Loading…
Loading…
43,441 results • Best match
Construction of High level bridge on road from NH44 @ 24/0 Km to Boravelly village of Manopad(M), Jogulamba Gadwal district - Est.Cost Rs.25.00 lakhs
Construction of High Level Bridge across Ukachettu Vagu and Providing BT road from Apparala to Tippdampally of Kothakota (M) Wanaparthy District, Estimate cost Rs.510.00Lakhs
FDR to construction of High level Bridge (4 vents of 10.0M) at KM 6/4-6/6 on Molongur to veenavanka road in Karimnagar District
Construction of High Level Bridge across Thenpennaiyar at Km 1/5 of road branching from Thagadi Thiyagadurgam Manalurpet road connecting Thirukoilur Manalurpet road at Pillayarpalayam
Construction of High level bridge at Karaivetti - Vilagam - Elantahikudam road Across Andiodai Vadigal in Thirumanur Block of Ariyalur District under NABARD RIDF XXVII 2021-22
Construction of High Level Bridge over Bagdaro River at Ch 1100 of Kano to Madankatta via Mahuatand, Murlipahari, Baskupi, Badia Road under Road Division Deoghar
Construction of High Level Bridge including approach road across Parvati River at (Borkheda Village) on Kothari-Nipaniya-Maina-Polaya Road KM 6/2 District Sehore
Construction of High Level Bridge over Baskijore Nala at chainage 5th km in Sarath - Chitra Road (including construction of approach road) under Road Division, Deoghar
Construction of High level Bridge at Km 2/6 of the Road from Kallimandayam - Edayakottai Road to Thopputhottam Bus Stop in lieu of existing causeway
Construction of High level Bridge at Km 0/6 of Salem - Thirupathur - Vaniyampadi Road to Goundampatty Road across Peeniyaru River in lieu of existing Causeway.
CONSTRUCTION OF APPROACH ROAD FROM R/SITE URDANA TO AGRICULTURE LAND OF SARDAR SINGH AND NANURAMS, INCULDING HIGH LEVEL BRIDGE TEHSIL MANAWAR DISTRICT DHAR M.P.
CONSTRUCTION OF MAJOR HIGH LEVEL BRIDGE A C ARUNAWATI RIVER IN KM 43 700 ON MAHATOLI SHIVANI LONI MALHIWARA ROAD MDR8 TQ DIGRAS DIST YAVATMAL
Package No.AP06PIIINUZLB 01Construction of High level Bridge on road from Chintalacheruvu to Andugulapadu via Lingamukkapalli in Nuzendla Mandal of Palanadu District (Erst while Guntur District)
Providing Consultancy sevices for preparing DPR for construction of High Level Bridge across Eluru canal at Km.0/0 of Atkuru - unguturu in Krishna District
Construction of High Level Bridge across Thandava River at Km.7/8 of Kottam to Kotananduru road (via) LD Peta in Kakinada District (3rd Call)
Completion of incomplete high level bridge across vagu in the road from Valasa road junction to Ravvagedda of Y.Ramavaram(M), Estimate Cost Rs.40.00 lakhs
Conducting Survey Investigation Designs and Drawings for Construction of High Level Bridge in Km 3/2.4 of Radio Station of Peddaputta road in YSR district.
Construction of High Level Bridge across Thandava River at Km.7/8 of Kottam to Kotananduru road (via) LD Peta in Kakinada District (2nd Call)
Construction of High Level Bridge Including Approach Road Across Bah River in KM 33/6 on Vidisha Kurwai Road Near Village Kagpur in District Vidisha
Construction of High level bridge on tributary of river Krishna from Thotlavalluru to Pamulalanka of Pamarru Constituency in Krishna District , Estimate Cost: Rs.3155.00 Lakhs
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS UPPU KALAVA CROSSING AT KM 7/2-4 OF VENKATACHALAM - MUTHUKUR ROAD TO THIRUMALAMMA PALEM IN SPSR NELLORE DISTRICT
Construction of High Level Bridge 80.96 Meter Long Over Hargarh Choe crossing Hoshiarpur Bye Pass to Hargarh Dhugga Sandra to Nasrala Nandachaur Road including approaches
UT-2-10-Construction and Maintenance (5 years) of 30 Mtr. Span Steel Girder Bridge at Km-7 of Kapkot-Pindari Glacier MR Km 18 to Mikila Khal Pata, L048 AND UT-02-09- Construction and Maintenance (5 years) of 30 Mtr. Span Steel Girder Bridge at Km-1
CONSTRUCTION OF HIGH LEVEL MAJOR BRIDGE WITH APPROACH ON ANAV GHATACHEPED TO MANJAREKARWADI TO ORAS HEAD QUARTER ROAD V.R. 124, TAL-KUDAL, DISTSINDHUDURG (TAKING TRIAL BORES FOR BRIDGE)
Survey Of Major Bridge On National Highway To Vahagaon Ghonashi Koparde Haveli Parle Banawadi Road ODR- 125 At KM 0/400, On Krushna River Tal-Karad, Dist-Satara
Construction of 36.00m Span Steel Girder Bridge at Km 1.00 of Garur Block to Matena-Jinkhola Motor Road with 5 Year Maintenance, Garur, Bageshwar
Construction of 36.00m Span Steel Girder Bridge at Km 1.00 of Garur Block to Matena-Jinkhola Motor Road with 5 Year Maintenance, Garur, Bageshwar
Construction of 36.00m Span Steel Girder Bridge at Km 1.00 of Garur Block to Matena-Jinkhola Motor Road with 5 Year Maintenance, Garur, Bageshwar
RCC Foot bridge
Shifting of 250/150mm dia water supply pipe lines at Vinayaka Veedi, Malakpet due to construction of approach roads to proposed Malakpet RUB including Minor Bridge under Azampura section, Sub Division-I of Operations and Maintenance Division-II (A)
Construction of Minor Bridge at km 0-2 of NH 210 - Vattanam Road
Construction of Minor Bridge at Km 0-8 of Palayanoor to Vallarendal Road
Construction of Balance work of One No. RUB/LHS with Approaches in lieu of LC-05 (RUB/LHS) B/w Godhra-Kansudhi Stations and Construction of Balance work of One No. ROB at LC-32 b/w Piplod-Limkheda Station in the State of Gujarat
Construction of 50m submersible bridge on 90 GB to Binjor road
CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS BAGERI RIVER ON SANDALPUR - GOVINDPURA ROAD
CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS CHAMLA RIVER ON BEED - DHANIYAKHEDI ROAD
CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS MADHUKANYA RIVER ON KUMBHAKHEDI UMARKOAT ROAD
CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS PAMPAWATI RIVER ON KHARAWAD CHAPALDA ROAD
Repairs to Bridge on Saundane Kalwan Borgaon Surgana Umberthan to Gujrath State Border Road SH-22 at Km. 90/750, Tal. Surgana, Dist. Nashik (Balance Work of Bridge)
Construction of CC Drains for a length of 60.00 mtr near Kanthari Amman Temple Ch 674.00 mtr at Burmanallah Rural Road under SDIII CDIII APWD, Prothrapur. Sub Work Renovation of foot bridge at Beodnabad
Construction of Minor Bridge
Construction of Foot Bridge across the Seegehalla canal Ghatethavaru village in shivamogga Taluk.
(1)Construction of Minor Bridge MDR-67 to Karanje Devalaya Someshwar Karkhana Wanewadi Murum MDR. 68 Near Karanje Gaothan Smashanbhumi (2) Construction of Bridge Mouje Hol Limbkar Wasti Gitewasti To SH-121 VR-165 Gitewasti (3) Construction of
Repairs to Minor bridge in Km.5/100 On MDR-64- Saykhed,Chinchari,Wasadi, Hadiyamahal, Sonbardi to Near Jamod Village join to SH 47 road Tq.Sangrampur (Under FDR Programme)
Repairing ana Painting RUB of Dahibazar Railway Station RUB in SatranjiPura Zone 07.
Consolidation carpet work Dhillon Colony RUB to Khalsa Colony RUB Ward No. 17
Construction of HL Bridge 3 span 8.00 M eff.over Jalalabad drain at RD 13485 crossing link road from Ferozepur Fazilka road to Mahu Begu Near Village Mahu Begu in District Ferozepur
Construction of HL bridge over local nallah on NH-49 to SH-50 (Manicha to Dhipusahi) road in the District of Mayurbhnaj under Setu Bandhana Yojana for the year 2024-25.
Shifting of HT line for the work Construction of HL Bridge over Local Nallah at 1 st Km on Kapasira to Gogua road in the District of Deogarh Non res building
Main work STRENGTHENING OF VIJAYAWADA NUZVID ROAD FROM KM. 4.800 TO 19.000 IN KRISHNA DISTRICT. SUB WORK: Providing chequered tiles on ROB at Singh NAgar and two bridges