Loading…
Loading…
450 results • Best match
SITC of LED Street lights at proposed NH 49 (BTI Chauk to ROB Khoksa Chauk length 1400 Metre) at Janjgir, District -Janjgir-Champa (C.G.)
Strengthening work of Deokar Saja Khamhariya (MDR-414) Road Length 30.80 KM. Including Bridges & culverts at Distt.- Bemetara (C.G.)
NIT 190 Dated 24.07.2026 Construction of Bridge Across Kuyer Nala from Kerlapal Patelpara to Pongabheji road RD 7000 m., Length 24 mtr.
Custom Bid for Services - Mechanized excavation loading transportation and unloading of 5 Lakhs Tons of iron ore fines from Dep10 and11A fine ore stockpile LP and TechPro Siding LP to fine ore dump FOD through NMDC weigh bridges Similar Category Hiring of Special Purpose Mining or Earth Moving Machines (Monthly Basis) Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis)
Replacement of bridge timbers with galvanised H-Beam Sleepers onexisting 03 nos steel girder bridges of NTPC-Unchahar Railway siding
Construction of Retegaon to Muchar Road Length 3.00 K.M. I/c Bridges & Culverts at Distt.- Mohala-Manpur-Ambagarh Chowki (C.G.)
Construction of Ghodagaon to Anjari Road from km 1/2 to 5/6 =4.60 km i/c Culverts and Bridges.
Construction of Pidiya to Mirghotul Road Including 32 Nos Bridges & Culverts Block-Bijapur Distt.-Bijapur (C.G.) (0.00 to 20.00=20.00km)
Exploratory Boring work for Proposed Various Bridges at PWD Bridge Sub Division Rajnandgaon Under Bridge Division Durg Year 2026-27
EXPLORATORY BORING WORK FOR PROPOSED VARIOUS BRIDGES AT PWD BRIDGE SUB DIVISION KAWARDHA UNDER BRIDGE DIVISION DURG YEAR 2026-27
EXPLORATORY BORING WORK FOR PROPOSED VARIOUS BRIDGES AT PWD BRIDGE SUB DIVISION DURG UNDER BRIDGE DIVISION DURG YEAR 2026-27
Construction for Four Lane road Parikrama Path in Dongargarh Length 8.00 km I/c Bridges & Culverts at Distt. -Rajnandgaon (C.G.)
Job contract for monitoring/work assistance for ash utilization activities at Ash dyke, Fly ash silo, AU avenues and Weigh bridges.
Construction of Karamtara to Ghumarra Road Length 3.20 K.M. I/c Bridges & Culverts At Block Khairagarh Distt.-Khairagarh-Chhuikhadan- Gandai (C.G.)
Construction of Dongargarh Vipassana Kendra Approach Road (Pragyagiri Buddh Tirth) Length 1.00 KM I/c Bridges & Culverts at Distt.- Rajnandgaon (C.G.)
Construction of PV 15 to PV 124 Road from km. 1/2 To4/10 = 3.90 km i/c Culverts and Bridges.
Widening & Strengthening of Singhola to Khursipar Road Length 13 To 16 = 4.00 K.M. I/c Bridges & Culverts in Distt.- Rajnandgaon (C.G.)
Construction of Bharatpur to Ghoghara Road Lenght 3.50 K.M. including Bridges & culverts at Block Pandariya Distt.- Kabridham (C,G,) (C.C. Road)
Construction of Chulhapathra to Kariyatola Road Length 3.10 K.M. (Working Length 1.92 km) including Bridges & culverts at Distt.- Balod (C.G.) (CC Road)
Construction of Kongiyakala -Kongiyakhurd to Lolesara Approach Road Length 1.90 K.M. (Working Length 1.10 K.M.) including Bridges & culverts At Distt.- Bemetara (C.G.).
Widening & Strengthening of Bhilai Sirsa Aundhi Auri Motipur (MDR-108) Road Length 15.50 Km I/c Bridges & Culverts at Distt.- Durg (C.G.)
Construction of Strengthening of Kapsi to Paralkot Dam Road from km 1/2 to 10/10 = 9.83 Km i/c Culverts and Bridges.
Construction of PMGSY Road Via Dengurujam to Amaniya Road Length 3.20 K.M. including Bridges & culverts at Block Pandariya Distt.- Kabridham (C.G.) (CC Road)
NIT 1098 Consultancy Services for survey, Investigation, study & Preparation of structural design and DPR for Bridges PKG NO CGLSB Group 9- Ambikapur,Jashpur,
Execution of Earthwork in Formation Bridges P Way Linking work including supply of Track Ballast P Way Fittings Points and Crossings service building etc
Construction of Village Kurud to Chandulal Chandrakar Memorial Govt College & Medical Building Approach Road Length 1.35 K.M. including Bridges & culverts at Distt.- Durg (C.G.)
B.T. Renewal and Strengthening work of Narayanpur- Maro- Sambhalpur-Chirha- Umariya(MDR) Road Length 67.75 K.M. I/c Bridges & Culverts At Distt.- Bemetara (C.G.)
CONSTRUCTION OF GRAM PANCHYAT CHARAIDAND TO MALERIA BASTI TO NH-43 APPROCH ROAD LENGTH 1.90 KM I/C BRIDGES AND CULVERTS OF DISTRICT JASHPUR
Construction of Kaudikasa-Arajkund-Patan Road K.M. 8 to 25/8=17.80 K.M. I/c Bridges & Culverts at Distt.- Mohala-Manpur-Ambagarh Chowki (C.G.)
NIT 1098 Consultancy Services for survey, Investigation, study & Preparation of structural design and DPR for Bridges PKG NO CGLSB Group 2, Dist. Raipur, Durg
NIT 1098 Consultancy Services for survey, Investigation, study & Preparation of structural design and DPR for Bridges PKG NO CGLSB Group 10- Balrampur,Surajpur,Koriya,MCB.
Construction of Badekanera Naresh Poyam House To Dongriguda Road From Km 1/2 to 4/6 = Length 3.60 Km Inc Culvert and Bridges Work Code W29754
Construction of Four Lane Pulgaon Bridge (Main Road) to Anjora (Rasmada) Road SH. No.-22 Road Length 5.275 KM including Bridges & Culverts at Distt.- Durg (C.G.)
Widening & Strengthening of Kumhari Ahiwara Berla (MDR) Road Length 17/6 to 68/6 = 51.20 KM I/c Bridges & culverts at Distt.- Bemetara (C.G.) (Part-I) Widening & Strengthening of Kumhari Ahiwara Berla (MDR) Road Length 17/6 to 68/6 = 51.20 KM & ... including Bridges & ...
Strengthening & widening of Kumhari-Ahiwara-Pathariya (SH-21) Road Length K.M. 1/2 to 27/6 K.M. = 26.00 K.M. K.M. including Bridges & culverts At Distt.- Durg (C.G.)
Construction of Birampur-Thengabhat Road Length 3.00 K.m. & Dadhi Pachbhaiya Amcho Road Length 2.75 K.M Total Length = 5.75 Km including Bridges & culverts at Distt.- Bemetara (C.G.) (Group Tender)
Construction of Main Road to Damapur-Barejaha- Bharewapara- Karpi Road Total Length 5.50 K.M. (Working length 1.975 km) I/c Bridges & Culverts at Distt.- Kawardha (C.G.) (Nabard Scheme)
Widening & Upgradation Work of Chandulal Chandrakar Govt. Medical College Building to Junwani- Kohka- Kurud Main Road Length 2.50 KM i/c Bridges & Culverts at Durg Distt- Durg (C.G.)
CONVERSION OF MANIKPUR EXISTING CHP SIDING TO SILO LOADING SIDING AT KORBA UNDER SECL COMMAND AREA EXECUTION OF EARTHWORK IN FORMATION FOUNDATION SUBSTRUCTURE SUPERSTRUCTURE AND OTHER ALLIED WORKS IN CONNECTION WITH CONSTRUCTION OF ROB 2 x 24 M
Custom Bid for Services - Supply, Installation and Commissioning of additional CCTV near weighbridges and Monitoring Screens in all Weigh Bridges, at BIOM Kirandul Complex, Dantewada (CG) Similar Category INTEGRATED SECURITY SURVEILLANCE SYSTEM SERVICE
Facility Management Services - LumpSum Based - Job contract for Monitoring/Work Assistance for ash utilization activities at Ash dyke, Fly ash silo, AU avenues & Weigh bridges of NTPC-Korba; Job contract for Monitoring/Work Assistance for ash utili..
Construction of Dhaurabandh -Bansapur to Prankhaira Road from Ch- 0 M To 0.525 M & Ch-1825 M To 3600 M =2.312 Km Part-I (Actual length 3.60 km) I/c Bridges & Culverts At Distt.-Kawardha (C.G.) (Nabard Scheme)
Custom Bid for Services - Maintenance of Instruments installed at Blast Furnance, Compressed Air Station, Gas Mixing and Boosting Station, Weigh Bridges, Central Instrumentation Laboratory, LDCP and auxiliaries along with Gas Analyzer for a period of .. Similar Category Operation And Maintenance Of Gas Compressor Station
Dewatering from LHS/RUB at Level crossing No.C.G.-1 (between BPRH-CPH at Km.668/03-05), C.G.-7 (between BPRH-KTHD at Km.674/20-22), LHS 346 (between NIA-AKT at Km.678/22-24), LHS 347 (between NIA-AKT at Km.681/01-03), LHS 53A (between SGRD-BUA at Km.655/26-28), LHS 46A (between CPH-NIA at Km.667/18- 20), LHS-294 (between KDTR-BEF at Km.595/23-596/01), LHS-295 (between KDTR- BEF at Km.596/21-23), LHS-290 (between RIG-KDTR at Km.591/12-14), LHS-323 (between SKT-BUA at Km.640/30-32), and LHS-286 (between RIG-KRL at Km.580/3- 5) under the jurisdiction of Sr.DEN(East)/Bilaspur of Bilaspur division.
Custom Bid for Services - Cleaning slush muck fallen spillover coal at different places such as AB stock, around Weigh Bridges, either side of CT roads and tail end of W 1 to LKSM with embankment at Gevra Project of Gevra Area Similar Category Facility Management Services - LumpSum Based Hiring of Special Purpose Mining Machines (per hour Basis)
VIDAS TSH TEST KIT, VIDAS T3 TEST KIT, VIDAS T4 TEST KIT, VIDAS PROLACTIN TEST KIT, VIDAS PROGESTERONE TEST KIT, VIDAS HAV IGM TEST KIT, VIDAS HBSAG ULTRA TEST KIT, VIDAS HIV DUO II ULTRA TEST KIT, VIDAS ANTI HCV TEST KIT, VIDAS CMV IGG TEST KIT, ... VIDAS RUB IGG ... VIDAS RUB IGM ...
Widening and strengthening work including bridges and culverts in a total of 36.80 km from Km 7/8 to 22/10, 23/2 to 28/10, 33/10 to 35/2, 38/4 to 51/4 and 53/4 of Kanker-Bhanupratappur-Sambalpur Road (SH-06) included in the second supplementary budget of the year 2024-25 under the Central Road Fund Scheme
Widening & Strengthening in 7.0 M With Paved Shoulder of Rajnandgaon- Dongargaon-Chowki-Manpur Road SH-24 Length 36.70K.M. Distt.- Rajnandgaon (C.G.) (Part-I) (Under CRIF Scheme) [Widening & Strengthening of Rajnandgaon- Dongargaon-Chowki- Mohla ... Including Bridges & ...
Widening & Strengthening in Rajnandgaon- Dongargaon-Chowki-Manpur Road SH-24 Length 43/2 to 100/2 K.M.= 57.20K.M.. Distt.- Rajnandgaon (C.G.) Distt.- Mohala Manpur Ambagarh Chowki (Part-II) Under CRIF Scheme) (Widening & Strengthening of Rajnandgaon- ... Including Bridges & ...
(Group No. 05) Construction Of Boundarywall Work At Bodasagar Distt-Sakti, Repair And Maintenance Of Manager Quarter , Electrification Work And Water Supply & Sanitary Fitting At Baradwar Distt-Sakti, Repair And Maintenance Of 4000 MT Godown, Repair ... Weight Bridge , ... Bridge, Repair And ...