MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective Boiler tubes in 9th header and Economizer Coils at Boiler IInd pass area and Radiography testing of welded joints
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective rear arch goose neck bends tubes and allied works
Diethyl Phenyl Acetamide 50% (DEPA 50%) - Defence (Q3)
MTPS I BM Unit IV Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
e-Tender procurement for the supply of Seal runner suitable for XRP 803 Mills - 12Sets as per Annexure furnished
MTPS I BM Unit IV AOH 2025 26 A and B stream Boiler PA fans FD Fans ID Fans and its isolation dampers and APH gear box
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area etc
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
e-Tender invitation for the supply of Dust guard and Thrust bearing adopter with shim for XRP 803 mills - 2 items as per annexure furnished
MTPS I BM Unit IV Rotating parts AOH 2025 26 Removal and renewal of insulation in FG ducts Air Ducts and Air Pre Heaters
E-tender procurement for the supply of spares for Gravimetric feeders as per Annexure furnished
MTPS I BM Unit IV Boiler AOH 2025 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPS I Mill Plant Unit II Renewal of eroded worn out Expansion Joint 2A 2B 2D Welding of eroded and worn out portion of hot air duct joints and providing guard plates for the expansion joints and providing insulation for PA inlet duct to mill
MTPS I Mill Plant Unit II Dismantling of existing elliptical feeder discharge chutes mill 2A 2B reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc in coal mill 2A to 2F during Annual overhaul 2025 26
MTPS I Mill Plant Unit II Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge chute platforms coal pipes mill floor and mill gearbox
Food grade sanitizers (Q3)
MTPS I Mill Plant Unit II Dismantling and assembling of fuel inlet Elbows and Hard facing of Fuel inlet Elbows long and short during AOH 2025 26
Diethyl Phenyl Acetamide 50% (DEPA 50%) - Defence (Q3)
MTPS I Mill Plant Unit II Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit II during Annual overhaul 2025 26
LINING ANCHOR INCONEL 601, ANCHOR PIN FOR RHF - INCONEL 601
MTPS I Mill Plant II Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc in Mills 2A to 2F during AOH
MTPS I Mill Plant Unit II Overhauling of classifier assemblies Replacement Repairing of inner cone inner cone drum section Venture vanes venturi Collars and overhauling of spring compression assembly in Mill 2A to 2F during AOH 2025 26
MTPS I Mill Plant Unit II Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills 2A to 2F during AOH 2025 26
MTPS I Mill Plant Unit II Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 2A to 2F and Dismantling of seal air fan motor and overhauling reassembling setting the alignment
MTPS I Mill Plant Unit III Overhauling of tramp iron chute knife edge gate Valves Strengthening of reject chute mouth area at under bowl and repairing the cracks of tramp iron chute outside the mill base of mills Renewal of the worn out Mill
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipes with bends and renewal of eroded pipes of length at about 15mtr length along with bends between Mill Outlet Elbow and Fuel Inlet Elbow during AOH 2025 26
Diethyl Phenyl Acetamide 50% (DEPA 50%) - Defence (Q3)
Food grade sanitizers (Q3)
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MTPS I Mill Plant Unit II Dismantling and assembling of Coal pipe bends and Patch welding the eroded portions of Coal bends pipelines between Mill Outlet Elbow and Fuel Inlet Elbow during Annual overhaul 2025 26
MTPS I Mill Plant Unit II Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 deg 11 deg 10 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit II Dismantling the eroded 90 degree Ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during AOH 2025
MTPS I Mill Plant Unit III Dismantling of existing elliptical feeder discharge chutes mill 3A 3B reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2025 26
MTPS I Mill Plant Unit III Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in any one Mill 3A 3B 3C 3F Tiltin
MTPS I Mill Plant Unit III Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor
MTPS I Mill Plant Unit III Fabrication of various length of dia 40 NB cooling water pipe line with flanges and assembling in the cooler cover of mill 3A 3B 3C 3F and Dismantling of seal air fan motor
MTPS I Mill Plant Unit III Overhauling of classifier assemblies Replacement Repairing of eroded inner cone inner cone drum section Venture vanes venturi Collars during AOH 2025 26
MTPS I Mill Plant Unit III Dismantling the damaged Mill outlet Elbows Orifices Transition pieces fabrication of spool pieces Mill port outlet 90deg bend and renewing with new from Coal mill outlet up to Mill floor in coal mill 3A 3B 3C 3F
MTPS I Mill Plant Unit II Removal of worn out thinned out wall plates of bunkers 2A 2D 2E and erection of new wall plates of 12 mm thick MS plates and supporting beams and other related works
MTPS I Mill Plant Unit II Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one Mills 2A to 2D 2F
MTPS I Mill Plant Unit IV Reconditioning of released SS elliptical feeder discharge chutes released from Unit II Unit IV
MTPS I Mill Plant Unit IV Dismantling and Replacement of worn out damaged skirt board assembly with new one old dismantling re assembling the coal flow control plate measuring the gap between the coal flow control plate
MTPS I Mill Plant Unit IV Dismantling and assembling of Coal pipes with bends and releasing bends for reconditioning of the eroded portion and patch welding of coal bends Coal pipes and renewal of eroded pipes of length at about 15mtr length
MTPS I Mill Plant A C Plant Unit IV AOH 2025 26 Air Washer System Epoxy painting of blowers and its auxiliaries enamel painting of AWCW Pumps pipe lines Spray nozzles flushing works renewal of bellows in discharge ducts W type eliminator
MTPS I Mill Plant Unit IV Replacement of the existing eroded feeder Center feed pipe by released pipe in Mill 4A to 4D during AOH 2025 26
MTPS I Mill Plant Unit IV Overhauling of classifier assemblies Replacement Repairing of inner cone inner cone drum section Venture vanes venturi Collars and overhauling of spring compression assembly in Mill 4A to 4F during AOH 2025 26
Contract for Transportation of equipment of electric locomotives based at Electric Loco Shed, Southern Railway, Salem Division, Erode.
Works contract for Reconditioning of Smoothing Reactor (SL-30) of electric locomotives available at Electric Loco Shed, Southern Railway, Salem Division, Erode.