Loading…
Loading…
43,375 results • Best match
Construction of Bridge work under BSY
Annual Repair works for Bridges and approaches in Bridge Sub Division Gwalior M.P.
Annual Repair works for Bridges and approaches in Bridge Sub Division Bhind M.P.
Annual Repair works for Bridges and approaches in Bridge Sub Division Shivpuri M.P.
DEPOSIT-Eravipuram For the construction of ROB-Pipeline WorkFor the construction of ROB-Utility shifting of Eravipuram For the construction of ROB-Pipeline Work
Construction of RCC foot Bridge over River Bamanjhora under Hatighisha GP in Naxalbari Block
REHABILITATION OF BRIDGE IN JAYANAGARA SONALE BILLODI MDR CH 4.30KM IN HOSANAGARA TALUK SHIVAMOGGA DISTRICT
CE/EAP/ARRBP/OCB /Bridges-3/ Dibrugarh /02 Construction of Bridges in Dibrugarh District i.Br.1/1 on Deroi Natun Line to Namupather Rd ii. Br.2/2 on Tingkhong Sripuria Rd iii. Br.1/1 on Dewachali Rd
CE/EAP/ARRBP/OCB/Bridges-3/Karimganj/02 Construction of Bridges in Karimganj district i) Br. No. 1/1 on Cheragibazar to Kotamoni Road ii) Br. No. 1/1 on Nivia to Maguracherra iii) Br. on Kalibari Chutokuna Road
CE/EAP/ARRBP/OCB/Bridges-2/Goalpara/03 Construction of Bridges in Goalpara district i.Br. No. 1/1 on Latapara (Darakh) to Sarapara Road ii.Br. No. 1/1 on Bolbola Bodahpur Hatigaon Road Kokira to Kalinidoba road via borvita
Construction of Foot Bridge A Kadneeru Barmagadde
Construction of Bridges on Road from Balaji Ankoda to Babasagar via Nayakapuguda of Chintalamanepally Mandal of Komaram Bheem Asifabad District, Est. Cost Rs.200.00 Lakhs, SDF 2018-19 Grant.
Improvements to ballast siding including earth work in forming ballast depot, track work for extension of ballast siding, construction of bridges and retaining wall at Tiruturaipundi and Villupuram stations.
External Painting of i) Suphala Bagging Plant building, ii) Foot Over Bridge from SAP to ANPB in Rashtriya Chemicals and Fertilizers Ltd. Factory at Chembur, Mumbai-400074
Open e-tender for the work of "Provision of Foot Over Bridge at Dasharathpur, Kajra and Bakudi stations over Malda Division under Senior Divisional Engineer- III/Malda".
Construction of RCC lift shaft for 13 Passenger Lift of the Foot Over Bridge at Azadpur, Delhi under Sub Division NR-12, North Roads Division, PWD, Delhi
Disposal of temporary rights of display of advertisement on Foot over bridge Side A- Airport to Dufnala side near old Cantt Board dispensary building on Airport road
Disposal of temporary rights of display of advertisement on Foot over bridge Side B - Dufnala to Airport side near old Cantt Board dispensary building on Airport road
Shifting of sewer line in Sayajigunj Railway Colony and near Foot Over Bridge outside of Vadodara Railway Station in connection with Mumbai Ahmedabad high speed rail project
Construction of Foot over Bridge across the major nala and Laying of approaches in 31-Rein Bazar, Santosh Nagar Circle-7, CRZ, GHMC (Recall) Rs. 17.50 Lakhs
LAC-ADS-LAC- ADS 2023-24 Investigation work for the Construction of Foot over bridge across Ithikkara river at Ananchal Kadavu in Kollam District-Investigation-Investigation Work
Regarding Construction of Foot Over Bridge at Chainage 34.700 Km. near Kheri Gandia Govt. School, Tehsil Rajpura on NH-07 in the State of Punjab (2nd Call).
Repair to HL Bridge over local Nallah -Huluhulia Nallah- at 0.320 km on foot over Bridge on NH-60 to Nagram GP_Road_ Dry Stone pitching_At 0.320 km
Capacity Restoration from Km. 287.940 to Km. 291.940 and Repair of Bridge, Construction of Stairs and 300 Mtr. Piching both bank in U.G.C. Distt. Aligarh
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 9/2 OF MADAVANAGAR-SOORANAM ROAD IN LIEU OF EXISTING CAUSEWAY
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 2/4 OF KALAKAD - CHITHAMBARAPURAM ROAD IN LIEU OF EXISTING CAUSEWAY
Construction of High Level Bridge at Km 0/2 of Vijayapathi - Koothankuzhi road in lieu of existing causeway
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 10/8 OF MADAVANAGAR-SOORANAM ROAD IN LIEU OF EXISTING CAUSEWAY
Construction of High Level Bridge at Km 8/8 of Sakkottai Paravayal Road in lieu of existing causeway
Construction of High Level Bridge at Km 17/8 of Mudukulathur Veeracholan Road in lieu of existing causeway
Construction of High Level Bridge at Km 0/2 of Samusigapuram -Vadakarai road in lieu of existing Causeway
Construction of High Level Bridge at km 15/2 of Udaiyarpatti - Seevalaperi Road in lieu of existing causeway
Construction of High Level Bridge at Km 17/10 of Radhapuram - Idayankudi road in lieu of existing causeway
Construction of High Level Bridge at Km 4/8 of Sirugavayal Thalaiyur Road in lieu of existing causeway
Construction of High Level Bridge at km 109-2 of Srivilliputhur - Sivakasi - Virudhunagar - Aruppukottai - Thiruchuli - Narikudi - Parthibanoor Road
Construction of High Level Bridge in lieu of Existing causeway at km 3/10 of Sundavilai - Vadankkankulam Road
Construction of High Level Bridge at Km 16/10 of Mudukulathur Sikkal Road in lieu of existing causeway
Construction of High Level Bridge in lieu of existing causeway at Km 3/0 of Umarikottai - Dhalavaipuram road
SUB SOIL INVESTIGATION FOR CONSTR OF 120 MTR MULTI SPAN PSC BOX GIRDER BRIDGE OVER CHIRIL RIVER
Repairs and rehabilitation to existing Bowstring girder Bridge on the IBP Road in Western Sector(2nd call)
Design and Construction of 1x20 mtr intermediate lane composite girder bridge at Aragam Bandipora on EPC MODE
Construction of 36 meter span steel girder bridge over garud ganga river at Machhibagad gwalde motor road
Construction of 16mtr steel girder bridge over Dhossa Nallah near Baina Masjid ( uphill side of TKN Road)
Construction of road from Tarigam to HS Bugh including construction of 1x48 Mtr Span Truss Girder Bridge
24M. Span Steel Girder Bridge at Km 2 of Joljivi Madkot Mt. Rd. to Kauli Kanyal L043
Reconstruction of Single span steel girder bridge at K.M. 26.435 of SYL Canal in Kurukshetra District Haryana.
Design and Construction of 1x50 Mtr Span Trussed Girder Bridge over Nallah Ningli near Shrunz Water Fall.
Construction of 36 meter span steel girder bridge over garud ganga river at Machhibagad gwalde motor road
Construction of 1x 50 m Single Span Trussed Girder Bridge with approaches at Waz-Mohalla.(Balance Work)