Loading…
Loading…
1,153 results • Best match
Providing Consultancy services for land acquisition and GAD work of Construction of Railway Under Bridge (RUB) at Railway Station Dokwa- Hadyal Churu District in accordance with the RFCTLARR Act 2013 and Rajasthan rules 2016 (Land Acquisition rules)
END FITTING TO PG48,ANNX A,TAB.A2,SNO8., as per Drawing/ Spec. No.: RDSO/PE/SPEC/AC/0138-2009(REV-I), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING
TUBE CLAMP TO PG11,ANNX A,TAB A8,SNO2., as per Drawing: RDSO/PE/SPEC/AC/0138-2009(REV-I), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTAT
Rehabilitation and Resettlement Rules 2016 and LARR Act 2023 for the Construction of ROB RUB Railway Crossing No LC-60 on Bikaner - Merta Road Section at Km 575/3-4 in District Nagaur Accordance with the Rajasthan RFCTLARR rules 2016 (Land Acuisition
KOTA - NAD & RMA - JLWC Section - Provision of balance 16 Nos. Lifts at 12 mt. wide central FOB at 07 stations under ABSS, KOTA - MTJ & KOTA - RTA Section - Provision of balance 15 Nos. Lifts at 12 mt. wide central FOB at 08 stations under ABSS, Kota Div- Provision of lifts at BWM (01 no.) & VMA (01 No.) PF-1, Provision of lift at Bhawanimandi and Vikramgarh A lot stations at PF-2. Tender floated for BWM-3, VMA-3, JLWC-3, CAG-2, Total 11 Lifts, as per eoffice file Computer No. 354346).
JP Div-Electrical work in c/w Provision of FOB to connect both PFs at Dabla (DBLA) station. Raising the level of PF No. 1 & 2 from Medium Level to High Level and extension of lengths of PF No. 1 & PF No. 2 to 600 meters with provision of FOB to connect both PFs at Kanwat (KAWT) Station, Extension of length of PF No. -1 & 2 to 600 meters at Shri Madhopur (SMPR) Station Raising the level of PF to High Level at Kachera (KHRA), BAGA, MADA, JLLO, APJ & KMNP Stations.
JP Div-Electrical work in c/w Provision of FOB to connect both PFs at Dabla (DBLA) station. Raising the level of PF No. 1 & 2 from Medium Level to High Level and extension of lengths of PF No. 1 & PF No. 2 to 600 meters with provision of FOB to connect both PFs at Kanwat (KAWT) Station, Extension of length of PF No. -1 & 2 to 600 meters at Shri Madhopur (SMPR) Station Raising the level of PF to High Level at Kachera (KHRA), BAGA, MADA, JLLO, APJ & KMNP Stations.
Consultancy Services for Preparation of DPR including Land Acquisition and detailed design an drawing of Road and ROB (1nos) for Construction of Bye-Pass Road From Jhunjhunu Mandawa Road (NH-11) to Sikar-Jhunjhunu Road (SH-08)
Social Impact Assessment Study work on Construction of 2 Lane ROB on Sawai Madhopur- Jaipur Section in lieu of existing Level Crossing No. LC-41 Between channani - Banasthali Newai Railway, District Tonk in the State of Rajasthan
Construction of double box RUB with covered approaches, service roads and other road safety and drainage works in lieu of LC-176 at Km 201/0-1 of Sriganganagar- Hanumangarh Rly. Section on Hanumangarh-Sriganganagar road (SH-36)
END FITTING TO PG-11,ANNX A,TAB.A2,SNO2., as per Drawing/ Spec. No.: RDSO/PE/SPEC/AC/0138-2009(REV-I), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURIN
Consultancy services and Preparation of DPR and GAD for proposed Railway Over Bridges for Railway Crossing No. LC-113 on Merta Road-Jodhpur Section at km 540/2-3 District Nagaur (Rajasthan).
Consultancy services and Preparation of DPR and GAD for proposed Railway Over Bridges for Railway Crossing No. LC-99 on Degana-Merta Road Section at km 520/1-2 District Nagaur (Rajasthan).
Construction of Balance work for 2- Lane ROB and its approaches in lieu of existing level crossing No. A-142 at Km 1.00 on NH-709Extn.near Sadulpur in District Churu on EPC Mode in the State of Rajasthan
Construction of Rail over Bridge ROB in between Pawanpuri - Nagnecheji Mataji Temple Bikaner at LC-261 on Ratangarh - Bikaner and Merta - Bikaner Railway Section Between Km.-459-2-3, 464-1-2 in District Bikaner in the state of Rajasthan.
37 Shifting of pipeline by Providing Laying Jointing Testing and Commissioning of 400 mm Dia DI and MS Pipeline under Bisalpur Ajmer Water Supply Project due to construction of ROB by RSRDC near Saras Dairy Railway Crossing Ajmer
Hiring of Consultancy Services for feasibility study of site Preparation of detailed drawing Detailed Structural design DPR and Preparation EPC documents for Construction of 4 lane Fly Over and ROB work at Mandalnath Junction Jodhpur on EPC Mode
Consultancy Services for Survey Investigation and Preparation of Detailed Project Report (DPR) for Construction of High Level Bridges,Construction work bridge and approach road in the submerged area of Piplad Dam in Kundikheda
Supply, installation testing, and commissioning of one nos pit less weighing bridge capacity of 40 MT along with Construction of Bridge Operating room and waste Receiving Tipping Floor Regarding work and other concenerd at MRF Plant Dhamni
Maintenance existing shrubs at Army area, greenbelt from Khatipura T-junction to Amanishah Nala, Garden under ROB Khirni Phatak, Vaishali marg, Gautam marg, Amarpali marg, Gandhi path C-zone by pass to Hingalaaj Nagar, Hingalaaj Nagar to Jaipur bagh
Development and maintenance (for 1 year) of Horticulture work under ROB L-70, near Mahatma Gandhi Hospital and Maintenance of Plants in median and greenbelt on tonk road from Sanganer flyover to Sitapura fly over for 1 year maintenance.
Consultancy work for preparation of Detailed Project Report (DPR) including Land Acquisition and detailed design and drawing of ROB (1 Nos.) for Const. of Byepass Road from Ludhawai Toll to Tuhiya via Murwara Bhandor in Bharatpur (Est. Length 15Km.)
Maintenance existing shrubs at Army area, greenbelt from Khatipura T-junction to Amanishah Nala, Garden under ROB Khirni Phatak, Vaishali marg, Gautam marg, Amarpali marg, Gandhi path C-zone by pass to Hingalaaj Nagar, Hingalaaj Nagar to Jaipur bagh
Development and maintenance (for 2 year) of Horticulture work under ROB L-70, near Mahatma Gandhi Hospital and Maintenance of Plants in median and greenbelt on tonk road from Sanganer flyover to Sitapura fly over for 2 year maintenance
Construction of Balance work of proposed 2-Lane ROB and its approaches in lieu of existing Level Crossing No. A-142 at Km 1.0 on NH-709Extn. Near Sadulpur Railway Station in District Churu in the State of Rajasthan.
Development and maintenance of existing old median plantation for 2 year, Induni Rly Phatak to Khatipura Phatak, Rly line to SKIT college sector road, marriage garden median, Dantali siroli under rob median and Khatipura pulia to ring road greenbelt
Ajmer Division: Provision of S&T work in C/W Construction of RUB in lieu of LC 9, 15, 17, 38, 40 and 50 with Covering shed at these LCs for elimination in COR-UDZ section over Ajmer Division NWR.
Construction of Foot Over Bridges with Lift facility at 04 Nos of locations between Km 107.100 to Km 268.300 on Gurgaon Kotputli Jaipur section of NH 48 in state of Rajasthan on EPC Mode
Consultancy of Survey and investigation of soil, Topography survey and providing design, drawing, estimation and BOQ, Proof checking from NITs/IITs/Faculty of Govt. Engineering college for Const. of ROB LC No 95 and LC No 83 in State of Rajasthan
Consultancy Service for preparation of GAD including seeking approval from Railway and authorities and detailed project report of construction of ROB at SriDungargarh LC No 224/B1-2 railway Km 388/1-2 on SriDungargarh Bidasar Road (SH-93) SriDungarga
Consultancy Services for Preparation of DPR including Land Acquisition and detailed design and drawing of Road and ROB (1nos) for Construction of Bye-Pass Road From Sikar-Jhunjhunu Road (SH-08) to Jhunjhunu Chirawa Road (NH-11) Via ( as per nit)
Survey and Investigation of Soil, Topography Survey of area and Providing GAD duly approval by Railway, Design, Drawings, DPR and BOQ, Proof Checked from MNIT and complete Consultancy for the Construction of ROB at LCR No 204 on Bassi-Kanota Section
Construction of 2 Lane ROB including approaches, service roads, Diversion and Limited height subway (LHS) in lieu of LC-36 at Indian Railway Km 62/705, Sawai Madhopur Jaipur section between Siras Banasthali Niwai Railway Station on SH-117 at Niwai
VALUATION OF STRUCTURES FOR LAND ACQUISITION FOR THE WORK CONSTRUCTION OF 2 LANE ROB ALONG WITH VIADUCT SPANS AND RETAINING WALL APPROACHES AND LHS BELOW EXISTING LC NO. 95 ON ALWAR NUH SECTION OF NH 248A UNDER ANNUAL PLAN 2025-26
Construction of 2 Lane ROB including approaches, service roads with Structures , Diversion with Structure and Limited height subway (LHS) with Approaches At IR Km 50/750 In Leiu of LC-38 on Bharatpur city - RIICO Area Road Between Bharatpur-Achnera
Construction of 2 Lane ROB including approaches, Service Roads, Diversion and Limited Height Subway (LHS) in lieu of LC-41 at Indian Railway Km 67/180, Sawai Madhopur Jaipur Section between Chanani Banasthali Niwai Railway Station on ODR-10 at Niwai
Strengthening of 4-lane road with culvert from NH-27 Anta to Siswali Tiraha (ODR-15) and construction of 2 lane ROB at Km 37/111 (LC-21 ASPL) of Mangrol Anta Sangod Road (SH-51A) (Anta Town Portion) District Baran.
construction of bridge palsana road near vivekand school
Laying and shifting of sewer line by trench less method near Utsav hotel, Rani Bazar, Bikaner.
JP Div-Electrical work in c/w Raising the level of PF No. 1 from Medium Level to High Level and extension of lengths of PF No. 1 to 600 meters with provision of FOB to connect both PFs at Laxmangarh (LNH) station, Raising the level of PF No. 1 & 2 ... of FOB to ...
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Left over work of Tower Wagon Shed ... wide FOB at ... with FOB & ...
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Left over work of Tower Wagon Shed ... wide FOB at ... with FOB & ...
Swing Over, Hand and Foot Bridge, Crawling Fence Wire, Tunnel, Tyre Obstacle, High Step Up, In and Out Ditch, High Stable Balance, 10 Feet Wall
Survey and Investi. of Soil, Topography Survey of area and Providing GAD duly approval by Railway, Design, Drawings, DPR and BOQ, Proof Checked from MNIT and complete Consultancy for the Const. of RUB. at LCR 151 on Bandhey Balaji-Sambhar road VR
Survey and Investi. of Soil, Topography Survey of area and Providing GAD duly approval by Railway, Design, Drawings, DPR and BOQ, Proof Checked from MNIT and complete Consultancy for the Const. of RUB. at LCR 151 on Bandhey Balaji-Sambhar road VR
Light Pole work ganga mandir to singhawali road ROB NH123
Sever Line Shifting work at ROB constrction site Navli Gate.
Replacement of Steel Channel Sleepers by H-Beam Sleepers on Important & Major Girder Bridges No.54 & 81 on Samadari-BhilDi Section & Br.No.35 on SMR-BME section in the Jurisdiction of Sr.DEN/West of Johpur Division
Construction of ROB with approches in lieu of LC No. C-66 at Railway Km 89/2-3 on Bathinda- Suratgarh section at Hanumangarh- Abohar road (SH-7A) Km 3/0 including construction of approaches on Hanumangarh- Sangaria Road at this junction (Satipura)
Consultancy Services for Preparation of DPR for Construction of 4-Lane bypass to Ras town on NH-158 and Construction of 2-Lane with paved shoulders configuration of bypass (with provision of new ROB) to Mandal town connecting NH-158 to NH-48