Loading…
Loading…
1,820 results • Best match
Others Drought 2023 24 Balance Work of Bore well No 3 Near Cherukunnam Bridge Construction of pump house Installation of submersible motor pumpset and interlinking to the existing line at Kanniyamagalam in Kizhakkenchery GP General Civil Work
Turfing on DS of Saddle Dam Repairs to culvert and bridges at main entrance of the dam and KSEB junction Construction of compound wall with gate and fencing at IB compoundStrengtheningof hoisting pillars and beams at dam topSurvey of reservoir
Construction of Box Culvert and Approach Road.
The work is proposed for Removal of slip and reconstruction of damaged portion in Elappara Upputhra road 0 00 to 16 00 The approach road to bridges handrails and side parapets along with sidewall needs to be reconstructed along with providing WMMGSB
Painting and slogan painting works
Fencing work
Shifting of the Existing 900 mm DI K9 pumping main Chowara NParavur to the opposite side Chowara Desam road near Railway cross with new 900 mm DI K9 pipe in connection with the construction of Purayar Railway overbridge Pipeline Work
Dismantling of damaged handrails, repair of damaged handrails, construction of new hand rails RCC or kerbs and parapet, repair of steel handrails, painting and labour for clearing if needed. etc
Goods Transportation service - Monthly Based Service - Outside state; Railway Material; Pickup Truck
Grease Graphite(V2) Conforming to IS 508 (Q3) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/7013228 Dated : 17-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Dismantling of damaged handrails, repair of damaged handrails, construction of new hand rails RCC or kerbs and parapet, repair of steel handrails, painting and labour for clearing if needed. etc.
Road
Steel Channels and Hot Rolled Steel Section (in Metric Tonne) as per IS 808 (Q3)
jacks hydraulic (Q3) ()
Floor Cleaner T Mop, Mop Refill, Mop Cloth, Stainless Steel Handle Wiper, Toilet Cleaner Brush, Dettol Hand Wash Liquid 200 ml, Exo Round Dishwashing Bar 500 gms, Surf Excel Detergent powder 1 kg, Broom Soft, Plastic Bucket 20 Ltr, Plastic Mug, Soap ... Dirt Rub off ...
Polydioxanone size 1 comma 90 cm 1 by 2 Circle needle 40 45mm Box of 12, Monofilament Nylon 2 by 0 comma 3by 8 Circle comma Reverce cutting 20 24 mm Length 75 Cm and above, Monocryl 3 by 0 cutting 26 mm needle, Monocryl 4 by 0 cutting 26 mm needle, ... Alcohol Rub btl ...
Solar sea weather and pollution transmitter buoy, Micro controller based 4 quadrant speed control system, Induction motor controller and protection system, EV Bms with charge monitor and fire protection, Arduino ultasonic sonar radar monitor project, ... at bridges for ...