4,015 results • Latest
MTPS I BM Pressure parts Units III and IV Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
MTPS I CA RWS Misc Clarifier I De watering sludge removal cleaning of complete clarifier with bleaching powder overhauling of flocculator and traction drive mechanism strengthening of corroded portion of the structures etc
MTPS I BM Lift Preventive Breakdown maintenance of 3 Nos Freight cum Passenger lifts Boiler Lift I Boiler Lift IV and VIP Lift II of MTPS I for the period of one year from the date of commencement of work
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 4 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in CT II
MTPS I BM DM Plant and Lift Load Test certification of 1 Ton Capacity Chain pulley blocks 6 Nos at DM Plant stage I and II and Load test Certification of VIP Lift I II and Boiler Lift I to IV
MTPS I CA RWS Overhauling of Raw Water Pump No 04 and its butterfly valve Reconditioning of trash rack gates at Raw water pump house
MTPS I M I CA CWS I Fabrication of sun shield roof structure for replacing a portion of damaged Corroded sun shield roof structure and its doors provided over hot water basin on the eastern side of Cooling Tower II during COH 24 25 of Unit II
MTPS I BM Unit II COH 2024 25 ID fan 2A Reconditioning of the eroded discharge spiral portion in the ID fan top casing renewal of casing wear liner and other related works
MTPS I BM Unit II COH 2024 25 Replacement of the worn out Impeller wear liner plates and other related works in ID fan 2A including cost of impeller wear liner plate 1 set
MTPS I M I CA CWS II Complete dismantling inspection Overhaul including renewal of wornout pump components and assembling in any 2 Nos of CWP in stage II
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 5 Nos including static balancing of fan blades painting of gear box fan blades hub and arm sleeves etc in Cooling Tower Stage II
SMS PROFIBUS ADAPTER– CRANE DRIVES
RTAC-01 PULSE ENCODER ENTREFACE
HRM-SERVO VALVE 6 PIN CONNECTOR, HRM-SERVO VALVE 4 PIN CONNECTOR, HRM-SOLENOID VALVE 4 PIN CONNECTOR
MTPS I CA RWS De watering sludge removal cleaning of clarifier with bleaching powder complete overhauling of flocculator drive mechanism strengthening of corroded portion of structure etc
ANNUAL MAINTENANCE AND OPERATIONAL CONTRACT (AMOC) FOR WATER RECYCLING PLANT AT SA,ED,KRR,TUP,MTP & DRM'S OFFICE AT SA FOR TWO YEARS
WELDG. HEAD ROTOR/CONT. ELE. MECHWELDR, CURRENT COLLECTOR FR WELDNG. HD. ROTR
MTPS I Mill Plant Unit I Overhaul of hot air dampers cold air dampers cold air gates hot air gate power cylinder Renewal of hot air gate seal during Annual over hauling of 2025 26
MTPS I Mill Plant Unit I Dismantling the eroded 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system
MTPS I Mill Plant Unit I Fabrication of MS bend 10 deg 15 deg 22 deg to suit 508 mm 12 70 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit I Dismantling hard facing and assembling of 1 meter length coal pipes after MOE mill outlet elbow in Mill 1A to 1F during Annual overhaul 2025 26
MTPSI Mill Plant Unit I Overhauling of classifier assemblies Replacement Repairing of eroded inner cone inner cone drum section Venture vanes venturi Collars during AOH 2025 26
MTPS I Mill Plant Unit I Removal of accumulated ash from the horizontal portions of the mill inlet hot air duct at 4 5 mtr 18 mtr level Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in Mill 2E
MTPS I Mill Plant Unit I Removal of worn out thinned out wall plates of coal bunkers 1D 1E 1F and erection of new wall plates of 12 mm thick MS plates and supporting beams and other related works
MTPSI Mill Plant Unit I Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during Annual overhaul 2025 26
MTPSI Mill Plant Unit I Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
Mill Plant Unit I Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 1A to 1F
MTPS I Mill Plant Unit I Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos
MTPSI Mill Plant Unit III Coal flow system to boiler Removing the existing dislocated coal pipe lines at both left and right sides of the Boilers up to boiler at 16 meter level and re assembling the same after rectification of the pipes coal bend
315311040032 3 4 20mm CPVC PIPE SDR11, 315311040033 1 25MM CPVC PIPE SDR11, 315311040034 11 4 32MM CPVC PIPE SDR11, 315311040035 11 2 40MM CPVC PIPE SDR11, 315311040036 2 50MM CPVC PIPE SDR11
ARMOURD 6C FIBRE OPTIC CABLE
23watts LED LAMP 17 ITEMS
REMOTE SEAL PRESRE TRANSMITR 0-10BAR
MTPS I TM Unit III Replacing the existing defective vent condenser tube nest by spare tube nest in Unit III during 2025 26
MTPS I TM Unit II Renewal of Gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of LPH 2 3 4 GC 1 Ejector 2A Vent condenser and Renewal of Gasket at Deaerator main
MTPSI TM Unit II Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drier accessories
Procurement of 1.5 ton Split Air Conditioner Indoor Unit (3 star) 15 Nos and Outdoor Unit (3 star) 10 Nos
FIRE CONTROLLER PANEL & LHD CABLE
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing, worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft and its bearings etc in Coal Mill 3F Tilting
MTPS I Mill Plant Unit III Complete dismantling and reassembling of bowl assembly worm gear housing worm wheel mill bottom insulation cover plates broken main vertical shaft renewal of vertical shaft its bearings in Coal Mill 3A Tilting work
MTPSI TM Unit II Overhauling of Beacon Rotork Ind modact actuator with Renewal of oil seals O rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during Unit II AOH 2025 26
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3E 3F and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS1 TM Unit II Overhauling of OLCTC System Pump LHS RHS Overhauling 1600 mm Butterfly valve and its actuator gear box of cooling water inlet and outlet pipe lines in condenser Inspection Cleaning of Condenser CW box steam side Hot well
Procurement of 1.5 Ton Split air conditioner unit including copper condenser with given accessories - 8Nos.
MTPS I Mill Plant Unit III Removal of worn out thinned out wall plates of bunkers 3A 3B and 3C and erection of new wall plates of 12 16 mm thick MS plates and supporting beams and other related works
MTPS I TM UNIT III Changing the defective BFP 3B discharge NRV as per IBR specification by IBR welding and replacement of the defective BFP Suction valve 3B changing the eroded drip line reducers expanders and changing the defective eroded plug broke
MTPS I TM Unit III Overhauling and gasket renewing of Valves in Feed Water Main Condensate Heater drain drain water and Auxiliary Steam during Unit III AOH 2025 26
MTPS I Mill Plant Centralised AC Plant Attending Breakdown works in AC Compressor No 2 and 3 AC Cooling tower fans Air handling units Air washer system Circulating water pumps pipe lines and valves etc for a period of 365 days