Loading…
Loading…
479 results • Best match
Balance work of construction of 13.00mtrs foot over bridge near Govt. Sr. Sec. School Rajpur on Dharamshala Yol Dadh Palampur Chadiyar Sandhole road at Km 36/850 (SW- Steel work, Paint work)
Engineering, Procurement and Construction of One No. Elevator/Public Lift and Foot Over Bridge from Sarwari to Sultanpur in District Kullu (H.P.) including operation and maintenance for 5 years on EPC basis.
Conducting load test of 50 mtr span PSC Box girder bridge over Kataula Khad at the North Campus of IIT Mandi
Construction of 55mtrs Span steel truss Foot Bridge over Ashwani Khad near Village Keen Kiar
25 Rmts span steel truss (SHS) foot bridge (CV-1.2 Mtr) at Tosh Distt. Kullu
Construction of foot bridge on Baggi Khad near Lohardi Village at BSL (P) BBMB Sundernagar
Construction of 30.00 mtr spanTruss Foot Bridge over Takoli Khad in Tehsil Bangana Distt. Una
Construction of Steel Foot bridge over jabbar khad on Danni ladori path Nurpur Forest Range
Construction of Foot Over Bridges at Vikas Nagar Shimla Distt. Shimla (H.P.) (SH Left out work of Staircase, Platform and Platform Roof etc.)
Construction of foot bridge cum culvert over Janet balanala near house of Lal Chand at Village Kukheda Jattan Ward No 5GP Ambehara Dheeraj APO Thanakalan under DPOIDP Una during 2024 2025
Construction of Rope Based Foot Bridge From Bagga to Pangilur in Machhrot Beat, Bassa BLock of Nachan Forest Range under Nachan Forest Division
Construction of of foot bridge over Gurudwara Bala Nala Village-Badehar, Ward No.- 1, G.P. - Badehar (C-2), APO - Una, under DPO, IDP Una (H.P.) during 2022-23
Engineering, procurement and construction of two no. foot over bridges at vikas nagar(phaseII and III (SH side covering of vikasnagar fob phaseII-III and both sides railing upto top cord.)
Construction of Foot bridge at place Baddu Bouri nalla GP Kothi APO Ghumarwin during 2021-22
IS...IT. FOB Rapid Test Kit
construction of Foot bridge at Sainwala in Mohalla Galwa Singh ka Pani in Ambwala-Sainwala GP.
C/O Foot Bridge at Silh Nallah near Village Swad GP Silhbudhani under APO Unit Padhar
C/O foot bridge to connecting Municipal Corporation office and Mayor Office along with electric work
Construction of Foot bridge at place Paniyala near house of Sh. Mast Ram GP Kothi APO Ghumarwin during 2021-22
C O 80 mtr span pre stressed bouble lane box girder bridge including approaches over beas at Raison Km 284 400 Distt Kullu
Protection work of abutment-1 towards mind tree school side at 50 mtr. PSC Box Girder Bridge at North Campus of IIT Mandi
C/O 34.50 mtrs. Span PSC box girder bridge over Dheli Nallah on Dhar Dheli Jasai road at rd. 2/650 including approaches) Under SCSP Head
Construction of Foot bridge at place Lendi nalla near Gujjar-basti GP Dabla APO Ghumarwin during 2021-22
C/O foot bridge near Kennedy Chowk Connection to Vidhan Sabha Shimla (Under Shimla Smart City Project).
Construction of foot bridge over Shamshan Ghat Bala Choe near IPH Tube well (USA Aid) at Village- Dangoli, Ward No.- 5, G.P. - Dangoli (C-1), APO Una under DPO, IDP Una (H.P.) during 2022-23
Construction of Foot Bridge over Pingla Khad Jangal Khad near Village Moue Gram Panchayat Pingla in Pingla Beat, Durgapur Block of Sarkaghat Forest Range under Suket Forest Division, Sundernagar during 2021-2022.
Construction of 77.00 mtr. Span RCC Box Girder Bridge over Chainth Khad on Bassi Badhani Chamboh road at R.D. 5/050Under Nabard RIDF XXV
Construction of 102 50 mts span PSC BOW String Girder Bridge over river Beas at Bhang Fishna Pot at Km 2 200 Under SCSP
Rehabilitation of existing minor Bridge of span 6.700 mtr. at RD 81/670 (Kachiari) and 25.800 mtr. Span bridge at RD 82/525 (Sukhad khad) in District Kangra, (H.P.)(SH-Repair of abutments, Flooring work and Protection work of Bridges etc.)
C/O 62.00 Mtr. Span foot bridge at RD 1/970 including both side approaches
C/O 40.00 meter span RCC Box Girder Bridge over Mandh Khad at RD 1/125 (Under NABARD RIDF-XXIX)
Construction of Foot Bridge to Connect village Ocha in Distt. Kangra (Himachal Pradesh).(SH-Balance work of bridge.)
Construction of Foot Bridge to Govt. Senior Secondary School Danoghat on NH Road at RD 32/730 (DMFT)
Construction of Bridge over Chor Nallah on link road Nagrota Bagwan to Dhauladhar Colony Industrial Area road in Distt Kangra (HP). (SH-Balance work of extension of 10.37 mtr. Span RCC Bridge over Chor Nallah at RD 0/250 (Deposit work).
Construction of 180m span bowstring girder bridge on Markanda at Ch 64 630 on NH 72 New NH 07 in the State of Himachal Pradesh
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer