Loading…
Loading…
1,139 results • Best match
Re Jumpering by using cover conductor and earthing of transformer Town1 AND Town2
OIL LEAKAGE ARRESTING WORK OF 240MVA AND 315MVA TRANSFORMER AT 400KV SUBSTATION RISHIKESH
procurement of 132 kV and 33 kV Current Transformer at 132kV Substation Bindal
Work of repairing of 630KVA 33/0.440KV Transformer at 400KV Sub-Station, Kashipur
Re Jumpering by using cover conductor and earthing of transformer Town3 AND Town4
PROVN OF HT CABLE FOR TRANSFORMER AND MISC WORKS AT GE CLEMENT TOWN
Augmentation of Transformation Capacity of 80 MVA Transformer at 132 kV Substation Majra
SITC of Transformers and HT panels outdoor type under Bhairav Garhi GOV Pumping Water Supply Scheme Combined in block Dwarikhal and Jaiharikhal of District Pauri Garhwal
Supply and Construction of HT, LT line and 25 KVA Transformer at Vill- Kokilagaon Block Lamgara
COFI MAKE TRE820P/17 EARTHED POLE COMPACT IGNITION TRANSFORMER 230VAC-0.9 A, 50 HZ PLUG, SECONDARY, COFI MAKE HT CABLE FOR RODPLUG D= 6, 3MM 90? TRANSFORMER PLUG D= 4MM 90 DEG, 1800MM, 2 PLUGS (1840.01.
CA NO. CWE/HILLS/EWS/94 OF 2024-2025 REPAIR/MAINT OF TRANSFORMERS, HT NETWORK AND ALLIED WORKS AT GE 871 EWS
Arresting of oil leakage and painting of Transformers and other equipments at 132 KV Substation Bhagwanpur and 220 kV Substation Piran Kaliyar.
REPAIR/ MAINT OF DISTRIBUTION TRANSFORMERS INCLUDING DEHYDRATION PAINTING, EARTHING AND REPLACEMENT OF SPARE PART AT ROORKEE AND PURKAZI UNDER GE (MES) ROORKEE
Supply of LT metering Cubical metering and LT/CT for new and old Transformers of APDRP and IPDS Town under ETD Pithoragarh
Work for construction of additional sub station and increasing capacity of different transformers in EDSD Dhanori under EDD Urban under EDC Roorkee
Supply of Aluminium Lugs of Different sizes for Installation on LT and HT side in transformers of different Capacites under EDD Champawat
Provision for Rewinding of existing 1 No. 400 KVA CSS type transformer & 1 No. new oil type Transformer i/c of HT Panel, LT outdoor Panel & earthing at IGNFA Campus Dehradun. Subwork/Packages: Rewinding work
Providing for Rewinding of existing 1 No. 400 KVA CSS type transformer & 1 No. New oil type Transformer i/c of HT Panel, LT outdoor Panel & Earthing at IGNFA Campus Dehradun. Subwork/Packages: Rewinding work
7441120813 TRANSFORMER TOT 7 AS PER SPECN. NO. OUUO. 472.010 TU (Q3), 7441120826 CHOKE TO DRG. NO. 1531.20. 04.1 00 (Q3), 7441120942 CHOKE AS PER SPECN. NO. KR6.050 (Q3), 7441123188 TRANSFORMER AS PER SPECN. NO. IUMK. 671323.001 (Q3)
Preventive maintenance of 25, 63 and 100 KVA Transformer related to 33/11 KV Substation Khatima under Electricity Distribution Division, Khatima
Supply and Installation of online dry out system for Spare Generator Transformer (306MVA, 15.75KV/42
REPAIR/MAINT OF HT UNDERGROUND CABLE, TRANSFORMER, VCB AND CONNECTED ACCESSORIES AT IMA DEHRADUN
Repair and refurbishment of 12.5 MVA Transformer (6.6/132 kV) of Kulhal Power Station
Transformer oil filtration and testing at 132KV Substation, Ranikhet under OandM Division, PTCUL, Almora
Repairing of Unit Auxiliary Transformer (UAT) of machine no. 4 of Khodri Power Station
Construction of transforment shed for IGNFA at FRI Campus, Dehradun. (Civil Work & Electrical Transformer)
Purchase of LV and Neutral bushing for 29 MVA Generator Transformer of power house
MAIN TRANSFORMER 6531 KVA FOR WAG-9 LOCO AS PER SPECN.NO.CLW/ES/3/0456.
SUPPLY OF 4500 NOS BIS MARK EEL 2 NEW 11/0.433KV 100 kVA ALUMINIUM WOUND DISTRIBUTION TRANSFORMERS THROUGH RATE CONTRACT OF TWO YEARS
Work of arresting of 02 Nos. 315MVA and 02 Nos. 160MVA transformers oil leakage without draining of oil at 400KV Sub-Station ,Kashipur
SUPPLY OF 400 NOS. BIS MARK ENERGY EFFICIENCY LEVEL2(NEW) 11/0.433KV 250KVA COPPER WOUND DISTRIBUTION TRANSFORMERS THROUGH RATE CONTRACT OF TWO YEARS
CENTRIFUGING AND OVERHAULING OF POWER TRANSFORMERS INSTALLED IN 33/11 KV S/S BAGESHWAR and KAFLIGAIR UNDER EDSD-1ST BAGESHWAR UNDER OandM HEAD
CARTAGE OF DAMAGED TRANSFORMERS FROM 33/11KV S/S KAPKOTE, BANLEKH AND VIJAYPUR TO WORKSHOP HALDWANI UNDER EDSD 2ND BAGESHWAR UNDER OANDM HEAD
REPAIR / REPLACEMENT OF LT UG CABLES, MCCBS, LT SWITCH GEARS, LT PANELS, TRANSFORMERS, VCBS, AND OTHER MISC EXTERNAL ELECTRIC WORKS AT DIBER HALDWANI
SUPPLY OF 100 NOS. BIS MARK ENERGY EFFICIENCY LEVEL2(NEW) 11/0.433KV 400KVA COPPER WOUND DISTRIBUTION TRANSFORMERS THROUGH RATE CONTRACT OF TWO YEARS
Repair and overhauling of cooling fans installed in 100MVA and 40MVA transformers at 220KV S/s, Haldwani under 220KV OandM Division, PTCUL, Haldwani
Increasing Capacity of Transformers due to Improvement of Low Voltage problem at various places in the area of EDSD, Balawala under EDD, Raipur
Supply of current Transformers CT at 220 KV Substation Piran Kaliyar and 132 KV Substation Bhagwanpur under 220 KV OandM Division Piran Kaliyar
REPAIR/MAINT OF 33/11 KV MRS, HT BREAKERS, HT UG CABLES, TRANSFORMERS AND ALLIED HT ELECTRICAL WORKS UNDER GE CLEMENT TOWN, DEHRADUN.
Augmentation of electrical facility Phase-I including SITC of 500 KVA DG Set, 2x1000 KVA Transformers, MV Panels etc., at IIRS Campus, Dehradun
Augmentation of Transformer Capacity from 2x160 MVA(20/132KV to 3x160MVA 220/132KV Supply, Erection, Testing and Commissioning of 01 No 160 MVA(220/132KV) Transformer at 220KV Substation Virbhadra under 220KV Division, Rishikesh
Construction of HT and LT Line and Transformer to release New Service Connection for Rajkiya Polytechnic Takula with supply of decentralised material under EDD Almora
Supply and Construction of HT, LT line and 25 KVA Transformer at Tok Dipeshwar, Vill- Sirsora in Block Lamgara
Supply, erection and commissioning of LT ACB 800 Amp. for 250/400 KVA DTR in 11 KV Awas Vikas feeder under 33/11 KV Sub-Station, Nagar Nigam under EDSD, Haridwar Road under EDD, Rishikesh.
Construction of additional 100 kVA Sub-Station to avoid damage of transformers from overloading at various sites under EDSD, IT Park under EDD, Raipur.
Work of checking the online health monitoring of various 132 KV electrical equipments and 80 MVA transformers installed at 220 KV Sub-Station, Mahuakheraganj
Shifting of Stock Material (including Power Transformers) from Store Sub Centre Srinagar to another newly constructed store sub centre chauras (shrinagar) and esc Rishikesh
Work of detailed assessment by diagnostics and analysis for incipient fault prediction of 315MVA and 160MVA Power Transformers installed at 400KV Sub-Station, Kashipur
System study, Design, Manufacturing and SITC of 33 kV PTs at primary end of 33/11 KV, 2x10 MVA transformers installed at IIT Roorkee
SUPPLY OF 11000 NOS. BIS MARK ENERGY EFFICIENCY LEVEL2 NEW, 11/0.433KV, 25 KVA, ALUMINIUM WOUND, DISTRIBUTION TRANSFORMERS THROUGH RATE CONTRACT OF TWO YEARS