Installation of 04 nos Electric substation for LHCM In RV seam of Khottadih Colliery Panaveswar Area
Carrying and transportation of 500mtr 150 sqmm HT cable from surafce to underground and laying from borehole location to 38L substaion
Work involving the shifting of 33 kV lines to underground lines under the Full Deposit Scheme within the jurisdiction of the Electricity Distribution Division, Shikarpur, Bulandshahr
Underground Cable Laying with bricks sand, all material provided by the contractor.
As per the NIT
Supplying and laying of 25 mm aluminum conductor PVC insulated armored sheathed cable 1100 volts grout with M.S. clamps of suitable size as directed by Engineer-in-charge, complete in all respect. Armoring shall be properly connected by clamps (Four underground laying cable shall be placed at a depth of 750 mm below ground level over a cushion of 75 m thick and all around and protected with bricks on sides and top).
Construction of Maharishi Kashyap Chowk at MC Ladwa , Kurukshetra
[24.2.2.2]LT CABLE 2.2. Laying of underground cable 0.75 metre below ground level covered with sand and bricks including excavation and refilling of trenches.:- 16 Sq mm to 35 sqmm 2 to 4 Core [Through Rate]
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk FPB DB etc at CC block AA I under Newtown Division
Cable Laying & dressing of 1.1KV 1Cx630sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (More than2 cables in a trench,1C630SQMM 8 Run))
System improvement work by drawl of HT LT line with installation of RMU DTR LT Kiosk FPB DB etc at BA BG block AA I under Newtown Division
Cable Laying & dressing of 1.1KV 1Cx630sq.mm. XLPE Cable in the excavated cable trenchs as per drawing no. PLN(D)/SS/105 Dated 05.05.2015 and instruction of the site engineer. (More than2 cables in a trench,1C630SQMM 8 Run))