Loading…
Loading…
43,386 results • Best match
Special Repair to Construction of HL Bridge Over Local Nallah on PWD Road to Sanatundi Road ( 2 X 21.75 m span) for the year 2023-24.
Construction of HL Bridge over NUAGAON NALLAH at Ch 14_850 km on Sankarakhole_Khajuripada Road in the district of Kandhamal under State Plan for the year 2023_24
Construction of HL Bridge over DUDUKI NALLAH at Ch 26_700 km on TCNB Road in the district of Kandhamal under State Plan for the year 2023_24
T02-PMGSY SADAK MATHIYA TO SARODAY TOLA TAK (VR39) CONSTRUCTION OF HL BRIDGE AT CH 16 120 KM IN PMGSY SADAK MATHIYA TO SARODAY TOLA TAK
Construction of HL Bridge 3 Span 9.353 M each Eff. over Jhambo Wali Choe x-ing Link Road Badalgarh to Nawagaon RD 2700M in Distt. Sangrur
Part A Sankola to Shapara Bangal Seema Via Mahananda Nadi. Part B Construction of HL. Bridge Sankola to Shahpara Bengal Seema With Approch Road 50 M
Hiring consultancy for technical ........ for the work of Construction of HL Bridge 04 Span, 20 meters, each over river Tangri x-ing road Syamtoo to Amrala
Construction of HL Bridge over River Kalipang Nallah at Ch 19_850 km on Masripada_ Kelapada_ Sadingia_Balandapada Road in the District of Kandhamal for the year 2022_23
Construction of HL Bridge over Gangua Nallah on Jagannath Nagar Koradakanta Road No.8 in the Dist. of Khurda under BSY for the year 2023-24
Construction of HL bridge over Local nallah on Chuakankar to Badhunia road in the District of Mayurbhnaj under Setu Bandhana Yojana for the year 2024-25.
Construction of HL Bridge over Kala nallah near Baliura at 4th Km on Kaliapal to Jalisuan Road in the district of Deogarh under Biju Setu Yojana
Construction of HL bridge over Khadangoda nallah on Kitabeda to Dhodasahi road in the District of Mayurbhnaj under Setu Bandhana Yojana for the year 2024-25.
Construction of HL Bridge over Safei Nallah on Korua to Dhanamandal road in the District of Kendrapara for the year 2025-2026 under Setu Bandha Yojana
Approach Road, Service Road and Nali Work at ROB 5C Bangla Bazar Lucknow
Construction of 24.00m Span Steel Girder Bridge at Km. 5.00 Chalmori Garha to Kalota Motor Road with 5 Year Maintenance
Construction of 60 m Span Steel Girder Bridge on Munar to Gasi Motor Road with 5 Year Maintenance, Kapkot, Bageshwar
70 meter Span Bridle Bow String Steel Girder Bridge with approach way from Tonde. Mahadev Temple to Shri Raghunath Temple Sangam Ghat Devprayag and 45 meter Span Bridle Steel Girder Bridge with approach way from Namami Gange Pro. to Tonde. Mahadev
13.1 Construction of Bridge on Sule to Akurde Road VR-48 over Dhamani River Tal.Panhala Dist.Kolhapur.
Construction of Bridge on Shirambe Nigadi Apshinge Ambheri Velu Sathewadi Road ODR-85, at Km 6/500, Tal-Koregaon, Dist-Satara
IMPROVEMENT AND CONSTRUCTION OF BRIDGE TO KOPARA TO MARWALI ROAD V.R.46 KM 0/00 TO 4/00 TQ. NAIGAON KHAI
Construction of foot bridge and VRB near village Pathuriasahi andDugal
Repairs to Bridge/Culvert and App. under P.W.D. Sub Dn Betul.
Repairs to Bridge/Culvert and App. under P.W.D. Sub Dn Bhainsdehi.
Repairs To Bridge Cum Bandhara At Borda Tq Tiwasa Dist Amravati
FOOT BRIDGE
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:05). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast Supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between SIGADAM (SGDM-KM:785.00) excluding to KM:819.60 (including VIZIANAGARAM station) of Waltair Division in East Coast Railway.
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:03). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding Major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast Supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between Naupada Jn. (NWP-KM:702.20) excluding to KM:740.00 (including URLAM station) of Waltair Division in East Coast Railway.
Construction of 3rd Line between Naupada (NWP) and Vizianagaram (VZM): (Package:04). Execution of Earthwork in formation, blanketing, Minor bridges (Excluding Major bridges with formation in approaches for 100 meters length on either side and other connected protection works) LCs, LHS, RUBs, drains, Protection works, FOBs, Service buildings, Platform works, Passenger amenities, Track Ballast supply, P.Way works and other connected ancillary works etc,. along with OHE & General electrification works and S&T utility shifting works in connection with 3rd Line between URLAM (ULM-KM:740.00) excluding to KM:785.00 (including SIGADAM station) of Waltair Division in East Coast Railway.
Maintenance of foot bridge
1.) Provision of minor bridge protection works (Wing wall, curtain wall, return wall & apron) of PSC slab bridges in jurisdiction of ADEN/PBE in IZN division of N.E Railway. (MLN-PBE sec. Br. No.-269, 270, 314, 315, 317, 318, 319 = 07 nos. of Bridges).
Formation of Approach Road from Km 84/4 of G.W.T Road (NH 48) from Ch 0000 4 270 including Construction of Minor Bridges at CH 780, 260, 200 and Box Culverts to SIPCOT Industrial Park , Panapakkam, Ranipet District.
Viramgam - Samakhiali Section - Rebuilding of minor bridges (09 Nos.) 82 DN, 170 UP and DN, 175 UP, 185 UP, 93 UP, 103 UP, 145 UP, 164 UP under the jurisdiction of Senior Divisional Engineer (West) Ahmedabad (Re-invited)
IMPROVEMENT TO SAWANGI PIMPALGAON VALAN ADGAON PAL WAKOD MAHALKINHOLA TO MDR-5 ROAD MDR-19 KM 0/00 TO 3/00 AND CONSTRUCTION OF MINOR BRIDGES AT KM 0/800 AND 1/400 (BAZARSAWING SHIRODI ROAD ) TQ. KHULTABAD
Earthwork in Railway formation including filling a cutting, Blanketing and Construction of Major and Minor Bridges, Box pushing, P-way Track linking including supply of Railway track ballast and P-way materials, fittings, Point an Crossing, drain etc
CONSTRUCTION OF MINOR BRIDGES IN MANGRUL CHINCHPUR BAHULI HATTI MOHOL UNDANGAON ROAD MDR-4 IN KM 3/200 NEAR MANGRUL VILLAGE, IN KM 14/500, IN KM 20/200 NEAR MOHOL VILLAGE, IN KM 20/800 TQ. SILLOD
Electrification Work of ROB- 62 Asfabad crossing to Fatehabad Road on Kanpur-Tundla Rail Section 1228/25-27 in distt. Firozabad.
Repair and maintenance of various bridges in Una Sub-Divn.No.I HP.PWD. Una (SH Painting on Lalsingi bridge Foot bridge near DAV school and MS railing including painting on both side approaches of Rampur bridge)
Construction of High Level Bridge at Km 13/6 of Paruvakudi Kovilpatti Ettaiyapuram Vilathikulam Vembar (PKEVV) (SH 44) Road
Construction of High Level Bridge at km 0-2 of Kattanarpatti - V. Muthulingapuram Road in lieu of existing Causeway
Construction of High Level Bridge at Km 2/6 of Chithirampatti District Frontier Road in lieu of existing Causeway
Construction of High Level Bridge at km 10/6 of NH-210 Anandur Road in lieu of existing causeway
Construction of High Level Bridge at Km 10/2 of Kanniseri to Mathiyasenai road in lieu of existing causeway
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 3/2-4 OF VELAYUTHAPATTINAM - NEDUNKULAM ROAD IN LIEU OF EXISTING CAUSEWAY
Construction of High Level Bridge at km 5/4-6 of Thalaiyur - Siruvatchi Road in lieu of existing Causeway
Construction of High Level Bridge in lieu of the Vented Causeway at km 1-8 of Thovalai - Thalakudi Road
Construction of High Level Bridge at Km 20/10 of Kadambur - Puliyampatti - Deivaseyalpuram road in lieu of existing causeway.
Construction of High Level Bridge at Km 2/8 of Kattanarpatti to V.Muthulingapuram Road in lieu of existing causeway
Construction of High Level Bridge at km 20/10 of Paruvakudi - Kovilpatti - Ettaiyapuram - Vilathikulam - Vembar (PKEVV) (SH 44) Road
Construction of High Level Bridge at km 5-8 (i) of Erumaipatti - Thumbaipatti Road in lieu of existing Causeway
Construction of High Level Bridge at Km 9/8 of Kayathar to Kalugumalai road in lieu of existing Causeway