Loading…
Loading…
10,704 results • Best match
ANNUAL MAINTENANCE ESTIMATE FOR STORM WATER DRAINAGE SCHEME IN SECTOR 14P-II AND SECTOR 33P HISAR (2026-2027)
[24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core
Rate Contract for Passive Networking and OFC Work at NIT Rourkela, Odisha - 769008
HDPE Pipe Laying and Laying of fiber cable through HDPE pipe, welding, cutting, drilling and finishing.
For Repairing/Changing of Cork Sheet, Stud, Rubber Bush and Insulator of 2 nos. Transformer (i) 630KVA,3.3KV/440V Sl.No.NPC/01/TRA,(ii)1MVA,11KV/6.6KV Sl.No.KM 351/J at NPC(2)Rewinding of tank repairing of 100KVA Transformer,550V/220V at LBC(3)
(B) Cable Jointing Laying & 120sqmm :- Cable Jointing out door 120sqmm (10.2.2 )
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk, FPB, DB etc at CD block AA- I under Newtown Division
Cable Laying & dressing of 1.1KV 1Cx630sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (More than2 cables in a trench,1C630SQMM 8 Run))
REMOVAL AND FIXING OF CONTROL VALVES AND OTHER INSTRUMENTATION ITEMS IN BM4 AT TNPL UNIT - II
8337500519 Cable laying armoured up to 8 core signal / digital cable (0.5 sqmm to 1.5 sqmm)
Conversion of LT overhead conductor to underground cable and connected items at Fd Regt to Tatra sewage pump house line under GE Gurdaspur.
M&L for sand cushioning in trenches using fine sand to under ground cable, laid in two layers 15cm before laying the cable & 8cm after laying the cable complete all as specified and directed.