to DeshrakshakTiraha in Distt. Haridwar under Kumbh Mela 2021
Shifting and Strengthening of Distribution System Due to Road Widening by Nahar Covering (Chaufala Chauraha to Unchapul Chauraha and Unchapul Chauraha to Trimurti) Under Paniyali Water Supply Scheme
Construction of link road from Gram Sabha Dhurchu Tok Pantara to Akhuli Tok Bugaur under Block Moonakot.
Construction of link road from Dhungalgaon to Ojha Talla of Gram Sabha Ojha Talla under Block Kanalichhina.
Construction work of link road from Rausal to Kalady Thala in Lohaghat development block of Napad Champawat
Construction of C.C. link road in Gram Ghiroli in Betalghat block district Nainital under District sector SCSP
SPL REPAIR TO INTERNAL ROAD OF 217 FD WKSP AND AT VARIOUS LOCATIONS OF 5/1 GR UNDER GE DEHRADUN
Construction of various internal road by Interlocking tiles in village Haripurkalan of Rishikesh Constituency of Dehradun District Under State Sector.
Tender For Construction of CC Work in Internal Road and RR Wall Nagar Palika Mussoorie, Word No. 01 02 03
Construction of internal road and other misc. civil works on premises of 33/11 kv S/S ODPH Kathgodam, Haldwani.
SPL REPAIR TO INTERNAL ROAD OF OTM AND GOVT MD ACCN OF 414 FD HOSP AT ANARWALA UNDER GE DEHRADUN
Repairing/Reconstruction and widening of Internal road from Gandhi Bhawan Hostel to Tagore Bhawan Hostel by Hotmix at G.B.P.U.A.T., Pantnagar
Under respected CM announcement no. 206/2020, Internal road and Drain Formation in Village Selaqui, Sahaspur Constituency, Dist. Dehradun. (C.D.Dun)
Under Honorable Chief Minister announcement no. 358/2023, Reconstruction work of 15.00 Km main and internal roads damaged in the disaster along with drains in Veer Chandra Singh Garhwali Mandal in Raipur constituency of Dehradun district.
Renewal by B.C. and construction of footpath work on the internal roads of Shankaracharya Chowk, Devpura Chowk, Chandracharya Chowk, Aryanagar Chowk and the road from Barrier to Gugal Temple in District Haridwar under Kumbh Mela-2027.
Construction of road from NH to house of Nasim in Dashmesh Colony ward no. 04
One Time Maintenance work of Raigalbend Mulakote Motor Road Constructed by PMGSY (Length 8.00 KM)
UT-13-06 Construction of Thauldhar Ghadala Byali Motor Road Upgradation Under PMGSY DRRP 2