Construction of Cold Storage under RIDF-31 Scheme 2025-26 at Five different Locations namely Kundagola MMY, Sindagi MMY, Hosadurga Main Market Yard and Rona(Holealur APMC)SMY, Habbanaghatta Kaval(Arasikere APMC) Sub Market Yard
Laying of cable in Existing Trench/GI pipe/Stone ...
Upgradation of Power lines infrastructure at industrial area Karauli
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
development and beautification of ghodo ka chok circle jodhpur
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 100 mm on top of the cable, (d) Lay the protective Common burnt ...
SPL REPAIR TO RE-WIRING, LIGHTNING AND FIXTURES IN STORES SHELTERS BLDG NO
Supply, laying and testing cable XLPE Insulated ,screened, ...
PROVISION OF AIR CONDITIONERS AT COMMAND REFERENCE LIBRARY BUILDING(Bldg No P-199) AT NAVAL BASE KOCHI
... of interlocking tiles for laying of cables and refixing/repairing the same after laying of cables, matching with the existing ...
Replacement of damaged UG cable from HVC SS to near HVC cottage 682 panel and Geetha park in ESD-South,Tirumala
Laying of U.G cables upto 50 Sq.mm and back filling of trench including labour charges etc., complete.
COMPREHENSIVE REPAIR/MAINTENANCE OF LT CABLES, LT PANELS, U/G CABLES, POLES AND CONNECTED LT WORKS AT PH- I (RUPA, GACHHAM, BIRPUR, DP,BOMDILA) AT GE TENGA
... any type of soils/rock for laying LT UG cable through pipe after laying /through the cable trenches will be filling ...
Replacement of 33 KV Panel under 33/11 KV Sub-Station, IT Park under EDSD, IT Park under EDD, Raipur.
Laying of Underground 33 KV Cable in Trench
Supply and Installation of 990 KVA Compact Secondary Substation at Village Badowala Near Water Tank under EDSD, Jollygrant under EDD, Doiwala.
Laying of underground 11 KV Cable in Trench
Supply and Installation of 990 KVA Compact Secondary Substation at Aadarsh Nagar Near Milan Kendra under EDSD, Jollygrant under EDD, Doiwala
Laying of underground 11 KV Cable in Trench
PROVISION OF EV CHARGING INFRASTRUCTURE OF 240 KW FAST CHARGER FOR ELECTRIC BUSES AT HQ TC UNDER GE (AF) BANGALORE
... of cable 8cm thick before laying of cable and 15 cm thick after laying ...
IMPROVEMENT OF ATOMISATION OF CLEANING SYSTEM AT SWIMMING POOL AND PROVN OF SHED AND MOSQUITO WINDOW AND DOOR AT MES RAMGARH CANTT
... layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including ...
PROVN OF WASH ROOM NEAR DRILL SQUARE AT OTA UNDER GE STM CHENNAI
... out soft / loose soil for laying cables / pipes / erection of poles ...
REPAIR AND REPLACEMENT OF STREET AND SECURITY LIGHT AND OTHER ALLIED WORKS AT SECTOR C, E AND F AREA IN ARMY AREA JODHPUR
... layers (8cm thick before laying of cable & 15cm thick after laying cable to a total of 23cm) including ...
PROVISION OF UG CABLE BETWEEN CTL SUB STATION TO SUB STATION NO.5 AT GH AREA AND CONNECTED WORKS UNDER GE DSSC WELLINGTON
... hard standing/ path etc for laying LT cables through pipes of any size ...
Addition & alteration in existing Electronic Interlocking system (Medha Make) at Jaunpur station in connection with Chord Line work between Muftiganj-Mahgawan bypassing Jaunpur station and indoor & outdoor signalling works in connection with closure of LC-40 in CPB-MGW section of Lucknow Division.
SDO/Cable Laying/020, dt.31.10.11. The marker shall be fixed at various places of cable route as per instruction of Eng. at site.
1. MAS Division- AJJ -JTJ section- Proposed 1x7.0x3.6m RCC Pre-cat box subway at km 145/200-300 in lieu of existing LC No: 61 between Latteri and Kavanur stations (Air Push Method) 2. MAS Division - Proposed 1x7.7x4.0m Pre-cast RCC box subway in lieu of existing LC No: 70 at km 165/400-500 between Valathoor and Melpatti stations (Air Push Method) 3. MAS Division-AJJ-JTJ section - Proposed 1x7.70x3.6m Pre-cast RCC box subway at km 166/900 in lieu of existing LC No: 71 at km 167/0-100 between Valthoor and Melpatti stations (Air Push Method) 4. MAS Division - AJJ-JTJ section - Proposed 1x7.00mx3.66m RCC Pre-cat box subway in lieu of existing LC No: 74 at km 172/300-400 between Melpatti and Pachchakuppam stations (Air Push Method)
Laying of Railway's cables below ground level removed... back the same earth after laying the cable, without causing any damage ...
Rate contract for Day to Day Electrical work at SMS Hospital Jaipur
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 100 mm on top of the cable, (d) Lay the protective Common burnt ...
SIGNAL AND TELECOM PORTION OF WORKS CONNECTION WITH FOB WORKS IN VEU,PTMS,MLTR AND VJ OVER CHENNAI DIVISION
494.00 crossing of cables, laying of DWC/ RCC pipes with collar/coupling,... sleepers for track crossings. Laying of cables is not included in this ...
SPECIAL REPAIRS TO BLDG NO P-551, P-315, P-48 AND P-92 AT ETI AFS JALAHALLI
... refilling in trenches before laying of cable 8 CM and 15 CM after laying of cable. This is then gently punned ...
Signaling related works for provision of Augmentation of yard lines at Bordhai, Navegaon, Hirdagarh and Iklehra stations.
... Engineer-in-charge. This includes laying & termination of cable, if any from panel Room ...
Signaling related works for provision of Augmentation of yard lines at Bordhai, Navegaon and Iklehra stations.
... Engineer-in-charge. This includes laying & termination of cable, if any from panel Room ...
Undergrounding of electric lines and electrical beautification work in front of Dadabari Rendal Park (Abhyudaya Nagar)
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable. (d) Lay the protective Common burnt ...
Repair and maint of LT electricity distribution network in Prayag, Triveni and OTM Accn in Old Cantt under GE (East) Prayagraj.
... ground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches and consolidated ...
Repair and maint of LT electricity distribution network, Sub stations in Pawan, Naidu, Ganga, Yamuna Vihar at Old Cantt under GE (East) Prayagraj.
... ground cable (8 cm before laying the cable and 15 cm after laying the cable) in trenches and consolidated ...
CA NO. GE AF NO.1 / GUR-56 / 2026-27 REPAIR/MAINT OF LT DISTRIBUTION NETWORK SYSTEM, LT UG CABLE, LT JOINTS FINDINGOF FAULTS, LT PANELS, MCCB WITH ALLIED WORKS AT 13 BRD AF,16 BRD IN TECH AREA UNDER GE (AF) GURGAON NO 01.
Excavation in trenches n.exc 1.5 mtr wide and n.exc 1.5 mtr in depth and getting out soft/loose soil complete all as specified and as directed for foundation of stay, laying of cable etc.
CA NO. GE AF NO.1 / GUR-42 / 2026-27 REPAIR/MAINT OF LT DISTRIBUTION NETWORK SYSTEM, LT UG CABLE, POLES PANELS, LT JOINTS FINDING OF FAULT LT PANELS, MCCB WITH ALLIED WORKS AT 13 BRD AF DOMESTIC UNDER GE (AF) GURGAON NO 01.
Excavation in trenches n.exc 1.5 mtr wide and n.exc 1.5 mtr in depth and getting out soft/loose soil complete all as specified and as directed for foundation of stay, laying of cable etc.
Pratapnagar:- Construction of various union offices.
Digging of cable trench 300 mm wide and 200 Metre mm deep in concrete/tar road/platform and refilling to its original position after laying of cable in 50 mm diameter HDPE pipe
As described in Bill of quantities
... layer of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable complete all as specified ...
REPAIR/MAINT INTERNAL ELECTRIFICATION AND CONNECTED ALLIED WORKS IN OFFICERS MD ACCN UNDER GE(WEST)PATHANKOT
M&L for sand cushioning to under ground cables with a layer of sand 8 cm before laying the cable and 15 cm after laying the cable complete all as specified
Repair/maint to LT network system in AOR of Central Power House under GE (Utilities) Udhampur
Supply and laying LT UG cable XLPE insulated armoured and PVC sheathed 1100 volts grade with aluminium conductor stranded of following sizes all as specified and directed :-
Shifting / Modifications of 11 KV Power Line Crossing works between SPRD-KTGA (Loc: 159/9-11) and Power supply arrangement works between Bhalumaska- Singapur road including miscellaneous Electrical General Services works in connection with doubling works between Koraput-Singapur Road and Design, Supply, Erection, Testing & Commissioning of 33/11 KV, 5MVA out door type sub station at Rayagada.
Laying of Railway/ Contractor supplied LT/HT XLPE Single cable laying along the road/track of different sizes.
PROVN OF QTY 20 NOS ISOLATION TRANSFORMER 2KVA FOR AFNET L2 SWITCH AND LIGHTING ARRESTER, EARTHING AND CERTAIN E/M ITEMS AND ELECTRICAL CABLE WORK IN AIRMEN AND DSC MESS AND FIRE PROOF AIR CONDITIONER WITH FAN COIL UNIT WITH AUTO SWITCH AT KIRAN FSS
Supply and laying dry sand cushioning for cable protection in trenches 8 cm before laying cable and 15sm deep cover the cable complete all as specified and directed.
21/2026-27
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 100 mm on top of the cable, (d) Lay the protective Common burnt ...
TENDER FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 4 CORE × 2.5 MM² COPPER ARMOURED CABLE FOR PUBLIC ADDRESS (PA) SYSTEM AT BPCL JOBNER INSTALLATION
The scope of work includes supply of 4 Core × 2.5 mm² cable, laying of cable through
GES/PKT/32/2026-27 PROVN OF GUARD ROOM WITH ATT BATHROOM AND WASH BASIN FOR 07 SENTRIES NEAR FAMILY QTRS OF ZONE WKSP AND PROVN OF 03 BATHROOM WITH TOILET FOR SINGLE JCO LIVING BLDG NO. T-248 AND T-249 OF GUARDS AND PROVN OF 01 FOL STORE SHED FOR MT
... layer of 8 cm thick before laying the cable and second layer of 15 cm thick after laying the cable all as specified and directed. ...
CONSTRUCTION OF SENTRY POST WITH GUARD ROOM AT PKT A OF NEW KLP, HQ JL WING, THE INF SCHOOL BELAGAVI UNDER GE BELGAUM
... layers of 80mm thick before laying of cable and second layer of 150mm thick after laying of cable, levelled and punned down ...
Design, Manufacture, Supply, Installation, Testing and Commissioning of Firefighting system SITC at Anik Chembur Yard, MDL.
... place of installation. 'Laying of cable in the prepared trench / ...
CA NO. CWE/HILLS/RKT/11 OF 2026-2027 PROVN OF SQUAD POSTS WITH COVERED SHED AND TOILET BLOCKS AT KRC UNDER GE RANIKHET
... fine sand 8 cm thick before laying the cable and 15 cm after laying the cable in trenches to cover under ...
PROVN OF WATER PIPELINE AND PUMPSET AND SPL REPAIR TO BLDG NO T300 OF 871 MED REGT SUMDO DET AT SUMDO UNDER GE 863 EWS
Supply, laying and testing cable XLPE Insulated ,screened, ...
REPAIR / MAINT OF DG SETS, SWITCHGEAR, LT UG CABLES, MISC ELECTRICAL WIRES AT VSB AREA UNDER GE (AF) TUGHLAKABAD
... sand, 80mm thick before laying of cable and 150mm thick (punned down to 100mm thick) after laying of cables, in trenches/ducts, complete ...
Construction of 03 ROBs (i) 2 lane ROB including approaches with LHS in lieu of LC No 108C at Km 947.353 on Utratia- Sultanpur section in Lucknow division (ii) 2 lane ROB with approaches in lieu of LC No 138AC at Km 973.806 (Sindurwa) Utratia- Sultanpur Section in Lucknow Division (iii) 2 lane ROB at LC 43A at Railway KM Ch 830/7-8 between Jaunpur and Shahganj Railway station in Lucknow division on Northern Railway, under the Road Safety Project Unit (RSPU)/NR New Delhi.
... kg/sqm in footpath of ROB for laying cable with all contractor's materials ...
SPL REPAIR/ REPLACMENT OF LT OVERHEAD LINE TO LT UNDERGROUND CABLE , CONNECTED ITEMS, SECURITY LIGHTS, HIGH MAST LIGHTS STREET LIGHTS AND PROVN OF PUMP SETS AND CONNECTED ITEMS UNDER GE SAUGOR
... cable , 80 mm thick before laying the cable 150 mm thick after laying the cable complete all as specified ...
REPAIR OF DAMAGED AND UNSV SUBMAIN WIRING, TUBE LIGHT FITTING, SWITCH SOCKET ETC AT MH NAMKUM AND UNSV LT PANELS DAMAGED INSULATOR AT NAMKUM AND KHOJATOLI UNDER GE RANCHI
M & L for Sand cushioning trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.
ADDN ALTN TO CERTAIN AIRMEN BILLETS AT 21 WG UNDER GE AF LEH
... of sand 8cm thick before laying of cable and 15 cm after laying of cable complete all as specified ...
INSTALLATION OF HIGH MAST LIGHTING SYSTEM AND MINI MAST LIGHTING SYSTEM ALONG WITH OTHER ELECTRICAL WORKS AT DHAPA DUMPING GROUND SURROUNDING IN WARD NO-58.BR. NO-VII
Laying through Underground Trech.(a)Laying of one No. cable upto 35 sqmm in underground ...
Electric work in Newly under Constructed Hostel in Nursing College at District Hanumangarh
... mm along the trench, (b) Lay the cable in the middle of the trench,... height 125 mm on top of the cable, (d) Lay the protective Common burnt ...
Signaling related work in connection with Track Machine siding at Bordhai station of Nagpur Division.
... plan and refilling after cable laying. This work includes covering ...
PROVN OF 04 X SOLAR WATER HEATER (1000 LTR) FOR BLDG NO P-320 AND P-534 (OR LIVING BK) OF 2 TTR, 1STC AND CERTAIN REV AND MINOR WORKS IN AOR OF AGE B/R-III, AGE E/M E/S AND AGE E/M W/S UNDER GE (WEST) JABALPUR
... protection in wall/under gorund laying of UG cables including SNAP-FIT Coupler ...
S and T work (Indoor and Outdoor signaling works) with modification in existing Electronic Interlocking System of Medha Make EI at Delhi Safdarjung (DSJ) station in c/w provision of yard remodeling in connection with construction of New Platform No. 4 & 5 (Island Platform) at DSJ station in Northern Railway.
... RDSO/SPN/204/2011, and the laying of cable in the boring under the... be crossed. This includes laying of cables in trench. The depth of ...