MTPS I BM Unit I Removal of deteriorated and dislodged insulation and re insulation with new insulation materials on the top and bottom Portion of FG duct from mill bay outlet to ESP inlet and other related works
MTPS I BM Unit I AOH 2025 26 Replacement of the worn out shaft and other related works in PA fan 1A
MTPS I BM Unit I AOH 2025 26 FG Duct A and B sides Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints etc
MTPS I BM AOH 2025 26 Unit I Complete overhaul of APH A and B Sides and other related works
MTPS I BM Unit I Boiler pressure parts AOH 2025 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room and boiler roof area strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM AOH 2025 Unit I Boiler pressure parts Cutting and removing of heavily wornout rear arch room roof plate Supply fabrication and erection of HR Sheet at rear arch room and allied works
MTPS I BM AOH 2025 Unit I Boiler pressure parts Replacing overheated HRH stub bends and other circuit bends at penthouse area and allied works
MTPS I BM Unit I AOH 2025 26 Renewal Reconditioning of various Saw tooth expansion joints in FG ducts and Air ducts and other related works etc in both A and B sides
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger tubes steam cooled side walls and fin welding in boiler IInd pass area
MTPS I BM Unit I Annual overhauling 2025 26 Overhaul of ESP AB and CD pass Internals and related works
MTPS I BM Unit I Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate etc
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Overhauling of HP LP valves and replacement of defective valves
MTPS I BM Unit I Fabrication of HRH header bends and coil circuit bends at pent house area for AOH 2025
MTPS I BM Unit I Rotating parts AOH 2025 26 Overhauling reconditioning of CERM and EERM gear boxes ID PA FD fans gate actuators and other related works etc
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and Wornout square coal nozzle tips including SS309 plates and checking of deformation and matching with nozzle
Supply, Installation and Commissioning of various sizes of Electro Magnetic Flow Meters at ETP pipelines in MTPS II along with the computer recording arrangements in the already existing Client side Software for Data Acquisition System of MTPS II
Supply of Fire Hoses 2 Items
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
MTPS I Mill Plant Unit IV Renewal of eroded worn out Expansion Joints 4D 4E 4F and providing guard plates for the expansion joints and providing insulation for expansion joint areas of mills 4D 4E 4F during Annual overhaul 2025 26
Providing Modular OT PCGI Seamless Panel arrangements for Broad Speciality Block at MGMGH at Trichy in Trichy District. (Second call)
BALL VALVE FOR NITRIC ACID
MTPS I Mill Plant Unit IV Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills in Mill 4A to 4F during AOH 2025 26
Arresting hot air leakages of damaged or worn out hot air duct of coal mills
MTPSI Mill Plant Unit IV Dismantling hard facing and assembling of 1 meter length coal pipes after MOE Mill Outlet Elbow in Coal Mill 4A to 4F during Annual Overhaul 2025 26
Entry and Mid Level Desktop Computer (Q2)
Custom Bid for Services - BREAKING OF FeCr LUMPS 6000 MT Similar Category Support Services
MTPS I BM Unit III FG Duct A and B sides Renewal of deflector plates renewal of duct supports renewal of guard plates over expansion joints between APH outlet to ESP inlet during 2025 26
Supply of Spare relays for Generator relay panels
MTPS I BM Unit III Boiler Pressure parts Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I BM Unit I Rotating parts Annual Maintenance 2025 26 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
MTPS I CA CWS II Unit III Overhauling of Flow Control Valve complete assembly and renewal of its worn out components in Cooling Tower III
MTPS I CA CWS II Unit III De watering complete cleaning sludge removal cleaning with bleaching powder painting the structure of Clarifier III dismantling of damaged sun shield roofing sheets etc
Civil Contruction Building for 5Kl BMC Capacity in Nathakkarai MPCS, Salem
Providing B.T.Road and Construction of Drain with Culvert at Ward No.14 Amman Nagar Cross Street in Omalur Town Panchayat
Formation of Bypass to Athur town Km.4/4-7/2 including junction improvements, Construction of Minor Bridges, Cross drainage works and Protective works.
Formation of Bypass to Athur town Km.0/0-4/4 including junction improvements, Construction of Minor Bridges, Cross drainage works and Protective works.
MTPS I MM C I Supply of Power supply unit with programmable interfacing display unit
MTPS I Mill Plant Unit IV Removal of accumulated ash from the horizontal portions of the mill inlet hot air ducts at 45mtr level 18mtr level and providing insulation for PA inlet hot air duct to mill for mills 4A to 4F during overhaul 2025
MTPS I Mill Plant Unit IV Reconditioning the eroded worn out Patch welded areas of Mill outlet elbow MOE removing the eroded worn out portion of the released MOE by gas cutting and preparation of new coal pipes M S plates to the required
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes to Boiler corner 1 to Corner 4 for 180 deg rotating at 16 meter level near Boiler area during Annual overhaul 2025 26
MTPS I Mill Plant Unit IV Changing of coal pipe with collar at various location in the coal pipe lines during Annual Overhaul 2025 26
MTPS I Mill Plant Unit IV Hard facing of vertical coal pipe mtr length after Transition piece 24Nos in Mill 4A to Mill 4F during Annual overhaul 2025 26
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Diploma; Others
MTPS I BM Unit I Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes etc
MTPS I BM Unit I Annual maintenance 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I Mill Plant Unit IV Coal flow system to boiler Rotating the existing eroded straight coal pipes of mills 4A 4B 4C 4D 4E 4F for 180 rotation at 16 meter level above the mill and below the 18 meter floor and Dismantling rectification
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Maintenance of Burners and replacement of worn out fasteners at cover plates
MTPS I CA CWS I Overhauling of 1600 mm BFV including actuator GB overhauling checking and renewal of Nitrile rubber seal painting of Intake screen of Cooling water Pumps 1A 1B and 1C and allied works
MTPS I CA CWS I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2025 2026 of Unit I