Loading…
Loading…
2,032 live1,577 closing this weekmost from PWD and HP Irrigation and Public Health
2,032 results • Latest
C/O Plum concrete retaining wall approach road to STP Theog
Construction of Dawar at Jandrah Chowk in Tehsil Baroh, District Kangra (HP) Deposit work (SH-Construction of Civil work etc)
Restoration of rain damages on link road Chhughera Sadoon Khawa Kandi road in District Kangra (HP) Under PDNA2025 (SH- Providing and laying G-III and cement concrete pavement at RD 6/500 to 6/923) (4376-5)
Restoration of rain damages on link road Massal to Parmar Basti in Km 0/000 to 2/000 in District Kangra (HP) (SH-Construction of retaining wall and CC pavement in between Km at RD 0/765 to 2/000).(4332-1.1)
Dismantling and Demolishing work, Retrofitting work, finishing work and sanitary work
Construction of Indoor Stadium at GSSS Giabong in District Kinnaur ( HP) (SH- Building portion, WS and SI, Septic Tank and rain water harvesting Tank, site development and supplying and fixing Boxing Ring
Construction of Gate at Tharu on link road NH-154 to village Tharu in Tehsil Nagrota Bagwan District Kangra (HP) (SH-Construction of Gate at RD 0/000)
Construction of Auditorium-cum-Multipurpose Hall at Degree College Reckong Peo in District Kinnaur (HP) (SH- Balance work for building portion, including WS and SI, and site development
Restoration of rain damages on link road Aar Ustehar Nougaza Behra Banjar road in District Kangra (HP) (Under PDNA 2025) (SH-Providing and laying G-III and cement concrete pavement at RD 0/105 to 0/729.22(4386-1)
Repair and maintenance of link road Sakreh Mata Mandir in Distt Kangra (H.P.) Demand no 10 (SH-Construction of retaining wall in KM 0/255 to 0/283, 0/255 to 0/281 (L/S) , 0/305 to 0/330 (R/S and cement concrete pavement in Km 0/320 to 0/345).
RRD on Approach road B.S.L Colony to Chambi, jaidevi via jangam Baag road km. 0/00 to 0/900 (SH Providing and laying GSB layer with unlined drain at RD 0/070 to 0/135
P/F of copper cable 95 Sq mm for 200 HP and welding of pipe joints 80 mm dia in stage 1st
Restoration of rain damages on Nagrota Chahri Pathiar road 0/000 to 4/135 in District Kangra, Under PDNA 2025 (SH-Construction of Edge wall, U-shape drain and CC pavement in berms in between 1/030 to 1/150).
C/O Ambulance road from OBC Bank Sabzi mohalla to Jang Bhadur House at R/Peo Kn. 0/00 to 0/310 (SH- Providing Cement concrete pavement from Km. 0/00 to 0/240
SH Deployment of labour_staff for operation running and maintenance of 0.90 MLD capacity STP including sewerage network system to Kunihar area for a period of 18 Months
C/O Welcome Gate on Peo Karchham Shilti road Km. 0/00 to 11/635 (SH- Construction of Gate)
RRD on Chail Moviseri Road km 0/00 to 11/200 (SH C/o B/wall at RD 5/900 to 5/910, Edge wall at km. 7/800 to 7/810 and cutting 7/810 to 7/850)
Restoration of rain damages on Mumta Bhadrehar road in Km 0/000 to 1/852 in District Kangra (HP)(Under PDNA 2025) (SH-Construction of Breast wall with U-Shape Drain in Between at RD 0/800 to 0/920) (4442-2.1)
C/o Jeepable road from Labrang to Tapang Kanda Km. 0/00 to 7/00 (portion 0/00 to 2/900) (SH- Formation cutting from Km. 0/00 to 1/840 and providing protection work at various RDs
R/O rain damages on Bhini Johri Luns to Kharpana road in km 0/0 to 7/00 (SH C/O R/wall at RD 1/560 to 1/600).
Restoration of rain damages on link road Thana to Busal road in District Kangra (HP) (Under PDNA 2025) (SH-Construction of retaining all at RD 2/880 to 2/899.50) (L/side), CC pavement at RD 2/800 to 2/899.50 and U-shape drain at RD 2/850 to 2/899.50)
R/O rain damages on Bhini Johri Luns to Kharpana road in km 0/0 to 7/00 (SH C/O 900 mm dia NP-2 HPC at RD 3/600).
replacement of existing opening and closing oil pipelines of hydraulically operated gate valve installed in draft tube drain pipeline, from turbine floor to valve location along with its testing and successful commissioning at 3x42MW Larji Powerhouse
Connectivity of S/tank 115000 ltr cap at Galani (Kurpan Project) and L/J of GI pipe line 80 mm dia with butt welding stage 1st and 2nd
R/R damages on Dhaburghat Bagthan road Km 0/0 to 6/00 (SH- Providing and laying of interlocking paver blocks at RD 0/800 to 0/895)
SH Hiring of excavator cum loader Pock lane/L AND T ROFD between km 0/00 to 0/410)
R/R damages on Marighat Sultanpur road Km 0/0 to 16/00 (SH- C/O PCC R/wall at RD 1/720 to 1/740)
R/R damages on Jamun Ki Ser Harkaghat upto Ghalaghat road Km 0/0 to 11/00 (SH- Providing and laying of interlocking paver blocks at RD 0/800 to 0/895)
SH Hiring of excavator cum loader Pock lane/L and T ROFD between km 0/00 to 0/510
P/F cast iron sluice valve 80 mm dia, P/F of MS Grills, dismantling of GI pipe 80 mm dia and L/J in trenches GI pipe line 80 mm dia with butt welding in stage 1st
PROVN OF RETAINING WALL, WORK TO IMPROVE DRAIN, HARDSTANDING AND ADDN / ALTN FOR DIVERSION OF MS PIPE AT NAHAN UNDER GE CHANDIGARH
Construction of ORs cook house at Mastrang BOP of 2nd BN ITBP Kullu H.P
RRD on Gohar Neori km. 0/00 to 5/00 (SH C/o Extension of 900 mm Hume pipe culvert with wing wall at RD 0/580) Under PDNA(2023)
RRD on Shimla Mandi via Tattapani road km. 146/00 to 181/400(SH Providing and laying Hume pipe culvert with wing wall at RD 166/910)
R/R of damages on Mahasu Valley Road Km 0/00 to 11/00 P/L B.C in portion Bankufar to Halaila in Km 10/00 to 11/00
R/R of damages on Kotkhai Deorikhanety Deorighat Road Km 0/00 to 22/00 P/L B.C in Km 18/00 to 22/00
SDF/2024/1370 R/o Road Tugger to Lower Shilh km. 0/00 to 3/00 (SH C/o Hume Pipe culvert at RD 0.670 and Surface dressing of road at various RDs) Under Deposit
RRD on Shimla Mandi via tattapani road km. 146/00 to 181/400 (SH C/o PCC R/wall at RD 156/630 to 156/642)
RRD on Leyoti Gudhari road km. 0/00 to 2/300 (SH C/o PCC R/all with parapets at RD 1/350 to 1/358 and 1/425 to 1/437)
C/o Play field in the play ground of GSSS Killing Tehsil Chachiot Distt. Mandi HP (SH C/o Volleyball and badminton field using Red Stone etc.) Deposit work
Approach road to CHC Gumma in Tehsil Kotkhai Distt Shimla H.P in Km 0/00 to 0/190 P/L GSB and G II in Km 0/00 to 0/190
R/R of Damages on Link Road to Village Saintari in Km 0/00 to 0/300 P/L M/T Work portion Km 0/00 to 0/300
Building repair work
Upgradation of Unit Hospital at CTC SSB Sapri (HP). (SH: C/o 110 STP for 800 users). (SW:- Digital topographical survey with contour plan of SSB Campus at CTC, SSB Sapri, HP). Subwork/Packages: Digital topographical survey with contour plan of SSB Campus at CTC, SSB Sapri, (H.P).
Building Protion, W.S and S.I., Septic Tank, Rain Water Harvesting Tank, Boundary Wall, Site Development etc.) (Deposit Work) Part-II-Electrical Work- (SH Providing E.I. and Lift Therein