Loading…
Loading…
1,820 results • Best match
Road
road work
Soil Investigation
Bridge
Bridge
Public work
The items of the estimate are Earth work, CC 1 4 8 concrete for levelling course , CC 1 2 4 concrete for culvert foundation and abutment, RCC 1 2 4 ,20mm aggregate for bed block and parapet ,centering and Shuttering , RCC 1 1.5 3 for slab, Steel
Infrared Medical Thermometer For Measuring Body Temperature, Alcohol Based Hand Rub/Hand Sanitizer, Disposable Surgical Rubber Gloves - Prepowdered-IS:13422, Surgical isolation Faceshield
ollows. Repair to plaster Scraping Ceramic floor wall tile for toilets Painting with acrylic emulsion paint. windows and doors repair PVC doors for toilets PVC pipes for toilets G I sheet roofing PVC water tank and pipes
GENERAL-Kizhakkekad-MLA-SDF-2025-26- Construction of bridge at Kizhakkekad in Nalepilly Grama Panchayath in Palakkad district -General Civil Work
Construction of bridge 4 spans , total length 104m, 1.5m footpath on either sides, pile foundation for abutments open foundation for piers
GENERAL-Premonsoon works-Premonsoon works 2025-26-Various bridges under this section in Devikulam constituency-General Civil Work
GENERAL-Premonsoon works-Premonsoon works 2025-26 -Various bridges under this section in Udumbanchola Constituency-General Civil Work
Investigation with boundary stone laying
in this portion M40 grade tile is proposed after rasing surface using WMM.close graded patch repairs is proposed for damaged bituminous surface from kseb post c/kl-135 to c/kl-128(drawing attached) after doing necessary pot hole filling
Construction of Culvert, Construction of Box Culvert, Road Construction
INVESTIGATION WORKS
Transportation of plants setting up boring conducting SPT at various depth,recovering samples, fixing TBM, FLY levels,total station survey,site plan and DPR preparation
CULVERT AND SIDE WALL
Please refer the tender documents
Bridge
Soil Investigation works
Boring Total station survey fixing TBM standard penetration test
Road
GENERAL-Repair and Maintenance works 2023-24 -Repair and Maintenance for Various Bridges in Thrissur section-General Civil Work
Water hayacinth and desilting of thodu
Small bridge Maintenance
Removal of hyacinth, weeds and desilting thodu
GENERAL-Ayanthikkadavu Bridge- Boundary Stone Planting-Planting boundary stone for demarking land to be acquired-General Civil Work
Road
Multi Year, CFC Grant
Culvert
Please refer tender documents
SLTF 2019-20 Urgent surface rectification works and CC drainage with covering slabs under ROB of Nilewaram - Raja road Km 1/300 to 1/530
Urgent Special repairs and flood damage works to various bridges under this section in Devikulam LAC General Civil Work-1
Shifting of Electrical utilities for the construction of ROB in lieu of LC No.115(Thrippakudam Railway Gate) in Deposit work Scheme under Electrical Section, Harippad