Loading…
Loading…
579 results • Best match
Appointment of Event Management Agency for providing concept design erection Production and management for the Inauguration of the New Terminal Building of Captain of Ports Department Panaji Goa
Local Language, Hindi Language, English Language, Frame Work, Providing and fixing of Aluminium composite panels ACP
Work of shifting 33 kV,11 KV, transformer centre and associated LT line as per request of EE, WD.VII(NH)in order to prepare DPR for construction of Link road to Mopa Airport under the jurisdiction of SDI, Div.XVII, Mapusa under civil aviation fund.
Work of erection of New 100 KVA Distribution Transformer Centre to release 59KW Load for EV Charging of M/s Adani Total Energies Ltd near Dabolim Airport bus parking in Shantinagar ,Vasco under the jurisdiction of S/D-I (U), Div XI,Vasco.
Work for providing earthing for the G.I Tubular Pole of National Highway Streetlight from Dabolim Airport to Valis Junction and single /three phase CCMS streetlight panel box in the jurisdiction of Dabolim Section Office of Sub-div-II(R), Div XI, Vas
Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Goa to Mopa Airport under CE CG Goa AOR 05 Trips, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Mopa Airport under CE CG Goa AOR to Goa 05 Trips, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Goa to Mangalore (Karnataka) under CE CG Goa AOR 01 Trip, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Mangalore (Karnataka) under CE CG Goa AOR to Goa 01 Trip, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Goa to Ratnagiri (Maharashtra) under CE CG Goa AOR 01 Trip, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Ratnagiri (Maharashtra) under CE CG Goa AOR to Goa 01 Trip, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Goa to Karwar (Karnataka) under CE CG Goa AOR 03 Trips, Short Term Cab & Taxi Hiring Services - Premium SUV; Outstation; From Karwar (Karnataka) under CE CG Goa AOR to Goa 03 Trips, Short Term Cab & Taxi Hiring Services - Premium SUV; Local; ocal use at 8 hours 80 Km/working day and other official duties as assigned by this HQ post office hours 10 days
AICMC of Set of 10 bollards, AICMC OF Set of 8 bollards, AICMC of Set of 7 bollards, one time overhauling replacement of bollards, AICMC for Set of 2 boom barrier
Modification of flooring at Ground floor Domestic and in concourse cityside of NITB
Modification to flooring in NITB
Installation and Implementation of In-Line X-BIS at Goa.
construction of footpath from NSD junction at Highway 17B to Jairamnagar road under AAIs policy in the jurisdiction of VP Chicalim
Provision of Tools and Plant SH Provision of Digital Portal Low Impedance equipment grounding lighting and surge suppressor for Vital NAV Aids
Provision of Paver Blocks near Gate No. 1 to relocate Porta Cabins for Airside Operations of Airlines, development near GSD Gate including drainage
Additional works construction of retaining wall car park road work and other miscellaneous development works CISF bachelor accommodation including electrical works at CE Goa SH Service Connection
Improvement of Air conditioning system at Domestic and International Departures. SH Improvement of Air conditioning at First Floor Pre Security Check area
Painting of Residential Quarters including Guest House Building,Community Hall and Power House and other buildings and installations located in AAI Residential colony at Goa
Balance work of Construction of CISF Barracks including Kote Armory Ammunition etc and Dog Kennel at CE Goa
AMC of Integrated Security and Surveillance System - Health Monitoring Solution for CCTV System; Comprehensive; Hardware, Software, Networking System, License; Consumables to be provided by Service Provider (included in the contract cost); Airports; ..
5.00-8, 7.00-12, Wheel-Puncture Proof Tyre, 8.25 R 15, 4.103.50-6, 4.80-4.00-8, 16X400X8.300, 16X4-8
Engine oil 15W40, Grade- CF4, Transmission oil- Automatic transmission fluid, Hydraulic Oil - Enklo 68, GEAR OIL- EP90, GEAR OIL- EP140, BRAKE OIL DOT 3, BRAKE OIL DOT 4
Work of shifting of HT and LT line along the proposed widening and hot mixing of road from, SH No.1 to Advalpal Pirna and from Menkurem to SH No.2 for Mopa Airport interconnectivity in the jurisdiction of SO Assnora, under Sub Div. I, Bicholim.
Onsite Calibration of Test Equipment at CNS, Goa lnternational Airport Dabolim, Goa - 403801. (Q3)
8649/E8
Public Wi-Fi Solution (Wi Fi as a Service-WaaS) implementation at AAI, Goa International Airport
8261/E8
8502/23/E8
8438/22/E8
8283/E8
8699/E8
SITC of NTP Server and GPS Clock
Replacement of Cassette Acs prov of split Acs water coolers
Laying of cables for standby pumps in HVAC Plant
Provision of Roll Carpets for Ramps of Aerobridge No. 6, 7 and 8
Additional works construction of Retaining wall car park road work and other Miscellaneous development works for CISF Bachelor accommodation at CE Goa
Please go through NIT document carefully. Submission of Bids automatically states acceptance of all NIT documents, annexures etc. Please go through NIT document carefully. Submission of Bids automatically states acceptance of all NIT documents, annexures etc. by the vendor.
REPAIRS TO JOINT FILLING ON CONCRETE SURFACES OF TAXI TRACKS AND DISPERSALS REPAIRS TO DISPERSAL ETC WITH ELESTOMERIC CONCRETE AT NORTH SIDE OF RUNWAY UNDER AGE BR I OF GE NW VASCO
8265/E8
8503/23/E8
8219/E8
8396/21/E8
8441/22/E8
8326/E8
Digital Storage Oscilloscope (Q3)
8521/E8
8379/E8
8311/E8
8395/21/E8
Executive Table (V3) (Q2) ( PAC Only ), Wooden Shelf Case/Rack/Credenza/Modular Storage (V2) (Q2) ( PAC Only ), Modular Table/Meeting Table/Centre Table (V2) (Q2) ( PAC Only ), Modular Extendable Conference Table (V2) (Q2) ( PAC Only ), Modular Work ... Area/ Airport Terminal/Public ...
8264/E8
8671/E8