Loading…
Loading…
1,153 results • Best match
Provision of RUB in lieu of 03 no. manned LCs in the Suratgarh - Bikaner section using Air Pushing Technique (LC no. 117 (2x5.0mx5.0m), 118 (5.0mx5.0m) & 119 (5.0mx4.5m)) in the jurisdication of ADEN-Suratgarh.
Hiring of Consultancy Services for feasibility study of site, Preparation of detailed drawing, Detailed Structural design, DPR for Construction of Railway under Bridge (RUB) on Rakhidara Road (Mandore Choki to Ambala Bera Jodhpur)
Manufacturing and Supply of Portable Train Detection and alarm system for bridges conforming to specification with all contract materials, labour, lead, lift, transportation, etc. as per the Technical
DY. CSTE GSU JP Div.:- Telecom work in Connection with construction of new Station Building, extension of FOB, Circulating Area, construction of one longer loop line with PF at Dahar ke Balaji(DKBJ) station over Jaipur Division.
DY. CSTE GSU JP Div.:- Telecom work in Connection with construction of new Station Building, extension of FOB, Circulating Area, construction of one longer loop line with PF at Dahar ke Balaji(DKBJ) station over Jaipur Division.
Consultancy Services for Preparation of DPR including Land Acquisition and detailed design and drawing of Road and ROB (1 nos) for Construction of Bye-Pass Bali, Falna and Sadri (Approximate Length 28.0 Km
Kota-Nagda Section: Construction of 2-lane ROB in lieu of LC No: 21 (TVU=140603) at km: 0736/30-32 between Vikramgarh A lot-Thuria stations in the section of ADEN-Shamgarh.
ADDITIONAL WORK OF CONSTRUCTION OF 2-LANE OF ROB AT OLD LC NO-88 AT RAILWAY KM -516/7-8 ON JAWAI BANDH-BALAWANA BISALPUR ROAD NEAR BALAWANA IN THE STATE OF RAJASTHAN.
Construction of Eight Lane access controlled Expressway starting near Start of RoB (Ch.214.260-247.310) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
CONSTRUCTION OF ROB AT LC-68 IR KM. 98/3-4 IN LEIU ON HINDDON KATHUMAR ROAD SH-22 IN DISTRICT ALWAR RAJASTHAN BETWEEN KHERLI CHIDARUA RAILWAY STATION ON AGARA-BKI RAILWAY SECTION
Consultancy Services for preparation of DPR including Land Acquisition, Forest Clearance and detailed design and drawing of Roads, CD Works/Bride and ROB for Construction of Ring Road Jalore. (Approximate Length 33.0 Km.)
Consultancy Services for Preparation of DPR including Land Acquisition and detailed design and drawing of Road and ROB (1 Nos) for Construction of Bye-Pass Bali, Falna and Sadri. (Approximate Length 28.0 Km.)
Construction of balance work of ROB at km 30.00 of NH162E Pali Nadol section crossing Falna Marwar Railway section at LC no C67 near Somesar in the State of Rajasthan on EPC mode
CONSTRUCTION OF 2-LANE ROB ALONG WITH APPROACHES AND LIMITED HEIGHT SUBWAY (LHS) ON EXISTING LC NO. 95 ON ALWAR-NUH SECTION OF NH-248A IN THE STATE OF RAJASTHAN ON EPC MODE
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Provision of 3 mtrs wide FOB at ... with FOB & ...
Electrical work in c/w Provision of an additional PF No.3 by slewing of line No.5 & extension of PF No.1 by 92.40 m towards BTI end at Sirsa station of Bikaner Division including all requisite passenger amenities, Provision of 3 mtrs wide FOB at ... with FOB & ...
HEX NIPPLE 40 BORE, as per Drawing: IS:1239(PT-2)-92, TABLE-28, CONFIRMING AISI 304, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.T
Consultancy Services for Detailed Project Report (DPR) Preparation for work of Renewal of Bagudar to Amalda Road and Construction of Bridge on Banas River (Additional work of CM Announcement Year 2023-24)
Catering Services as General Minor Unit No. BHL-51 at P.F.No. 01-Location 5 meter away from Amul stall FOB Side earmarked for General category at BHILWARA Station of A Class for a period of 05 (Five) Years.
Construction of Minor Bridge 2 by 10 at km 40 116 at Aligarh Village and 120 m diversion on one side with 1200 mm Hume Pipe and safety boards and construction of Box Culvert 1 by 3 by 2 point 5 at km 67 200 near Y Junction of Kustala on Tonk SWM
Custom Bid for Services - RFQ 11404 AMC of Avery Make Weigh Bridges & Weighing Machines at KCC for Two Years Similar Category Operation And Maintenance Of Other Machines And Plants
Consultancy services for GAD preparation with detailed design, drawings and DPR work for Construction of New Bridge across Berach River and Assessment of existing Bridges on Itali Bhadsora Road
Remaining work of providing laying, jointing, testing and commissioning of remaining sewer line and other ancillary works, in lieu of shifting of existing sewer line for construction of ROB at LC No 44 Ajmer
Consultancy Work for preparing of soil testing reports, Survey and Design for Rehabilitation and GAD Approval for Construction of ROB on SH-11 Sanchore Raniwara MAndar Block Section Raniwara LC No 114) Distt. Jalore
Remaining and Balance work of Construction of Two (02) Lane ROB in lieu of LC No. 44 (Gulab Bari Fatak) at Rly. Km. 291/3-4 between Madar Ajmer Stations (Excluding cost of Cement)
Art Painting work on Itarana ROB.
Split pin 8x45, as per Drawing: IS : 549-2005 ST 34 coating as per MDTS-057, Packing instruction: As per standard packing. It should be ensured that item should not rub during transportation. The item
Construction of FOB at km 6.420 (Amity university), grade separated structures/flyover at km 7.965 and 8.075 (RIICO KANT Kalwar), 11.780 (Achrol) and 25.300 (Kukas) with slip road on NH-248 for rectification of identified blackspots/accident spots in
JP- Electrical work in connection with [1] Raising the level of PF No. 1 & 2 at RSH,CRWA,NUA,BWPL,BOTR & NRKE , Extension of PF-1 & 2 at CRWA and FOB at RSH station, [2] Raising the level of PF No. 1 & 2 and FOB at LNH ,BUB & RSWT , Extension of PF ... of FOB at ...
S&T Work in connection with "Proposal for construction of 2-lane Road Under Bridge of size 1X13.50X5.50 m by Box Pushing open cut method using RH girder at KM: 865/29-31(CH:865.845 Km) between Kanwalpura and Dara station of NAD- KOTA section
Construction of bridge in 15o
Consultancy work for preparation of Detailed Project Report (DPR) including Land Acquisition and detailed design and drawing of ROB for Const. of Bayana Byepass - Bidyari (SH-01) to Brahmbad Road (SH-45) in Distt. Bharatpur.
consultancy work for Prepare of DPR of Construction of ROB In front of Pawanpuri Nagnechiji Mataji Mandir Bikaner (LC-261 on Ratangarh-Bikaner Bikaner-Merta Road Section between Km. 459/2-3 464/1-2)
CONSULTANCY SERVICES FOR CONSTRUCTION OF FOUR LANE ROB INCLUDING UNDERPASS IN LIEU OF LC NO. 90/SPL AT NADI KA PHATAK ON JAIPUR SIKAR RAILWAY LINE JOB NO. CIRF (SETU BANDHAN)/1122/RJ/23-24
Construction of 2 Lane with paved shoulder configuration of bypass with provision of new ROB to Mandal town District Bhilwara with connecting NH 158 to NH 48 in the state of Rajasthan on EPC mode
Consultancy Services for Survey Investigation and preparation of Detailed Project Report (DPR) for Construction of ROB on Ramganj Mandi Jhalawar Railway LC No. 3-A/2-E Suket Pipliya road Km. 8/0 (MDR-109)
Consultancy services for soilinvestigation GAD Preparation withdetailed design drawings andDPRwork forconstruction of road overbridge ROB with approaches in lieu of level crossing no27 at Railway Km 525/5-6 on Nokha Jaipur Road Blocksection NokhaYard
Balance work of Construction of 2 Lane ROB and its approaches in lieu of existing level crossing (LC No. C-61) at Km 165.550 on NH-89 on EPC Mode in the State of Rajasthan
Providing and fixing of reinforced Ferro-Cement drain covers shankar dharm kanta to mukhaji colony maheshwary dharmshala to vm school corner, dhasmes nagar to fci gate NM pg college to dera ROB to RUB Dera shanti das to chungi no. 6
Replacement of Steel Channel Sleepers by H-Beam Sleepers on Important & Major Girder Bridges No.107,122,127,129, 147 on Samadari-Bhildi Section in the Jurisdiction of ADEN/Samdari of Jodhpur Division
S&T associated work in connection with Provision of RUB at Km 105/4-5 in lieu of LC-78 in RE-SDLP section & LC-144 in SDLP Yard of RTGH- SDLP Section of Bikaner Division.
CONSULTANCY WORK FOR STRENGTHENING AND WIDENING OF ROAD FROM DFCCIL FREIGHT TERMINAL (GATI SHAKTI CARGO TERMINAL) AT BADHAL ITAWA VILLAGE IN KISHANGARH RENWAL TEHSIL TO NH-52 AT GOVINDGARH (1 NO RUB And 6 KM LA)
4-WAY SOCKETED COUPLER (T-JOINT) FOR DIA 20 MM PVC RIGID CONDUIT, as per Drawing: SKED-947, Alt- 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURIN
Consultancy Service for preparation of GAD including seeking approval from Railway and authorities and detailed project report (DPR) of construction of ROB at LC No 126 on railway Km 244/7-8 on Suratgarh-Bikaner Section
Consultancy Work for Preparation of Detailed Project Report (DPR) including Land Acquisition and GAD of ROB Approval form Railway for Construction of Bypass on NH-52 Ramu Ka Bas to SH-08 Kudli (As per nit)
Consultancy work for preparation of Detailed Project Report (DPR) including Land Acquisition and detailed design and drawing of ROB (2 Nos.) for Const. of Byepass Road from Barso to Tyonga in Bharatpur (Estimated Length 12.00 Km.)
Construction of Three High Level Bridges on 1.Badawali Semari Nichla Guda Road at Gomti River. 2.Saradi Gingla Road at Gomti River. 3.Dhelai Road at Saru River Distt Salumber
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode
Consultancy services required for preparing Survey/ Soil testing / GAD/Design drawing/DPR and preparation of Land Accusation Document for the work of Construction of RUB at Old LC no. 119 at Km. 137.838 at Sri Ganganagar Station .