MTPS I CA CWS I Renewal of the existing damaged PVC fills with new fills rearranging the hanging fills along with SS GRP grid in Cooling Tower I during AOH 2025 2026 of Unit I
MTPS I Mill Plant Unit IV Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc in mill 4A to 4F during AOH 2025 26
MTPS I CA CWS I Fabrication of Stop Log gate 2 Nos to provide in outlet canal of Unit I Cooling tower
MTPSI CA CWS II Unit III Fabrication Erection of Cooling Tower ID fan 1 gear box base frame channel base plate and its auxiliaries in CT III
MTPS I M I Circle CA Fire Protection Checking of Deluge valves Cleaning of spray nozzles in Emulsifyre System of GTs UATs MOTs COTs and DOTs of Unit I to IV etc
MTPS I M I CA CWS I Replacement of Corroded worn out GI safety hand rails toe guards and safety grills inside CT ID fan stack area and allied works
MTPS I M I CA CWS I De watering complete cleaning and sludge removal Cleaning with bleaching powder painting the structure of Clarifier I and replacement of corroded raw water inlet pipe line of Clarifier I
MTPS I M I CA CWS I Overhauling of sludge disposal pump and Cold and hot water tunnel vent valves Air Vent valves gate valves including Painting of CT safety grills etc
MTPS I MI CA CWS I Cooling Tower I Overhauling of Flow Control Valves and including reconditioning of worn out spares during AOH 2025 2026 of Unit I
MTPS I Mill Plant Unit IV Applying two layers ceramic wear coat Eromat at mill outlet elbows Ceramic 90deg bends 75 deg Ceralin bends Ceralin 60 deg bends 45 deg Ceralin bends and Multiple port outlet are released from Unit IV during AOH
MTPS I M I CA CWS I Overhauling of Traction drive and flocculator drive Gear Box in Clarifier I during AOH 2025 26 of Unit I
MTPS I BM Unit I Boiler AOH 2025 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for one year from the date of commencement of works for 2025 26
MTPS I Mill Plant Unit IV Dismantling of Fuel inlet elbow short Fuel inlet elbows long renewal of eroded FIE short Hard facing of released Fuel inlet Elbows long short and then assembling of fuel inlet Elbows during Annual overhaul 2025 26
MTPS I CA CWS II Complete Overhauling of 10 Ton monorail crane Load testing of 15 Ton monorail crane 1 No 10 Ton monorail crane 1 No 2 Ton Electrical wire rope hoist 2 Nos etc
MTPS I Mill Plant Unit IV Dismantling the eroded 90degree Ceralin coal bends from coal pipe lines and reconditioning the released one and then assembling the reconditioned bends in an appropriate manner in the coal flow system during Annual overhaul
MTPS I BM DM Plant Overhauling of Boiler Fill Pumps Hot well make up Pumps Effluent Water Transfer Pumps Degassed Water Transfer Pumps DM Water Transfer Pumps Stator Water Pumps Acid and Alkali unloading pumps in DM Plant Stage I and II and CST
MTPS I BM Unit I Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
MTPS I Mill Plant UNIT IV Overhauling of gravimetric feeders and Clean out conveyor and cleaning clearing the coal dust and ash deposited from bunker platforms feeder floor feeder discharge platforms coal pipes mill floor and mill gearbox of mill 4A
MTPS I BM Unit I Boiler pressure parts AOH 2025 Dismantling cleaning and rectification of defective seal trough seal plates SS woven wire mesh providing patch plate
MTPS I Mill Plant Unit IV Patch Welding of eroded portion of Hot Air ducts 4A to 4F worn out portion of hot air duct joints and providing guard plates for the expansion joint areas of hot air ducts 4A 4B 4C during overhaul 2025 26
MTPS I BM Unit I Boiler pressure parts AOH 2025 Erection and operation of sky climbers for assisting various maintenance works and dismantling of sky climbers
MTPS I Mill Plant Unit IV Overhauling load testing and certifying of lifting tools and movable trolleys
MTPS I BM Servicing of sky climber drive and its auxiliaries Reconditioning of sky climber bed and platform materials and Overhauling of gear box assemblies etc for the Year 2025
MTPS I BM Unit I AOH 2025 26 Cutting and Patch welding on the eroded portion of the FG duct from ECO outlet to APH inlet renewal of Support Beam both inlet and allied works
MTPS I M I CA CWS II Unit III and IV Strengthening of most eroded corroded portion of Cooling Tower ID Fan gear box base bed frame in Cooling Tower III and IV
MTPS I CA CWS II Unit III Replacement of Eroded Corroded Safety grill Hand rails and painting in Cooling Tower III
MTPS I M I CA CWS II Unit III Fabrication and erection of sun shield monitor roofing structure with roofing sheets for replacing the damaged Corroded roofing structure with sheets etc
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work for the year 2025 26
MTPS I Mill Plant Unit IV Hard facing of MS bend and multiple port outlets in coal flow lines Fabrication of MS bend 15 22 deg to suit dia 508 mm 12 7 mm thick coal pipe line during AOH 2025 26
MTPS I Mill Plant Unit IV Inspection and renewal of eroded 08Nos of orifices dia 415 mm 02 Nos dia 406mm 01No dia 400mm 02Nos dia 410mm 02Nos dia 396mm 01No in the coal pipe line of coal flow system at boiler side 08 Locations
MTPS I Mill Plant Unit I Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in Mill 1F
MTPS I Mill Plant Unit I Dismantling of existing elliptical feeder discharge chutes mill 1B 1C 1F reconditioning of released SS elliptical feeder discharge chutes and reassembling the same during AOH 2025 26
MTPS I Mill Plant Unit IV Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in 4A to 4F
MTPS I Mill Plant Unit I Overhauling load testing and certifying of lifting tackles and movable trolleys
MTPS I Mill Plant Unit I Complete dismantling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub Mill bottom etc in Mill 1A
MTPSI Mill Plant Unit II Reconditioning worn out of head Pulleys of 36 Gravimetric Feeders from Unit I to IV
MTPS 1 Mill Plant AC Plant Overhauling load testing and re commissioning of 3 Ton capacity EOT crane and load testing of electrical hoist 1 Ton capacity in Air washer system unit 1 to unit 4
MTPS I Mill Plant Unit I Applying two layers ceramic wear coat Eromat at mill outlet elbow released from Unit I during Annual overhaul 2025 26
MTPS I Mill Plant Unit I Clearing the Mill rejects from Unit I and II Mill Feeder area weighing in departmental weighbridge and transporting to reject yard G switch yard area coal yard by using contractors vehicle and unloading the same and return
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and wornout coal nozzles fixing of divider plates and allied works
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Reconditioning and Hard facing of used and worn out square coal nozzle tips and checking of deformation and matching with nozzle
MTPS I Boiler Rotating parts Units III and IV Preventive and Breakdown maintenance Works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
A4 and Legal Size Multifunction Printer (MFP) (Q2), Computer Printer (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
MTPS I CA RWS Load testing of Hoist and Cranes in Raw water system sub division for the year 2025 2026
MTPS I CA CWS I Load testing of 10 Ton Electrical hoist 1 No 15 Ton Electrical hoist 1 No 30 Ton EOT crane 1 No and revisioning of brake assemblies with thruster units and allied works
MTPS I BM Pressure parts Units I and II Boiler Preventive Breakdown maintenance of Boiler Pressure Parts HP LP Valves Burner tilt mechanism oil gun cleaning soot blower operation cleaning and allied works
MTPS I M I Circle CA FP Replacement of worn out puncture Headers pipelines in Hydrant Emulsifyre system by dismantling and erection of various sizes pipelines patch welding replacement of fire hydrant post removing of slabs and allied works
Entry and Mid Level Desktop Computer (Q2)
MTPS I CA CWS I Complete dismantling inspection Overhaul and renewal of pump components in 1 No Cooling Water Pump of capacity 16000 M3 Hr Single Stage VMF Model 1175 KW motor in stage I