Loading…
Loading…
1,816 results • Best match
Construction of Foot bridge for Kaithakkuzhy Thottinkara Valiyathodu
fob hand rail
Reconstruction of collapsed foot bridge
Re e tender - Chavakkad BP 2022-23 Foot bridge for Anganwadi No.23 ward 2 Kadappuram GP
MLA-SDF 2019-20 Devikulam LA Constituency Vellathooval GP Construction of Panniyarkutty Pothupara Foot bridge
CSIND Dismantling of old concrete foot bridge at Meerankadavu
269 Construction of Foot Bridge over Pilakottupadam Cheriya thodu
Annual Plan-Foot Bridge at Palattuapeedika in ward 17
260/24-Construction of Foot Bridge in Kadachikkunnu Colony
CSIND Dismantling of old concrete foot bridge at Meerankadavu
P 88/2023-24-Kuzhinjalikkunnelpadi foot bridge hand rail
Foot Bridge maintenance
Urgent Maintenance of Bridges in NH 66 Old NH 17 Muzhappilagadu ROB Moidu Bridge and Dharmadom Bridge General Civil Work
Boatjetty and foot bridge repair.
CSIND Construction of Temporary Steel Foot Bridge across TS Canal at Ch 46300m
GENERAL-Total station survey and preparation of survey sketch of area under Kollam ROB.-Preparing survey sketch.- Investigation Work
P 95/2023-24-Pulikkakkunnelpadi foot bridge hand rail - Retender
PROJECR NO. 325/19-20 COMPLETION OF CHITHARI FOOT BRIDGE
IWT-Investigation estimate of Perunthuruthi foot bridge in Kozhikode Corporation
CMLRRP (PHASE 2) RECOSTRCTION OF FOOT BRIDGE AT KALINKAL THODU
Local Area Network System at PWD Bridges Division, Alappuzha
DEPOSIT WORK -PWD Bridges - Temporary laying of 100 mm HDPE pipe before the construction of bridge at Chathiyara in Thamarakulam Panchayat
Collection of user fee on contract basis from Road Over Bridge at Cheruvathur
Collection of user fee on contract basis from Road Over Bridge at Bekal
Beautification of Dawsons Girder Bridge at the entrance of Nedumgayam Eco Tourism centre in Karulai Range under Nilambur South Division
KOODAL NELLIMURUP FOOT BRIDGE IMPROVEMENT IN WARD 19
Kaithara thellikkuzhi road bridge construction and pirambinkonam road concrete
Annual Plan P No 99 25 217 26 Construction of Pedestrian bridge across Mathunkal Ameda Stream in Thalayazham GP
LAC ADS MLA work NIP Construction of Bridges in various Places of Channels in Karode Thirupuram Athiyannoor Grama Panchayat and Neyyattinkara Municipality General Civil work General Civil Work
Demolishing and construction of foot bridge across Shanmugham canal at Charumthara in Padiyur Panchayath
ROAD FOOT BRIDGE AND ROAD CONCRETE ,
GENERAL-Minor bridge at Anjanam Investigation -Investigation Work
Foot bridge
GENERAL-Attaramoola Bridge-Construction of bridge across Kottukal valiya thodu (Attaramoola Manali thodu) at Manapuram in Kottukal Panchayath-General Civil Work
GENERAL-Urgent Repair and Rehabilitation works for various Bridges under Bridges Section Manjeri in Manjeri LAC in Malappuram District-Repair and Painting Works-General Civil Work
GENERAL-Urgent Repair and Rehabilitation works for various Bridges under Bridges Section Manjeri in Vengara LAC in Malappuram District.-Repair and Painting works-General Civil Work.
PRO 267/24-25 Construction of Foot bridge across Adichira Thottupalam
2019-20 anuual plan- Poovathi Moideekuttipadi Foot bridge Reconstruction in chaliyar
This estimate is prepared as part of Annual plan 2025-26 in Thirunelly Gp for the Proj.no-367-Construction of Begoor Anganavadi foot bridge At Ward IX for RS- 400000. Currently there is a wooden foot bridge.
LAC-ADS-LAC- ADS 2023-24 Investigation work for the Construction of Foot over bridge across Ithikkara river at Ananchal Kadavu in Kollam District-Investigation-Investigation Work
DEPOSIT-Eravipuram For the construction of ROB-Pipeline WorkFor the construction of ROB-Utility shifting of Eravipuram For the construction of ROB-Pipeline Work
UCR in Kozhikode District- Construction of Padinjare Vattakandy- Makkachi Maithanam Northern side Foot bridge Cum Drainage-Construction of Padinjare Vattakandy-Makkachi Maithanam Northern side Foot bridge Cum Drainage
Premonsoon work 2026 Under bridges section KozhikodeMaintenance work
Construction of Minor Bridge
GENERAL-pre-mansoon-pre mansoon works under Bridges section Tirur-General Civil Work-1
DEPOSIT-PWD Bridges-Temporary laying of 110 mm HDPE pipe before the construction of bridge in Kalkulathal Culvert In Vallikunnam Panchayat.-Pipeline Work
ESTIMATE FOR THE COST OF PROPOSED RETAINING WALL NEAR FOOT OVER BRIDGE AT THUSHAGIRI ECO-TOURISM UNDER THUSHARAGIRI VSS IN EDATHARA SECTION OF THAMARASSERY RANGE DURING 2020-21
Aluva Mahadevar devaswom-Paravur group--Concreting the pathway infront of foot over bridge to prevent the water stagnation, clay and silt during the time of Karkkidakavavu and sivarathry.
KATTUKUKKE AMBALAM BANDHARADAMANE DRINKING WATER SOURSE PROTECTION AND FOOT BRIDGE-ENMAKAJE GP
Construction of a Steel Foot Bridge across Badagara Mahe Canal at Karuvayal