Loading…
Loading…
1,411 results • Best match
STBR/RIDF-XXXI/DHAKUAKHANA 01/25 Construction of RCC Bridge No. 3/1 on road from Katharbari to Krishnapur under Mukhya Mantrir Unnata Paki Path Nirman Achani (MMUPPNA)under RIDF-XXXI of NABARD for the year 2025-26
SOPD(G)/2020-21/Morigaon/01 Construction of RCC Bridge No. 1/1 on Beloguri Jerengagaon Road with Road Part under SOPD(G) for the year 2020-21 under PWRD Morigaon District Territorial Road Division in Morigaon LAC
Borkhola/SIG/III/01 Improvement of road from Kishon Nath L.P. School to Bhangarpar via Rongghar ( in stretches )including construction of RCC Bridge over river Harang Along with approaches and protection works under signature Project (Uttaran)for the
Construction of ROB at 1st Km of Madhavpur Tippling Road at Railway Level Crossing Gate No ST 135
Operation and Routine Maintenance of 02 nos. Existing Passenger boarding bridges and 02 nos. VDGS/AVDGS at Dibrugarh Airport during Year 2025-28
Reconstruction of damaged railing and approaches of 12 nos of RCC Bridges over river Kollong under SOPD-G for the year 2025-26
CE/EAP/ARRBP/OCB/Bridge-1/Karbi-Anglong/16C Construction of Bridge in Karbi-Anglong district i) Br. No. 1/4 on Road from Rongkhelan Beltola to Kakoti Ronghang via Serlongjan
CE/EAP/ARRBP/OCB/Bridge-1/Karbi-Anglong/07 Construction of Bridge in Karbi Anglong district i) Br. No. 1/2 on NH-39 to RJ Road via Balipathar High School
Protection works of minor Bridge no.279, 328, 329, 332, 347 etc. involving rebuilding of damaged flooring, sump, Up- stream & down-stream channel, wing wall etc. in between NHGJ-CNE from KM 118/0 to 146/0 under the jurisdiction of Sr.DEN/III/LMG.
Package No. CE/EAP/ARRBP/OCB/Bridge-1/Udalguri/17 Construction of Bridge in Udalguri district i) Br. No. 1/1 on Road from Uttar Bokrajhar to Dakhin Bokrajhar over river Khulsi
Construction of Bridge in Biswanath district i) Br. No. 4/1 on Buroi TE 14 no Line to Behali Line Tiniali Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Biswanath/23
STBR/RIDF-XXXI/CHENGA-01/01 Construction of RCC Bridge No. 1/1 on Paharpur Bhairarpam Chari Ali under Mukhya Mantrir Unnata Paki Path Nirman Achani (MMUPPNA) under RIDF-XXXI of NABARD for the year 2025-26, Chenga LAC
MMPPNA_RIDF_XXXI_25_26_356 Construction of (I) road from Ganakpara Bartari road to Kardoiguri via Stadium (II) road from Cheki Mini PHC to Chaulabari (III) RCC bridge no 2/1 (18.75 m span) with approach at Bamakhata - Kordoiguri Road, (IV) RCC bridg
RIDF-XXVII/ Darrang/01 Construction of road from (1) Hirapara to Samala via Patidarrang, Kharkhowa Para (2) NH-15 to Sirakhowapara village (3) Matia Gohaighat Randhani satra road (4) Bherua RCC Bridge Uttar Bherua Lathapara connecting road (5) L.K.
MMPPNA_22_23_291 Construction of road from Balichapori Alengi villege Road to E and D including 1 No of RCC Bridge including routine maintenance for 4 (four) years under Mukhya Mantrir Pakhipath Nirman Aachani for the year 2022-23, Majuli LAC
SOPD_G_24_25_12 (i) Construction of RCC Bridge (Br. No. 1/1 over river Mazirkhal on Ujangram Buribail Ferrighat Road, (ii) Restoration of Sinking Damaged Stretch of Badshabari to Elgin Road at Ch.1620.00m to Ch.1720.00m, (iii) Improvement of approach
MMPPNA_22_23_06 Construction of road from (i) Algapur Narainpur PWD Road to Paulpara at Podmarpar via 354 No. Kunapara L.P. School Algapur Pt-1, (ii) RCC Bridge at Sayedbond Pt-III to Sangkuripar, (iii) Algapur Narainpur PWD Road to Karawalapar
RIDF-XXVII/Sonitpur/03 Construction of road from Borghuli to Koliabhata including RCC Bridge No.1/1 at Koliabhata under RIDF-XXVII of NABARD for the year 2021-22 under Tezpur, Sootea and Rangapara TR Divn under Rangapara LAC
SOPD(G)/2020-21/Morigaon/02 Construction of RCC Bridge No. 1/1 on Pachim Meruagaon Koroibari Road with Road Part under SOPD(G) for the year 2020-21 under PWRD Morigaon District Territorial Road Division in Morigaon LAC
Construction of ROB at LC gate No.- ST-5 at Km-8/2-3 on R.K. Choudhury- M.G. Road under Construction of ROBs on 50_50 Cost Sharing Basis
Construction of ROB in Replacement of Railway Level Crossing Gate No. FM-5 at Golaghat on Golaghat-Numaligarh Road under Construction of ROBs on 50_50 Cost Sharing Basis
FLYOVER/2 DD/AMOLAPATTY/DIBRUGARH/ASSAM Construction of Flyover at Amolapatty Junction on Old NH-37 in Dibrugarh District of Assam (ROB at LC Gate No. 2 DD)
CE/EAP/ARRBP/OCB/Bridge-1/Lakhimpur/12 Construction of Bridge in Lakhimpur district i. Br. No. 8/1 on Road from Moidomia to Panigaon Chariali via Hindu gaon, Khoga Road
CE/EAP/ARRBP/OCB/Bridge-1/Dhubri/07 Construction of Bridge in Dhubri district i) Br. No. 5/1 on 9th KM of GB Road to Materjhar via Lakura Pt-II
Construction of Lift/ Escalator and other ancillery works in connection with 12m wide FOB at Udaipur(UDPU), Dharmanagar (DMR), Kumarghat (KUGT) & New Haflong(NHLG) stations under Amrit Bharat Scheme in Lumding Division.
Construction of road from Bogamati to Bheragaon via Naobandha village in Udalguri District under NESIDS
Construction of road from NH 515 at Lakhi Nepali to Junkarong via Rayang Army camp under NESIDS
Improvement and upgradation of road from Rajagaon to Dalimbari in West Karbi Anglong District under NESIDS
H2 9320 000017 SHEET RUB SOLID BLACK 200CMX100CMX10.0M, G1 5340 000903 HINGES STEEL BUTT 50 MM, G1 5306 000657 BOLT ANF R STEEL HEXAGON HEAD ZINC COAT, G1 5340 000893 HINGES BRASS BUTT 25 MM, G1 5340 000894 HINGES BRASS BUTT 50MM, G1 5306 000739 BOLTS METRIC B S CUP HD SQ NECK U M HEX, G1 5306 000815 BOLTS MET B S HEX HD U M WITH HEX NUT FA, G1 5305 002728 SCREWS WOOD SLOTTED CSK HD MILD STEEL NO, CN 7350 000110 TIN MESS BODY OUTER, CN 7350 000109 TIN MESS BODY INNER, CN KND NIV CL 2 99 POUCHES AMMUNITION MODIFIED, CN 8105 000010 BAG LETTERS, CN 8465 000086 POUCHES BASIC WE PATT 1937, CN 8465 000675 WHISTLE BALL, CN 8465 000121 FROG WEB PLIER SIDE CUTTING, CN 8125 000657 WATER BOTTLE PLASTIC BODE WITHOUT COVER
MMNPPNA_24_25_09 (i) Strenghtening of Road from Govt. Girls HS School to DCs office via Railway field ( CH 0.00m to Ch 700.00m),(ii) Strenghtening of Haflong Mission Road (RCC Bridge to Haflong Jatinga Rd) ( CH 1500.00m to Ch 2300.00m), (iii) Constru
RIDF-XXIX/Tinsukia/02 Construction of RCC Bridge No. 1/1 on Itakhuli to 700 No Gate Road over River Tingrai under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NABARD for the year 2023-24, Tinsukia LAC
Package No. RIDI-XXIX/Dhubri/01 Construction of RCC Bridge No. 1/1 on 3rd km of BS Road to Chotogaraipar under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NABARD for the year 2023-24,Bilasipara Wes LAC
STBR/RIDF-XXXI/BIRSINGJARUA-01 09 Construction of RCC Bridge No. 1/1 on Baniapara Immersion Ghat to Hakama Pt-I_Naderalga road under Mukhya Mantrir Unnata Paki Path Nirman Achani (MMUPPNA) under RIDF-XXXI of NABARD for the year 2025 26
MLCSNA/ RIDF-XXV/KarbiAnglong /01 Construction of RCC Bridge No 75/1 over river Deopani on Dokmoka Angjokpani-kuthori Road under Mahavir LachitChilarai Setu Nirman Abhijan under RIDF-XXV of NABARD for the year 2019-20 under Kohora Road Division under
STBR/SOPD-G/Lakhipur-01 Repair and Rehabilitation of RCC Bridge No. 1/1 over river Chiri on NH37 at Palorbond to Lakhipur under SOPD-G for the year 2024-25 under PWRD Lakhipur Civil Sub-Division Territorial Road Division
Maint/MMPPNA/262 Construction of Road from PMGY Road St from Golibandha Mohan bazar road Guma centre to mazam bazar with unni Jan RCC bridge at kawaimari 1 no block,Ata Bhowkamari road to Madhya Bhowkamari via Medical ,Helocharpam to Nasatra
Balance Work for construction of Mahmora Ali with RCC Bridge No 9/2 at 9th KM in Charaideo District under RIDF-XXVIII of NABARD for the year 2022-23 in PWRD Charaideo District Territorial Road Division, Sonari under Mahmora LAC
STBR/MLCSNA/SOPD G/Barhampur/Beautification/01 Construction of RCC Bridge No. 26/1 over river Kapili at Kampur on Nagaon Kampur Baithalangso Road under Mahabir Lachit Chilarai Setu Nirman Abhijan (MLCSNA) under SOPD-G for the year 2018 19
Reconstruction of road from Kasakhaity 10 No. ward to Solmari RCC Bridge (Pub Singimari P-I to Pachim Singimari P-III), (Solmari to Pachim Singimari) under SOPD-G for the year 2025-26 under Kaliabor and Samaguri Territorial Road Division
MMPPNA_23_24_84 1. Construction of Road from Burtoll TE to Fagubaba Mandir via Burtoll Field and thailoo Boro line, 2.Construction of Road from NH37 to Machpara, 3.Construction of Road from RCC Bridge on Shibpur Lakhipur Road to Borbil (Razagram)
STBR/RIDF-XXX/Mangaldai/01 Construction of Ramhari to Salinikuchi Road including RCC Bridge No. 1/1 under Mukhya Mantrir Unnoto Paki Path Nirman Aachoni under RIDF-XXX for the year 2024-25 in Mangaldai, Dalgaon and Sipajhar TRD, PWRD, Mangaldai
MLCSNA/RIDF-XXV/Charaideo/03 Construction of RCC Bridge No 4/1 (Span-14.50m)on Dhuniapather Road including approaches and protection works under Mahavir Lachit Chilarai Setu Nirman Abhijan under RIDF-XXV of NABARD for the year 2019-20 under Sonari
RIDF-XXVII/ Dibrugarh/04 Cosntruction of RCC Bridge No.5/1 on Dhariatali to NH-37 via Kathgaon road under RIDF-XXVII of NABARD for the year 2021-22 in PWRD, Dibrugarh, Lahowal, Moran and Tingkhong Territorial Road Division, Lahowal LAC
RIDF-XXVII/Golaghat/02 Cosntruction of RCC Bridge No.1/1 over river Dighalpani on Baliachapori-Sapekhaiti road including approches work (L 18.75m) under RIDF-XXVII of NABARD for the year 2021-22 in PWD Golaghat and Khumtai Territorial road Division
RIDF-XXVII/ Baksa /04 Construction of RCC Bridge No. 1/1 on road from NH-127-A to Udalguri via No. 1 Koklabari village Over River Pota under RIDF-XXVII of NABARD for the year 2021-22 in Baksa District
RIDF-XXVII/Cachar/04 Construction of RCC Bridge over Badri River at Nawagram via Badripar PWD Road including approaches and protection works under RIDF-XXVII of NABARD for the year 2021-22 within Cachar District under PWD Dholai and Sonai Territori
RIDF-XXVII/Golaghat/03 Cosntruction of RCC Bridge No.1/1 over River Dighalganja on Dighalganja Road including Approaches work under RIDF-XXVII of NABARD for the year 2021-22 in PWD Golaghat and Khumtai Territorial road Division (L 18.75m)
BADP_Katigorah_17_18_01 Construction of Road from Saraspur to Leverputa Pt-II via Khelma Pt-III including 2 Nos of RCC Bridge over Gumrah River and Allarang Nalah Box Culvert (2.00m) for development of model village Khelma Pt-II under BADP for the
SOPD_G_20_21_36 Improvement and Widening of Road from Lampara at NH-37 to Paneri Industrial Growth Center via Andheritari Road including construction of a RCC Bridge and other CD works in Kamrup District under SOPD-(G) for the year 2020-21.
Package No. CE/EAP/ARRBP/OCB/Bridge-1/Kamrup/05A Construction of Bridge in Kamrup district i) Br. No. 1/1 on Bagals Road to Rangia Hajo road via Kanikuchi Nadipar suba Road