Loading…
Loading…
43,373 results • Best match
Constt of Foot Bridge at Sanwara Pyt Sanwara Block Chilly Pingal
2019-20 anuual plan- Poovathi Moideekuttipadi Foot bridge Reconstruction in chaliyar
CONSTRUCTION OF FOOT BRIDGE OVER WATER CHANNEL NEAR MORSALIM LASKAR HOUSE
Construction of Foot Bridge at Bohipora (access way) near Bohipora Bridge
Construction of Foot bridge at Pongnarey Kholcha in Sita Dungay Gaon
Construction Balance Work of Foot Bridge at Takenwari (Under Languishing Projects).
Construction of Foot Bridge on Bonar Nallah near Panchayat Ghar Kralpora.
Reconstruction of Foot bridge at Nalanda Nagar in Ward No.41
CONSTRUCTION OF FOOT BRIDGE NEAR GULELU IN KABBINALE VILLAGE HEBRI TALUK
Construction Foot bridge at Bidralli in Dongri Gram panchayat Ankola Taluk
Construction of Foot bridge Madanmaddi nala in Hattikeri panchayat Ankola Taluk
Construction of Foot Bridge at Ninnipadpu Narikombu Village in Bantwal taluk
Construction of foot bridge at Alangarupadi Sarapady village in Bantwal taluk
CONSTRUCTION OF FOOT BRIDGE AT KELABARKE IN MUDRADI VILLAGE HEBRI TALUK
Construction of foot bridge at Kalmale Veerakamba village in Bantwal taluk
CONSTRUCTION OF FOOT BRIDGE NEAR DONNADKA IN KERVASHE VILLAGE KARKALA TALUK
Reconstruction of Foot bridge at Nalanda nagar in Ward No.41
RESTORATRION OF FOOT BRIDGE AT VIRGAN RAFTING POINT MOVERA BLOCK PAHALAGAM
Construction of Submersible Bridge Pachmadhi River Kunda to Dateya Block Radhogarh, Distt. Guna
Request for Qualification of Consultants/Consultancy Firms for Empanelment Under Engineering Consultancy Services for Preparation of DPR for ROB/RUB/Flyover/BOT projects/PPP Projects
Construction of RUB in Lieu of ROB at LC 43 km 71/21-23 near Samalkha Railway station under Delhi Ambala Division in Panipat District
HUBBALLI DIVISION: Carrying out of field survey, preparation of conceptual plan & GAD for elimination of LC gates by ROB/RUB in UBL division.(62 Nos).
Construction of HL Bridge over PANDRA nallah at 0.50 K.M. on Bartanda to Solopur PS road under BSY in the district of Jajpur for the year 2021-22
Construction of HL Bridge over GHODAHADA nallah at 0.410 K.M. on Bhaliajhola to Nua Jayanagar Road under BSY in the district of Ganjam for the year 2022-23
Construction of Bridge across LLC at Km 2.60 on Kurugodu-Sirigeri Road in Kurugodu taluk under 5054-Improvements to Bridges on MDRs
Construction of Foot Bridge on G.B.C. near Village Bisharpur Kudasahi.
Construction of one foot bridge
SPECIAL REPAIR WORK OF HIGH LEVEL BRIDGE ACROSS JAMNI RIVER ON MOHANGARH-TALBEHAT ROAD AT GHUNGHTAGHAT. (DISSTT-TIKAMGARH)
Construction of Minor Bridges i Bridge over Dharwala Nallah at RD 137/080 on NH 154A and ii Bridge over Kamnallah at RD 147 780 on NH 154A in the State of Himachal Pradesh on EPC Mode
RE- CONSTRUCTION OF MINOR BRIDGES ON TALANI - SAPTI - KOHALI - SHIRAD - PEVA - UNCHEGAON - BHANEAON TONH-361 - KOTHALA - HAADGAON SH-416 CH. 5/000, 5/800 AND 10/200 TQ. HANDGAON DIST. NANDED (UNDER FDR PROGRAMME YEAR 2021-22)
Construction of Wharfwall coal loading system along with construction of Railway formation, Minor bridges, drains, supply of P. way materials and track linking work and road connectivity in connection with proposed MGR loading yard at NTPC-Talaipalli
Consultancy Services for DPR Preparation on EPC mode for Construction of Minor Bridges at Km 265 Pandaydih Km 268 Manjhidih and Km 277 Chhachando of NH 114A in the State of Jharkhand for the year 2021 22
Reconstruction of Minor Bridges on SH-249 to Shellal Tondchir Murki to State Border road MDR-34, at Km. 1/420, 4/200, 5/320, 6/310, 8/070 and 8/910 in Tal-Udgir, Dist-Latur
Providing and Fixing In Position structural Steel Foot-Bridge at various chainages on Main Canal of Dahigaon Lift Irrigation Scheme Stage II.
Construction of RCC foot bridge over Gomati River at Kamrangatali Bazar under Mohanbhog R.D. Block, Sepahijala District, Tripura during FY 2025-26
Construction of Bridge on Jaitpur to Parela Road). Construction of Submersible Bridge Across Satabdi River in K.M 1/6 on Jaitpur-Parela Road Including Approach Road And Protection Work. Distt. Sagar
MOEI, Pump, Lifts of Subway, Under Deck and FOB on Delhi PWD Roads under PWD Electrical Division South during 2021-22. (SH- Comprehensive Maintenance of 02 Nos. Lifts installed at FOB Jia Sarai, New Delhi.)
Construction of Major Bridge at Km 20/00 on MDR 62 from SH 271-Jalgaon Jamod-Wadshingi-Madakhed Bk-Chondhi-Kakoda-Kalamkhed-Jastagaon to SH 269 Road, Tal. Sangrampur Dist.Buldhana. Under Nabard
This estimate is prepared as part of Annual plan 2025-26 in Thirunelly Gp for the Proj.no-367-Construction of Begoor Anganavadi foot bridge At Ward IX for RS- 400000. Currently there is a wooden foot bridge.
RCC FOOT BRIDGE
Construction of minor bridge 3x6 m (height 05 m) in place of the damaged minor bridge on Dhasan main canal at SALARPURA
Construction work of a minor bridge (4x5m. span) in place of damaged minor bridge in Km-3 of Gonda Khair Road (ODR)
Construction of minor bridge 3x6 m (height 05 m) in place of the damaged minor bridge on Dhasan main canal at SYODHI
Replacing the Existing pumping main from Old R & B Minor bridge to New Minor bridge at KM 108/6 Narsipatnam Bheemunipatnam road
Replacing the Existing pumping main from Old R & B Minor bridge to New Minor bridge at KM 108/6 Narsipatnam Bheemunipatnam road
Construction of Road Over Bridge (ROB) on Changefal Bhendwal Bhastan Matergaon Khamgaon Road Km. 12/400 (New Km.29/600) At. Railway Level Crossing no. JK-6 Railway (Ch. 545/13-14) (SH-222) Tq. Khamgaon Dist. Buldhana
Electrical(G) works for Construction of Road Over Bridge (ROB) (At Km: 79/31-33) between Khirai and Haur in lieu of LC No. 49 at Km 79/17-19 on Howrah-Kharagpur section of South Eastern Railway.
ADB-PAL-BR-04 Proposed Improvement and five year Mainte. of 1)High Level Bridge on road from Poshera Khoch to Chandrachimet Road at ch 0/900 2)High Level Bridge on road from Poshera Khoch to Chandrachimet Road at ch 3/375 Taluka Mokhada Dist.Palghar
ADB-PAL-BR-03 Proposed Improvement and five year Maintenance 1) High Level Bridge on road from SH 78 to Kochale at ch 0/150 2) High Level Bridge on road from SH 78 to Kochale Kiniste Kashti at ch 4/180 Taluka- Mokhada Dist- Palghar
Construction of High Level Bridge Across Dehar River in km 1/6 on Khatola-Kothikhoh Road I C Approach Road and Protection Work Distt Sagar MP