MTPS I CA RWS Overhauling of Raw Water Pump No 02 and its butterfly valve dismantling fabrication and Erection and Painting of damaged raw water intake screens at Raw water pump house
Providing Special repair works to the Police Training School at Mettur in Salem District.
MTPS I Mill Plant Unit II Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 2A 2B 2D 2E 2F to 180 deg at 16 meter level above the mill and below the 18 meter floor etc during capital overhaul 2024 25
MTPS I CA CWS II Overhauling of existing I.D fan Gearbox for 1 No including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower IV
Please approve the tender. Please approve.
Please approve. Ok.
SEALKIT-HYD. CYL-ORANGE PEEL GRAB
MTPS I Mill Plant Unit II Dismantling hard facing and assembling of 1 meter length coal pipes after MOE mill outlet Elbow in Mill 2A to 2F during Capital overhaul 2024 25
MTPS I BM Lift Supply Erection and commissioning of Control Panel 1 No for Boiler Lift II of MTPS I
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft etc in Coal Mill 3F (Tilting work)
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom in any Mill 2A to 2F of Unit II
Supply of Hydrazine Hydrate
MTPS I Mill Plant Unit II Strengthening Rectification of raw coal bunkers 2A 2B 2C 2F leak arresting work by patch welding and Providing stiffeners during COH 2024 25
MTPS I Mill Plant Unit II Dismantling reconditioning overhauling and assembling of butterfly valves in mills feeder seal airline during 2A to 2F and Fabrication of various lengths of 40 NB cooling water pipe flange and assembling in the 2A
Mill Plant Unit II Applying two layers ceramic wear coat Eromat at mill outlet elbow Ceramic 90 deg bends released from Unit II during COH 2024 25
Supply of 12V 65AH Type EP 65 12 Battery and buy back of existing battery set
Procurement of Cleaning Balls and Consumables for Condenser Online Tube cleaning system 4 Items
MTPS I Mill Plant Reconditioning of worn out upper journal housing Released from Unit I to IV Mills
Supply of Morpholine
MTPS I Mill Plant Unit II Cutting removing of existing worn out mill separator body curved liners and erection of new MS liners in Mill 2A to 2F during COH 2024 25
MTPS I Mill Plant Unit IV Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft renewal of worm gear hub in any one mill from 4A to 4F Tilt
Salem District - P.N.Palayam Block - Strengthening the Road from Vengayakurichi to Kuppur Road C.K.Hills Therkunadu Panchayat at Savings Fund - 2025-2026 Package No.06-2025-2026.
MTPS I Mill Plant Unit II Changing of coal pipe with collar at various location in the coal pipe lines during Capital Overhaul 2024 25
MTPS I Mill Plant Unit II Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4.5 mtr 18 mtr level Renewal of eroded worn out Expansion Joint Welding of eroded 2C 2E 2F and worn out portion of hot air
MTPS I Mill Plant Unit II Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos
Entry and Mid Level Desktop Computer (Q2)
Computer Printer (V2) (Q2)
Improvements to the existing raw water supply Infrastructure and 7.50 MLD Seethamalai in Mettur Municipality
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Supply and fixing of LED Street Lights in Mettur Municipality
Operation and Maintanence for old Scheme
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Labour for operation and maintanence for water supply distribution pipe line and head works at New Imptovements Scheme for Six Months
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
Computer Printer (V2) (Q2)
MTPS I Mill Plant Unit II Dismantling of seal air fan motor and overhauling reassembling setting the alignment of the motor with impeller Dismantling cleaning of seal air filters and strengthening of seal air filter frame assembly
MTPS I Mill Plant Unit II Replacement of the existing eroded feeder discharge chutes in Mill 2C to 2F during COH 2024 25
MTPS I Mill Plant AC Plant Unit II COH 2024 25 Air Washer System Epoxy painting of blowers, discharge duct spray system and air filter platform area replacing the damaged 200 NB GI header pipe vibration pads Overhauling the Blower 2
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Capital overhaul 2024 25
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 11 10 to suit 508 mm 12 7 mm thick coal pipe line during COH 2024 25