Loading…
Loading…
2,182 results • Best match
FABRICATION & ERECTION OF IRON FOOT BRIDGE DURING DASARA -2023
Providing wiring and ceiling fans to Sarva darshan Q- line from Lepakshi circle to foot over bridge at SMC -211 of ESD-South, Tirumala
Construction of High Level Bridge on the road from Palakajeedi to Eedhulabanda in Koyyuru (M) of Visakhapatnam District
Construction of High Level Bridge on the road from Vemulapalem to Yerragonda in Koyyuru (M) of Visakhapatnam District
Construction of major bridge across papagni river including approaches at km. 153/2 of Renigunta Kadapa Muddanur Road NH716 in the State of Andhra Pradesh on EPC Mode
Special Repairs to Existing Foot Over Bridge over 9 IRSD Area Channel near Pallava Park and Provision of Storage Shed at CE Navy Complex, Visakhapatnam
Erection and removal of temporary foot over bridge for special arrangements in view of Vaikunta Ekadasi at Flour mill junction Tirumala for the year 2018
Construction of High Level Bridge across Suvarnamukhi river between Geddaluppi and Baggamdoravalasa Village in Seethanagaram mandal of Vizianagharam Dist.
Construction of High Level Bridge across Eluru Canal at Km 0/10 of Atkuru Unguturu Road In Krishna District
construction of High Level Bridge across Thadi vagu in Km 37/8 of Vijayawada - Nuzvidu road in Krishna District.
CONSTRUCTION OF HIGH LEVEL BRIDGE AT K.M.9/8-10 OF KURNOOL - SUNKESULA ROAD IN KURNOOL DISTRICT (3RD CALL)
Construction of High Level Bridge at Km 23/10 of Chitvel - Kodur road across Gunjana river in Kadapa District.
Construction of High Level Bridge across Eluru Canal at Km 0/10 of Atkuru Unguturu Road In Krishna District
Construction of High Level bridge on the road near Kumbidisingi @ 3/650 KM in G.Madugula (M) in ASR District
Engaging of Chain Mounted Machine to desilting of Thavvakaluva from Matchavari Palem to High Level Bridge in Bapatla Municipality
Construction of High Level Bridge at Km 18/4-8 of Kalikiri-Sadum road (Via) Palamanda in Chittoor District.
Urgent Repairs to High Level Bridge at Km 14/6 of Vakalapudi - Edatam Road (SH - 162) in Kakinada District
Preparation of DPR for Construction of High Level Bridge Across Ponnai River at BNR Peta of Chittoor Rural Mandal
Construction of High Level Bridge at Km 14/10 of Kalikiri-Sadum road (via) Palamanda road in Chittoor District
Construction of Foot Bridge at Km.151/000 of RBLLC.
Providing Steel foot bridge at Km 5.900 of Power Canal
Construction of Foot Bridge at Km.151/000 of RBLLC.
Construction of High Level Bridge(HLB) at km 3/6 10 of PRP road to Mopuridevalalu road (via) Nallacheruvupalli(KDMD 390) in YSR District and construction of High Level Bridge in km 0/2 to 2/0 of Kuppam Kalluripalli road in YSR District
Strengthening of 10 Nos Major Bridges i.e., Bridge No. 589, 590, 598, 611, 624, 649, 661, 655, 701, 836 DN Line (Composite Girder) on Raipur - Vizianagaram line under the jurisdiction of Assistant Divisional Engineer/Rayagada of Waltair Division.
Dismantling of Collapsed Steel Girder Bridge at Km 34/10 of Martair - mPrakkilanka Road in W.G.Dist.
Desiltation of drains from Girder Bridge to Bhupesh Nagar in ward no.29 (Reserved for society)
Replacement of Expansion joints in Road over bridge _ROB_ at Sullurupeta, Civil Works.
Preparation of DPR for restoration of steel girder bridge over western main canal Km 34/4 and Dismantling of Collapsed steel girder bridge at Km 34/10 o over Apporao channel of M.P road SH (022) in w.G.Dist
Construction of High level bridge at km 2/0 of Bobbilanka-Mirthipadu road in Seethanagaram mandal Estimate Rs.450.00 lakh
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS NAKKALA VAGU AT KM 9/4 OF ATMAKUR - HASANAPURAM ROAD IN SPSR NELLORE DISTRICT
Construction of High level bridge at Km 2/0 of bobbilanka-Mirthipadu road in Seethanagaram mandal estimate cost Rs450.00 lakh
Construction of High Level Bridge on the road from Vemulapalem to Yerragonda in Koyyuru (M) of Visakhapatnam District(4th call)
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS NAKKALA VAGU AT KM 9/4 OF ATMAKUR - HASANAPURAM ROAD IN SPSR NELLORE DISTRICT
Construction of High level bridge at Km 2/0 of bobbilanka-Mirthipadu road in Seethanagaram mandal estimate cost Rs450.00 lakh
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS NAKKALA VAGU AT KM 9/4 OF ATMAKUR - HASANAPURAM ROAD IN SPSR NELLORE DISTRICT
Construction of High Level Bridge across Vagu in the road from Sunnampadu to Nurupudi in Maredumilli (M) of A.S.R District.
Reconstruction of Foot bridge at Nalanda Nagar in Ward No.41
Reconstruction of Foot bridge at Nalanda Nagar in Ward No.41
Reconstruction of Foot bridge at Nalanda nagar in Ward No.41
Replacing the Existing pumping main from Old R & B Minor bridge to New Minor bridge at KM 108/6 Narsipatnam Bheemunipatnam road
Replacing the Existing pumping main from Old R & B Minor bridge to New Minor bridge at KM 108/6 Narsipatnam Bheemunipatnam road
Repairs and rehabilitation to existing Bowstring girder Bridge on the IBP Road in Western Sector(2nd call)
DPR For the Bridge work Construction of Bridge across Pedda Vagu on road from T0s Ullindakonda to Kodumur Veldurthy road (Via) Konganapadu (V)
S&T arrangements in connection with Provision of (1) 03 lifts for 12m FoB at ATP station. (2)03 lifts for old FoB at AD station.(3)3 lifts for New 12m FoB and 3 lifts for existing FOB at DHNE station.(4)two lifts for New 12m FoB at MALM station. ... existing FoB at ... 6m FoB and ... existing FOB at ... 12m FoB and ... existing FOB at ... existing FoB at ... existing FoB at ... existing FoB at ... existing FoB at ... 6m FoB & ... existing FOB at ... existing FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... 12m FoB at ... steel girder bridge with ... at RUB No.109A ... 12m FoB and ... Existing FOB atDMM ... 12m FoB at ... 12m FoB at
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:05). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast Supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between SIGADAM (SGDM-KM:785.00) excluding to KM:819.60 (including VIZIANAGARAM station) of Waltair Division in East Coast Railway.
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:03). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding Major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast Supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between Naupada Jn. (NWP-KM:702.20) excluding to KM:740.00 (including URLAM station) of Waltair Division in East Coast Railway.
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:04). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding Major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between URLAM (ULM-KM:740.00) excluding to KM:785.00 (including SIGADAM station) of Waltair Division in East Coast Railway.
Construction of High Level Bridge across Gadidala Vagu at Daida Village on the road from Gurazala to Samadanampeta of Gurazala (M).
Construction of High Level Bridge on the road from Palakajeedi to Edulabanda in Koyyuru (M) of Visakhapatnam (Now Alluri Sitaramaraju District)
Construction of High level bridge on the road from Chintalapudi to Kota @ Km8/500 of Y.Ramavaram (M) of Alluri Sitaramaraju District