Loading…
Loading…
43,418 results • Best match
Construction of foot bridge and CC footpath walkway at Km 0.700 of RBHLC
Construction of foot bridge and CC footpath walkway at Km 0.700 of RBHLC
CONSTRUCTION OF FOOT BRIDGE NEAR KADARI KOPPALA MANE IN MUDARU VILLAGE KARKALA TALUK
Construction of Foot Bridge at Kijanaru Narsikumeru, of Badagakajekaru Village in Bantwal taluk
Construction of Foot Bridge near Pangala Tungerbailu in Innanje Village, of Kapu Taluk
CONSTRUCTION OF RETAINING WALL TO FOOT BRIDGE NEAR BANUR VILLAGE IN KADUR TALUK.
CONSTRUCTION OF FOOT BRIDGE ACROSS SUVARNAVATI RIVER AT KATTEGANIGANURU VILLAGE IN YELANDUR TALUK
Construction of Foot bridge near Sunkadamane Anitha Shankara house at ward no 11
Construction Foot bridge to Melinguli nala in Vasare kudrage Gram panchayat Ankola Taluk.
Construction of foot bridge in Bellangi near Vanadurga temple road in Alkod Panchayat.
Construction of foot bridge on Kirkalli Halla In Hethuru GP In Sakleshpur taluk.
Construction of foot bridge on Sombralli Halla In Hethuru GP In Sakleshpur taluk.
Construction of foot bridge and CC footpath walkway at Km 0.700 of RBHLC
CONSTRUCTION OF FOOT BRIDGE NEAR VILLAGE BALIDANDI OVER NUANAI CREEK ON MANTEI RIGHT
Constt of Foot Bridge near Bazru Da Gharat, Panchayat Malad, Block Lohai Malhar
RECOUPING OF RAILING OF FOOT BRIDGE AT KM 7.000 OF SARYU LINK CHANNEL
Construction of foot bridge near Hoige dadda of Pilimogru village in Bantwal taluk
Construction of RCC Girder Bridge Over North Koyal River in Daltonganj to Chainpur Road in Chainpur Block under Road Division, Daltonganj for the year 2025-26
Construction of Foot Over Bridge (3m wide) connecting all Silos of Kusmunda in connection with the work of Kusmunda Opencast of Kusmunda Area , Dist-Korba , Chattisgarh
SH- C-o substructure and approaches of 35mtr Span of foot bridge
Painting the existing 7 nos of Foot Over Bridges and rectification of the damaged structural Portions of the FOB at Indira Nagar, Kandanchavadi, Perungudi, Seevaram, Mettukuppam, PTC and Karapakkam Km 1.3 to 10.9 including cost of materials and labor
Supply of POT PTFE Bearing for Construction of 02 Lane ROB at Level X ing No 504 at km 1354 23 25 Rail Section on NH2 to UPSIDC Road in distt Agra (As per IRC 83 Part III) 2002
(Bridge Zone No. 17 of 2026-27) - New Works and all ordinary repairs and maintenance work up to Rs. 5,00,000.00 of each for bridge work including Road Over Bridge under the jurisdiction of ADEN (North) Vadodara (Re-invited) (R-1).
SCR Construction Organization: Hyderabad Division: Proposed Doubling between Mahbubnagar - Dhone stations - (i) Earthwork in formation including blanketing to IRS GE:0004 specifications, (ii) Construction of Major/Minor Bridges & UBs, Retaining wall, ... COPS, FOB and ...
Composite work for Execution of earthwork in Formation & Cutting, Construction of Minor Bridges, New Platform, Extension of FOB, P.Way Track Linking Works, supply of Ballast, EI Building, other service Buildings, Approach Road, side drains, Protection works, shifting of ART/ARME location etc. complete in connection with the Yard Remodeling works at BKSC station yard including electrical works as per the approved ESP & SIP in Adra Division of S.E. Railway.
Composite work for Execution of earthwork in Formation & Cutting, Construction of Minor Bridges, New Platform, Extension of FOB, P.Way Track Linking Works, supply of Ballast, EI Building, other service Buildings, Approach Road, side drains, Protection works, shifting of ART/ARME location etc. complete in connection with the Yard Remodeling works at BKSC station yard including electrical works as per the approved ESP & SIP in Adra Division of S.E. Railway.
Modernization of 1st floor -Electricians and 2nd floor -Weapon mechanics and Electricians FOB Building NY
LANDSCAPING AND BEAUTIFICATION WORKS AT LEFT FLANK OF CANAL FROM FULBARI TO ROAD OVER BRIDGE JALPAIGURI
Agra aligarg road over bridge ke pass bhagwan parushram chore ka nav nirman and sondarikaray karya.
Construction of Road Over Bridge at Railway Crossing no 50 on Lasudiya Mori Road Distt Indore.
CIVIL WORKS FOR CONSTRUCTION OF ROAD OVER BRIDGE AT MAHOBA-KHAJURAHO SECTION OF NORTH CENTRAL RAILWAY
CONSTRUCTION OF ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING NO. 476 IN BANDA-MANIKPUR SECTION
Maintenance of Electrical Consumption charges of Street Lighting on PWD Roads under North West Zone, Delhi. SH Providing Services of Lift Operators and Security Guard at Shiva Market FOB
CE/EAP/ARRBP/OCB/Bridges-3/Biswanath/01 Construction of Bridges in Biswanath district i.Br. No. 1/1 on Dolonguri to Majulligarh Road ii.Br. No. 1/4 on Veloguri to Balijan Road iii.Br. No. 3/1 on Balichang Purona Hospital to Dillichang Village
CE/EAP/ARRBP/OCB/Bridges-3/Barpeta/10 Construction of Bridges in Barpeta district i.Br. No. 1/1 on Kumaliapara to Garemari Rd ii.Br. No. 3/1 on Dabaliapara to Baniarapara Rd iii.Br. No. 1/1 on Palahartal Bazar to Balartari Bazar Rd
CE/EAP/ARRBP/OCB/Bridges-2/Kamrup/15 Construction of Bridges in Kamrup district i.Br. No. 1/1 on Kolajol Balahati Road to Bhairabeswari Mandir Road at Behbari Village ii.Br. No. 2/2 on Dhuhi Jahnabari Bagals Road to Harmabari Milan LP School
Construction of Bridges with approaches to NH-211 to Dasegaon Dadpimpri Devali Dondigar Hirapur Ganeshpur to Patana road, MDR-41 in Km. 25/600 (Between Pimpri to Ganeshpur village) Ta.Chalisgaon Dist. Jalgaon
Construction Of Bridges And Raising Of Roads From Dhalgaon Khairi To Kelwad, Dhalgaon Khairi to Saoner and Chorkhairi to Raiwadi Under Submergence Of Kanhan River Project (Kocchi Barrage) Ta. Saoner Dist. Nagpur.
Consultancy services for Preparation of Detailed Project Report including LA and Other clearances for Construction of Bridges over Kataiya Hydel tail race and canal on NH131 106 in the State of Bihar.
Construction of Bridges at 23rd Km,33rd Km,35th Km and 41st Km of NH-220 for the year 2020-21 in the state of Jharkhand on EPC mode under NH(O).
Construction of Bridges (2 Box Culverts) on Sindagi-Kodangal (SH-16) KM 57.00 and KM 66.00 in Shahapur Taluka, Yadgir district. Under, 5054 Karnataka Road Development Corporation Limited Capital Expenditure 2025-26.
(A) S&T work for Replacement of old FOB by new FOB at Sirathu (SRO) Railway station of Prayagraj Division. (B) Signalling work for Construction of RUB in lieu of Level Crossing No. 13 at KM 836/6-8 in Bharwari Station Yard of PRYJ-CNB section.
CONSTRUCTION OF HIGH LEVEL BRIDGE AT KM 5/8 OF OYYAVANDAHAN to KANJIPATTI ROAD (VIA) ORUPOKKI, KALKULAM, PONNAKAL IN LIEU OF EXISTING CAUSEWAY
Construction of Semi - Permanent Office Building of Sub Division-II near IIT Foot Over Bridge on Sri Aurobindo Marg under Division South Road-II, PWD, New Delhi during 2025-26.
Ratlam Division - Electrical work in connection with raising of platforms at Pachwan (PF01), Parbati (PF01) and 04 meter wide Foot Over Bridge with 02 ramp landings at PNWN and PRB.