Loading…
Loading…
1,043 results • Latest
Emergent Restoration of Khud and Hill Side (23.20 kmp, 24.40 kmp (Protection Wall Below Primary Health Centre) 25.50 kmp (Protection Wall below House) and 25.70 kmp including Slip Clearance in stretches of Upper Rishi Road under Kalimpong Division PW
Emergent Restoration of Road Bench at 4.85 kmp, 8.30 kmp, 9.45 kmp and 10.50 kmp of Lower Rishi Road under Kalimpong Sub-Division - I of Kalimpong Division PWD in the District of Kalimpong.
Conservation Restoration of Katherine Graham Memorial Chapel, Dr. Grahams Homes, Kalimpong -- Electrical Works and Approach Road. Under Kalimpong Division, PWD (Only Approach Road Works)
Repairing Potholes with mending depression in stretches from 0.50 Km to 2.0 Km, 4.5 Km to 7.5 Km and 9.0 Km to 11.0 Km of NH 717 (A) at Pedong Bazar to Lingsay (Rhenock at Sikkim Border VIA Kagay) Road, Kalimpong under P.W.D. Kalimpong Division.
Repairing Potholes with mending depression in stretches from 13.0 Km to 15.50 Km, 18 Km to 21 Km, and 23.0 Km to 24.92 Km of NH 717 (A) at Pedong Bazar to Lingsay (Rhenock at Sikkim Border VIA Kagay) Road, Kalimpong under P.W.D. Kalimpong Division.
Repairing Potholes with Mending Depression in stretches from 24.20 to 25.00 Km, 25.50 to 26.00, 27.00 to 28.00 Km, 29.00 to 30.00 Km and 30.00 Km to 31.00 Km of 12th Mile to Nimbong Fatak Road, under Kalimpong Division, P.W.D.
Erection of Temporary Structures such as Dias, Pandal, Barricading, Electrical and IT Infrastructure works in connection with the Durga Puja Carnival 2025 in the district of Kalimpong under Kalimpong Division PWD Location Details- Upper Cart Road
Construction of 2nd Record Room in Kalimpong District Court Building Complex at Kalimpong under PWD, Kalimpong Division.
Slope stabilisation work to protect landslide at chainage 2.47 Km of 12th Mile to Nimbong Fatak under Kalimpong Division, P.W.D.
Slope Stabilisation work at to Protect Landslide at 3.45 Km of Pedong to Rangpo via Kashyong Raniban up to (Bhalu Marg) Road under Kalimpong Division, PWD in the District of Kalimpong.
REPAIR MAINT REPLACEMENT OF INTERNAL WIRING SUBMAIN WIRING CONTROL DBs MCBs US FITTING FIXTURES GYSER EXHAUST FAN CEILING FAN AND CONNECTED MISC ITEMS OF WORK AT VARIOUS MD OTM ACCN AT PEDONG DALAPCHAND AP ALGARAH AND TEESTA TCP MIL STN UNDER GE 867
REPAIRS TO STEEL FURNITURE INCLUDING PAINTING AND CONVERSION OF GI CHARPOY WITH NYLON NEWAR TO HARD BED AT KALIMPONG AND SHERWANI MIL STN UNDER GE 867 EWS
Construction of single (1) unit medical office quarter , building at Jaldhaka PHC, Gorubathan Block, Kalimpong.
Slope Stabilisation work to protect landslide at 24.50 kmp of Upper Rishi Road under Kalimpong Sub Davison I of Kalimpong Division PWD in the District of Kalimpong.
Slope Stabilisation work at to Protect Landslide at 9.06 Km und 9.39 Km of 12th Mile to Nimbong Fatak Road under Kalimpong Division, PWD in the District of Kalimpong.
Clearance of Drain (Post Monsoon) including jungle cutting in between 1.00 to 1.95, 2.10 to ... to 13.95, 14.25 to 14.95 km of Lower Rishi Road under Kalimpong Sub-Division - I of Kalimpong Division PWD.
Construction of drain on the hill side slope along the road from 18.900 kmp to 23.000 kmp of Upper Rishi Road under Kalimpong Division, PWD in the District of Kalimpong
E-TENDER FOR SUPPLY OF DIETARY ARTICLES TO KALIMPONG DISTRICT CORRECTIONAL HOME FOR THE PERIOD FROM THE DATE OF ACCEPTANCE TO 30-09-2026
Construction of drain on the hill side slope along the road from 15.250 kmp to 18.650 kmp of Upper Rishi Road under Kalimpong Division, PWD in the District of Kalimpong.
Slope Stabilisation work at to Protect Landslide at 10.47 Km of 12th Mile to Nimbong Fatak Road under Kalimpong Division, PWD in the District of Kalimpong.
Construction of 2M X 2M Box Culvert at Chainage 12.80 Km of Relli to Deorali Road under Kalimpong Division, PWD in the District of Kalimpong.
Slope Stabilisation work to protect landslide at 13.00 kmp of Lower Rishi Road under Kalimpong Sub Divison 1 of Kalimpong Division PWD in the District of Kalimpong.
Slope Stabilisation to protect to landslide at 6th Mile Bridge at 9.05 kmp of Lower Rishi Road under Kalimpong Sub Davison I of Kalimpong Division PWD in the District of Kalimpong.
Construction of drain on the hill side slope along the road from 23.600 kmp to 26.800 kmp of Upper Rishi Road under Kalimpong Division, PWD in the District of Kalimpong.
Slope Stabilisation work to protect landslide at 10.90 kmp of Lower Rishi Road under Kalimpong Sub Davison 1 of Kalimpong Division PWD in the District of Kalimpong.
Slope Stabilisation work at to Protect Landslide at Tashiding Bridge 3.30 KMP of Lower Rishi Road under Kalimpong Sub Division 1 of Kalimpong Division, PWD in the District of Kalimpong.
Construction of 2M X 2M Box Culvert at Chainage 5.60 Km of Relli to Deorali Road under Kalimpong Division, PWD in the District of Kalimpong.
Slope stabilisation work to protect landslide at chainage 2.130 Km and 7.05 Km of Pedong to Rangpo via Kashyon, Raniban (upto Bhalu Marg) under Kalimpong Division, P.W.D.
Slope Stabilisation work to protect landslide at 1.40 kmp of Link Road under Kalimpong Sub Davison 1 of Kalimpong Division PWD in the District of Kalimpong.
Slope Stabilisation work to protect landslide at 12.50 kmp of Lower Rishi Road under Kalimpong Sub Divison 1 of Kalimpong Division PWD in the District of Kalimpong
Purchase of Electric Dredging/Desilting Pump for silt removal from HM Gates at TLD-III PS
Construction of Culvert near ICDS centre no 811 , oraon line, lower fagu
Repairing of cc road from Shiva Chhetri house to Binu Darjee house
Construction of bridge at kal jhora near Kalpana thapa house
Construction of Boundary Wall and 03 nos Gate at District Court Premises in the District of Kalimpong under Kalimpong Division,PWD.
Supplying, Fitting and Fixing of new furniture and furnishing for Tashiding Tourism Property.
Addition-Alteration and Repair and Renovation work of existing building at Kalimpong District Office- Civil Works under Kalimpong Division,P.W.D
Road surfacing work in stretches from Ch. 12.00 Kmp to 13.550 Kmp of Relli Deorali Road, under Kalimpong Division, P.W.D.
Annual Maintenance work at Tashiding Tourism Property
Annual Maintenance work at Batabari Tourism Property
Repairing Potholes with mending depression in stretches from 23.10 Km to 24.00 Km,26.00 Km to 27.00 Km, 28.00 Km to 29.00 Km and 31.00 Km to 32.10 Km of 12th Mile to Nimbong Fatak Road under Kalimpong Division,P.W.D.
Repairing Potholes with mending depression in stretches from 0.00 kmp to 3.50 kmp of Pedong to Rangpo via Kashyong Raniban (upto Bhalu Marg), under Kalimpong Division,P.W.D
Repairing Potholes with mending depression in stretches from 0.00 kmp to 4.300 km of East Main Road under Kalimpong Division,P.W.D.
Repairing Potholes with mending depression in stretches from 0.00 kmp to 3.100 km of Rinkingpong Road under Kalimpong Division,P.W.D.
Restoration of Road Bench damage due to heavy rain on 04.10.25 to 05.10.25 at 1.20 Km of Managers Bungalow to Rabasta Busty Road under Kalimpong Sub-Division-1 of Kalimpong Division PWD.
Minor repair of Cottages and Old Building of Peshoke Inspection Bungalow at Peshoke under Kalimpong Sub Division 1 of Kalimpong Division PWD
Restoration of Khudside damage due to heavy rain on 04.10.25 to 05.10.25 at 1.2 Km of Managers Bungalow to Rabasta Busty Road under Kalimpong Sub-Division-1 of Kalimpong Division PWD
SPL REPAIR TO BLDG NO T536 2XTOILET AND BATHROOM) P203 6XTOILET AND PROVN OF WALL PANELLING FALSE CEILING IN BLDG NO T273 AND PROVN OF FLOOR TILING FALSE CEING IN BLDG NO A41 BN MANDIR OF 8 KUMAON UNDER GE 867 EWS
Creation of Special Court within ground floor of District Court Building at Kalimpong under Kalimpong Division, PWD
Repairing Potholes with mending depression in stretches from 0.00 kmp to 2.600 kmp of West Ricksaw Road under Kalimpong Division,P.W.D.