Loading…
Loading…
1,820 results • Best match
GENERAL-Investigation Kelamangalam Karisseri Bridge-Investigation for preparation of Contour Survey Plan, Cross Section and Longitudinal section of the river for the proposed bridge construction at Kelamangalam Karisseri in Thakazhy Grama Panchayath
Shoranur-Mangalore section: Proposed construction of additional under pass (1 x 6.00 x 3.80 m RCC box) adjacent to exg. Br.no.1131 (RUB) at km 775/100-200 between Payangadi and kannapuram station ( deposit work of state govt- Kallayassery gramapanchayat).
Shoranur-Mangalore section: Proposed construction of additional under pass (1 x 6.00 x 3.80 m RCC box) adjacent to exg. Br.no.1131 (RUB) at km 775/100-200 between Payangadi and kannapuram station ( deposit work of state govt- Kallayassery gramapanchayat).
FAC road to Ponnurunni ROB in Vyttila Palarivattom Road
DEPOSIT-Deposit Work 2024-25-Veliyanad Block Panchayath Replacing existing 140mm PVC Pipeline of Narayanamangalam and Oorukkary temple bridges with a new 140mm HDPE river crossing In ward 10 of Ramankary panchayath.-Pipeline Work .
GENERAL-PWD Offices, Kollam-Supply and installation of Inverter at Roads Section Kollam, Special Buildings Section-I and II Kollam, Bridges Section-I and II Kollam and Electrical Section-II Kollam-General Electrical Work
rectification of the damage in bridge work
Rectification of canal,Road work,construction of bridge
Investigation work for the Re-construction of bridge
Investigation work for the Re Construction of bridge
Melayi valappu Small Bridge Construction
Bridge Construction and Road concreting
ROAD FORMATION AND BRIDGE CONSTRUCTION
RMF West pathanapuram downstream of Areecode Bridge Construction of retaining wall on the right bank of Chaliyar river downstream of Areecode Bridge at Westpathanapuram in Keezhuparamba Gramapanchayth in Malappuram District General Civil Work
Balance work for protection work, fixing of shutters, construction of store room.
This estimate is being prepared for facing the flood damages repairs during the coming monsoon, especially from month July to August.Provisions are given in this estimate, for clearing vegetation, pothole filling etc
GENERAL Tractor bridge Construction of approch on both sides of Tractor bridge across Ayiraveli thodu between Pullattupadam and Thekke vavackadu padam padam in ward no 8 of Kainakary panchayath General Civil Work
Collection of userfee on contract basis from ROB at Koilandy
Collection of userfee on contract basis from ROB at Devdhar
Collection of userfee on contract basis from ROB at Koyilandy
JJM-- CWSS to Karulai Amarambalam Moothedam and Chokkad GPs -PACKAGE-1-Construction of 12 m dia well cum pump house Rest room Approach bridge Retaining wall Cross bridges Supplying and laying of RWPM-General Civil Work
GENERAL Improvements to various roads in Chandranagar colony ( in Marutharoad GP) in malampuzha LAC Investigation work for canal bridges across Malampuzha LBC (II nd),Improvements to various roads in Chandranagar colony ( in Marutharoad GP) in malam
Contract KBC3 Design and Construction of Elevated Viaduct and 10 Elevated Stations Excluding Architectural Finishes, Building Services, Link Bridges and Entry-Exit Structures of Phase II of Kochi Metro Rail Project from JLN Stadium to Infopark.
LAC ADS NIP construction of Bridge near ch 13000 m for Connecting Kuzhiyanvila Road with Channel road Ch 3900 for connecting Poothottuvila kottukal konam Bund Road ch 14500 m for connecting Surya Nagar Road with channel bund ch 2150m for
DEPO KIIFB Depositwork Utility shifting of 600mm DI Raw water Pumping main 300mm DI Clear water Pumping main and 240 HT cable in connection with construction of bridge and approach road across Vellayani lake Relaying existing 600mm DI Pipeline Work
the rectification of the damage in bridge work
Annual Plan-Mananthavady Municipality ,P.No.410 /2022-23-Construction of Foot bridge near Chennalayi Pulpra area ,Division 7,RS.100000/ chainage at 120m-General Civil Work
Investigation estimate for construction of bridge at Karukel Kadavil
GENERAL-Premonsoon works at various bridges in Poonjar Constitency-Premonsoon works at various bridges in Poonjar Constituency-General Civil Work
MLA WORK
Bridges - Rectification of Damages due to flood
A n n u a l P l a n - K I L I M A N O O R B P - OOLANKUNNU BRIDGE CONSTRUCTION IN KILIMANOOR GP-PROJECT NO 115/22- General Civil Work
Urgent removal of debris and other deposits in the upstream side of ambulance bridges at Perumankara Pandi Mudikuzhi and Vettukulanji in Pamba river leading to Thottappally spillway in Cheruthana Panchayath of Harippad LAC for the year 2021.
Collection of user fee on contract basis from ROB at Koyilandy
Drawing 5kms of HT ABC with a ROB railcross UG cable
collection of user fee on contract basis from ROB at Koilandy
Collection of user fee on contract basis from ROB at Cheruvathur
Collection of user fee on contract basis from ROB at Mulamkunnathukavu
Collection of user fee on contract basis from ROB at Devdhar
Demolishing
Construction of Building
GENERAL-Maintenance various Bridge under Haripad Section in Haripad LAC 2023-24- Maintenance various bridge under haripad section in haripad LAC 2023-24-General Civil Work