Loading…
Loading…
43,604 results • Best match
Electrical work for Replacement of existing FOB at Bankura.
Main work Construction of Minor Bridge at Km 1/6 of Mantralayam-Nagaladinne road in Kurnool district Sub work Conducting pre survey for Construction of Minor Bridge at Km 1/6 of Mantralayam-Nagaladinne road in Kurnool district
Reconstruction of Minor Bridge at Km 48/4 and Km 54/4 of Visakhapatnam Ananthagiri Araku Road in Vizianagaram District. Sub work-Reconstruction of Minor Bridge at Km 48/4 of Visakhapatnam Ananthagiri Araku road in Vizianagaram District
Construction of Minor Bridge at Km 14/912 on Munugode - Nampally road in Nalgonda District ( sub work :- conducting sub soil investigation for proposed minor bridge at Km 14/8-10 on Munugode to Nampally road in Nalgonda District)
(i) UDN-USD section- Raising of approach walls, roads, earthworks, grouting, etc. to avoid seepage, runoff water & waterlogging on various RUB under ADEN-VYA section. (ii) UDN-USD Section Strengthening of toe wall, return wall, ballast wall, slab, ... of major bridge no ...
Construction of foot Bridge near Panch Katha hana at JK Garh Purba in JL no 212 Plot no 1350-1402 under Kamalpur GP of Daspur-II Panchayat Samity fund under 15 th CFCG.
Construction of Bilgaon Savryadigar Road VR-70 Km.0/00 to 5/300 (Retaining Walls) A) Construction of Protection Walls for Major Bridge a/c River Udai at 2/200 B) Construction of Protection Walls for Major Bridge a/c Bodhi Nalla at 2/900.
Construction of Major Bridge in Place of Existing Old British Era Bridge on Mehergaon Dhule Road (Old Mumbai Agra Road SH-15-A) Km.20/200, (Construction of Major Bridge Cum Bandhara A/C River Panzara in Dhule City Near Veer Sawarkar Statue Tal.Dist
Construction of additional major Bridge with 4-lane configuration of length 1.48 km on NH-60 (NH-14) over River Kangshabati from Km. 117.770 to Km 119.250 and additional major Bridge with 4-lane configuration of length 0.900 km on NH-60 (NH-14) over
CS for AE for Package-I, Package-II, Major Bridge over Humphrey Strait Creek, Package-VIII, Reconstruction of 94 Nos. culverts, Rehabilitation and Upgradation from Km 239.425 to Km 242.000, 5 nos. Minor Bridges on NH-4 in Andaman -2nd Call
Shifting and erection of 25 kva Substation, 3ph 3w 11 kv and 3ph 4w LT line due to Construction of HL Bridge over Chanagudi Nallah at 19/150 km on Kaintragarh Doruha Road for the year 2025-26.
Construction of HL Bridge 15 Spans 20.00 M Each (Eff) Over Ghaggar River X-ing Mubrakpur Dhakouli Road (ODR-01) including Approaches and Protection Work and 2 Year Routine Maintenance after Defect Liability Period in Distt. SAS Nagar.
Construction of HL Bridge 112.80 M long over stream between Barari and Nangal town crossing water of super passage of NH Channel including its approaches, new road portion and widening of existing road in Distt. Rupnagar (Balance Works)
MODERNIZATION OF LRs HOSHIARPUR CONSTITUENCY MARKET COMMITTEE HOSHIARPUR and Construction of HL Bridge GP NO. 5 SPECIAL CENTRAL ASSISTANCE (PHASE-II) TO STATES FOR CAPITAL INVESTMENT 2025-26 (1 Year Defect Liability period plus 4 Years Maintenance of
Construction of HL Bridge 75.51 Mtr long over Donal Khad x-ing RGN Road to Thalu Link Road including its approaches, road diversion, widening of existing road portion and dismantling of old box type bridge in District Rupnagar
Clearing and repair works to various bridges under Bridges section,Chalakudy -General Civil Work
Maintenance works for Bridges Subways Culverts Foot Bridges in South Region Zone11 to 15
Maintenance works for Bridges Subways Culverts Foot Bridges in South Region Zone11 to 15
Maintenance works for Bridges Subways Culverts Foot Bridges in North Region (Zone1 to 5)
Maintenance works for Bridges Subways Culverts Foot Bridges in North Region Zone1 to 5
Premonsoon works 2024-25- Premonsoon work of various Bridges under Bridges section Payyanur 1
GENERAL-PREMONSOON WORK 2023-2024- VARIOUS BRIDGES UNDER BRIDGES SECTION- PATHANAMTHITTA- General Civil Work
General-premonsoon work 2023-24 various bridges under Thiruvalla bridges section- General civil work
GENERAL-Pre-monsoon works for various Bridges in Bridges section Thrissur- General Civil Work
Construction of 60.550 Metre span Steel Truss Foot Bridge) ( two spans of 30.00 Metre each)
CE/EAP/ARRBP/OCB/Bridges3/Nagaon/12 Construction of Bridges in Nagaon district i) Br. No. 2/1 on Nonoi Sutargaon Nibukali Road ii) Br. No. 1/2 on KA Road to Ganjugaon Road iii) Br. No. 1/1 on Chapanala waterfalls road to Matiapahar TE
Construction of foot Bridge near Punar Jakot house of Mahadev Wada Ward of Amdalli Gram Panchayat in Karwar Taluka Uttar Kannada District. Under H/Ac 5054 KRDCL (Foot Bridge) During the year of 2025-26.
Construction of Bridge work under BSY
Construction of Bridge work under BSY
Construction of Bridge work under BSY
Construction of Bridge work under BSY.
Construction of Bridge work under BSY
Construction of Bridge work under BSY.
Construction of Bridge work under BSY
Construction of Bridge work under BSY
Construction of Bridge work under BSY
Construction of Bridge work under BSY
Formation of BT Surface For Approach Road and Electrical Arrangements at High Level Bridge Across Nallaru River Connecting Lakshmi Nagar Main Road and Poombarai in Ward No. 08 and 16
ROB Building at 76 Dr Deodar Rahaman Road Repair and Renovation work of different office rooms
CSIND -Demolishing of foundation made for temporary foot bridge at Kochupilammoodu and Clearing of debris to Contractors own dumping yard
Krishna Koyna Lift Irrigation Scheme - Construction of Foot Bridge in Kavethemahankal Canal Km 1 to 73., Tal. Miraj, Dist. Sangli
Construction of RCC foot bridge over Rangapaniacherra near Barjala LI pump under Barjala GP, Charilam RD Block(PWD SoR 2020).
Construction of R.C.C. Foot bridge at Jagatchandra para at Dumrakaridak ADC Village, Hezamara R. D. Block under RD Mohanpur Division
GENERAL-Kalamthiruthi foot bridge - Investigation work-Investigation work for the Reconstruction of Kalamthiruthi bridge at Tirurangadi LAC in Malappuram District
Providing Ramp and protection work d/s of foot bridge near Arattukadavu VCB in pampa Thriveni in Ranni Perunadu panchayath.
Maintenance of steel foot bridge near Buddhamandir at Kanchannagar GP under Bokafa RD Block, South Tripura District (PWD SoR-2023)
Constt of repairment of Foot Bridge at Khaker Fat w no 6 Pyt Manoo A Block Chilly Pingal (PRIs Grant)
Constn. of RCC Foot Bridge over Bilthai Chandra Cherra Near Kulesh Das House at Bilthai GP under Panisagar RD Block.
KUMARAPURAM GP 2023-2024 CONSTRUCTION OF IRON FOOT BRIDGE ACROSS THODU IN VARIOUS WARD PR NO 21/23-24(RETENDER)
Request for Special repair of MS foot bridge Across Nallah near house no. 144/452 in Village Mauli Jagran, Chandigarh.