Loading…
Loading…
43,338 results • Best match
Constt. of foot bridge at Mughan nallah khunoo nallah
Foot bridge, W No 5 Gura Dali, Swari Bagyalakote
Constt. Of Foot Bridge at Sara Ward No 01
Const of Foot Bridge at Mandhi W No 6
Construction of foot bridge at Bhokhim Jhora Thulo Benda.
CSIND Dismantling of old concrete foot bridge at Meerankadavu
Constt. of Foot bridge Nho mangat ram wno 3
Constt. of foot bridge near the nallah HS Nathi
Widening foot bridge in 23rd ward in Palacole Municipality
P 88/2023-24-Kuzhinjalikkunnelpadi foot bridge hand rail
Constt. of foot bridge over nallah delew slew Tannar
Repairs / reconstruction of damaged foot bridge at Lidder watt
Construction of Foot Bridge over Panjal Nalla w.no.04
Constt. of foot bridge over nallah delew slew Tannar
Widening foot bridge in 23rd ward in Palacole Municipality
FABRICATION & ERECTION OF IRON FOOT BRIDGE DURING DASARA -2023
C/O FOOT BRIDGE NEAR PYT GHAT PASWALPATI SIRENDER
Repair/Renovation of Foot Bridge behind Golf store Gulmarg.
Construction of Major Bridges SR Bridges at Krishna River for Rectification of Black Spot MH 04 218 on BHS at Km 756 395 and Construction of Flyover including a LVUP for Rectification of Black Spot MH 04 216 on BHS at Km 770 550 of Pune Satara NH 48
Constructing road at Modi ROB to Cancer Hospital
Construction of Submersible Bridge Local Nalla Penchi road Block Chachonda, Distt. Guna
Foot Bridge maintenance
Urgent Maintenance of Bridges in NH 66 Old NH 17 Muzhappilagadu ROB Moidu Bridge and Dharmadom Bridge General Civil Work
Major Repairs to Road Over Bridges ROB in Zone-VII R-S R-C and R-N Wards of W.S.
Conventional Painting for safety of bridges of TGB's & ROB in WUNI-PMKT, MJRI- RAJUR & BD-NGP sections over NGP Division.
Construction of 25 Isolation rooms Block and Roof covered foot over -bridge connection corridor between existing building and Super Specialty Block at Government Medical College- Kota, Rajasthan and their maintenance during defect liability period.
Construction of Bridge work
3. Construction of Minor Bridge at Kolhapur Ambewadi Chikhali Varanage Padali Yevaluj Bajarabhogaon Anuskura road SH 193 k.m.38.00 Tal. Panhala Dist.Kolhapur.
4. Construction of Minor Bridge across Khadaki nalla On Donoli Charan Saidapur Theragaon Kodoli road MDR.6 at K.m.1.450 Tal.Shahuwadi Dist.Kolhapur.
Construction of Minor Bridge and Improvement to Warud Kanka Road VR 10 KM 0/00 to 3/00 Tq. Mehekar. Dist. Buldana
Construction of Minor Bridge to Approch Road Bahaddarpur to Ganori Road At Ch. 0/400 on VR-26 Tq. Bhatkuli Dist. Amravati
Bridge Repair to MIDC Major Bridge on Road from NH- 4 to Shahu Naka Kalambe Balinge Chikali Top Shiye Kasaba Bawada Road SH -194 at Km. 32/900, Tal. Karveer, Dist. Kolhapur
Bridge Repair to MIDC Major Bridge on Road from NH- 4 to Shahu Naka Kalambe Balinge Chikali Top Shiye Kasaba Bawada Road SH -194 at Km. 32/900, Tal. Karveer, Dist. Kolhapur.
Construction of RCC Foot bridge over Gamaichara Melkabari Twigrwng School near the house of Paritosh Debbarma S/O- Ganga Charan Debbarma at Purba Champacherra VC under Tulashikhar Rd Block as per (PWD SoR 2020).
Package No. CE/EAP/ARRBP/OCB/Bridges-2/Barpeta/03 Construction of Bridges in Barpeta district i) Bridge No. 3/2 on Saderi, Nityananda, Anandapur, Sathisamuka Road ii) Bridge No. 1/1 on Bhati Ulua BhogeswariMandir Road
Construction of Submersible Bridge including approaches on Sirsod-Toda road, at km 2/4 across Mahuar Rivernear Sudeshwar Mahadev Mandir in District Shivpuri
Construction of RCC foot bridge over Howrah river on the way of Jirania Madhyabazar to cremation Ghat at Jirania RD Block
Constt of Foot Bridge at Jhuri Dhari Block Chilly Pingal 2nd Call
Supplying, Installation, Testing , Commissioning of 2 Nos. 20 Passengers Lifts , other Electrical Installations at Foot Over Bridge Rani Jhansi Road near Jhandewalan, New Delhi.
Re-Construction of Street with Cement Concrete M-40 grade from F.C.I. main gate to foot over bridge, Ward no. 19, M.C. Karnal (Recall)
Construction of Foot over Bridge in between Metro Pillar No. 299 and 298 at Miyanwali, Udyog Nagar Metro Station on Rohtak Road (NH-10).
Construction of Foot Over Bridge connecting the Critical Care Block and The Exiting Government District Head Quarters Hospital Campus at Cuddalore in Cuddalore District
Supplying, Installation, Testing and Commissioning of 13 Passengers Machine room less Lift on Foot over Bridge at Kardampuri, Yamuna Vihar on Road No. 66
Provision of Foot Over Bridge (6.0 mtr wide) with 2 Nos lift at Kaptanganj and Ramp (2 Nos. Each) at Duraundha, Chaurichaura & Ekma Stations
Construction of Foot Over Bridge on Old Post Road In Front Parkale Bunglow(Sutar chal to Vidhaya Partishthan Gate in Baramati Nagar Parishad. Tal.Baramati.Dist.Pune
Operation and Comprehensive maintenance of lift installed at Foot over bridge located on PWD roads in Transyamuna area of East Delhi during 2023-24
pune manapache foot over bridge, bhuyari marg v vahantal sabve yethe dekhbhal durustichi kame, surksha kanre, tasech vividh prakarchi kame, BRT surksha vyavstha karne.
Construction of Foot Over Bridge near IDA Uppal/ New Modern Bakery ,Uppal with O&M of two years in Hyderabad City on EPC Mode
SDF-2021-22-Providing of Foot Over Bridge from Old Hospital to New Hospital in Banswada Town of Banswada Assembly Constituency in Kamareddy District
Dismantling of Iron Foot Over Bridge between Gate No. 3 and 4 of Baba Mast Nath University of Old NH-10 in District Rohtak.