Loading…
Loading…
1,470 results • Best match
Construction of Minor Bridge (Box type -4 Vents of 4m span with 2.5 Height) at Km 4/4-6 of Thallada-Pinapaka road in Khammam District.
Construction of 3 V of 10 mts span Minor Bridge at Km 8/2-4 on road from NH44 to Domakonda (via) Peddamallareddy in Kamareddy District.
Re Construction of Minor Bridge in place of Low level causeway at Km 14/2 on Kammarpally to Bheemgal road in Nizamabad District under FDR Scheme.
Re-Construction of minor bridge (Box type) in km 7/0 of Sathupally Patwarigudem road in Khammam District (2 cell of 4 X 3M box culvert)
Re Construction of Minor Bridge at Km 2/6-8 on Kamalapoor PWD road to Rampoor via Narsinghpoor in Nizambad District under FDR Scheme.(2nd Call)
Providing toe wall to Quadrents for minor bridge at Km 52/6-8 of Mahadevpur - Mukunur - Kanakanur-Kataram road (Palimela to Mukunur) in Jayashankar Bhupalapally District
Procurement of 60T lorry weigh bridges along with 3 years CMC
PROCUREMENT OF METRIC WEIGHTS (20KGS) FOR WEIGH BRIDGES AT MM AREA
Construction of ROB in lieu of LC No 20 at Railway km 139/6-7 of secundrabad-wadi section and at km 18/6-10 of chevella-Shankarpally road in Ranga Reddy District. (Sub work:Improvements to Chevella-Shankarpally Road from km 18/900-19/800 and ... new Minor Bridge on ...
Construction of ROB inlieu of L.C. No. 49/A at Railway Km 275/46-48 of Kazipet 0 Ballarsha Section in Peddapally Dist. Sub work :- Conducting Sub soil Investigation work for ROB (2nd Call)
Restoration of Storm Water Drain, damaged due to sliding of excavated trench at RUB Uppuguda.
Laying of VDCC road at RUB, Bible house under ward 147-Baansilalpet, Div-30.GHMC
Procurement of RUB SPIR FLEX HOSE 200MM WE FLG 40KG/CM2 for OC2, RG3 area
Premonsoon desilting and annual maintenance of open nala from Laxmamma foot bridge to Brandawan colony via Achute Reddy Lane culvert in Adikmet Division, Ward No. 1, Division - 15, GHMC (5th call)
Consruction of High Level Bridge at Km 3/550 - 3/650 on Somini - Kamargaon via Talai, Muraliguda from Km 0/0 to 20/0 in Asifabad District. Sub-work : Preliminary sub-soil investigation work for the proposed construction of HLB (proposed for 9 vents of 10 m)
Emergency Repairs to Expansion Joints of High Level Bridge across Manair River at Km 0/8 of Approch road to Tanugula Bridge road in peddapally district. Sub Work :- Painting to Tanugula Bridge at Km 0/8 of Manair River of approach to Tanugula bridge in Peddapally district
Development of road infrastructure viz, a Flyover, High level Bridge and an underpass at Yellandu in Bhadradri Kothagudem district (Bridge) Seu work : providing for scarifing, caution boards, village name boards, guard stones and guide posts etc., for fly over on dumping yard JK-5 OC mine road
Re-Construction of Minor Bridge of 2 V of 10m eff span at km 9/8-10 of Kuravi -Jangiligonda road in Mahabubabad District under FDR Scheme.
FDR-Construction of Minor Bridge (1 vent of 6.0m effective span) at km 11/0-2 on NH44 to Ramadugu via Yanampally, Suddulam road in Nizamabad District.
Re-construction of Minor Bridge 1 vent of 10.0 mtrs at Km 2/7 on Assembly - LB Nagar road near Old P.S Begum Bazar (with steel girder)
Construction of Box type Minor Bridge of 4V of 5M X 3M at Km.1/2-4 on Dubbak to Meet Medak - Siddipet road in Siddipet District
Junction improvement on ROB Link Road at km 2/0 (Ursugutta) in warangal urban district
Beautification and development of Central median from Chaderghat signal to Dabeerpura ROB Circle-06,CRZGHMC.
Providing Plants on the ROB from Mayuri Centre to Jubilee Club in Khammam Municipal Corporation
Providing painting to crash Barrier, Kerb and BC Overlay for approaches to ROB at Kukatpally
Construction of Bridges on (i) Shankarpaly-Marpally Road from Km 9/4-6, Km 12/8-10, Km 16/0-2, Km 20/0-2, Km 25/4-6, Km 31/8-10, Km 36/6-8, Km 36/8-10 (ii) Budhera-Marpally Road from Km 12/4-6 in Ranga Reddy District(Now falls in Newly formed Vikarabad District)
Construction of approach road to (1) ROB at km.311/6 to 312/4 on Old NH7 road for railway bridge No.773, (2) ROB at km.0/100 to 0/900 of Armoor -Bheemgal road for Railway over Bridge No.771 in Nizamabad district. Sub-work:- Providing Consultancy ... work ROB 773.
Construction of additional ROB & Geometrical Improvements and Strengthening of Existing ROB and Approaches from km 0/0 to 1/0 in Vikarabad Town limits at Railway Km 111/6-8 on Secunderabad-Wadi Section connecting Vikarabad District Head Quarter to ... for ROB and
Construction of Bridge Culvert in W.No. 03 in Sathupalli Municipality under Municipal General Funds.
Construction of Bridge at Lothunur of Gollapally (M) in Jagitial District Est.Cost.Rs.200.00 lakhs
Supply, Installation and Commissioning of 2 Nos. Elevators (on either side of road for FOB near NTR Marg)
Construction of New BG line between Bhadrachalam road and Satupalli Station for ROB No.50 on Vijayawada - Jagadalpur NH-30 Road (Proposed ROB) at Km 93/2 to 93/4 in Bhadradri Kothagudem District (2nd Call)
(i) Construction of Bridge at km 7/600 between Borlagudem and Reddipally villages,Jayashankar Bhupalapally District (ii)Construction of Bridge at km 8/200 on Road from Borlagudem to Reddypally in Jayashankar Bhupalapally District
Construction of Bridge at Km 18/6 on Sirpur - Methaldini Road in Asifabad District. Sub-work : Preliminary sub-soil investigation work for the proposed construction of Bridge (proposed for 5 vents of 10 m)
A) Hyderabad Division: SC-MUE section: Proposed construction of natural drain at RUB in lieu of LC No.213B) Hyderabad Division: SC-MUE section: Proposed construction of additional U Type retaining wall at RUB in lieu of Lc No 231C) Hyderabad ... at RUB in ... at RUB in ...
Construction of approaches to RUB at Hi-tech city Railway Station near existing bridge no.215
Supply and Delivery of NEW 90W LED street Light sets for RUB poles in Mahabubabad Municipality.
Laying of 450mm Dia D.I Pipe Line at Railway Under Bridge (RUB) in Nizamabad Municipal Corporation
Thematic wall painting to Anandbag RUB Ceiling in Goutham Nagar, ward no.141, Malkajgiri circle-28
CRR Package of 10 No. Bridge works in Kodad and Huzurnagar Assembly Constituencies of Suryapet District(3rd Call)
ER to Re Construction of damaged Revetment for the protection of road embankment of Minor bridge at Km3/4-6 on Tallarampur to Gummiryal road in Nizamabad district.
Construction of minor Bridge across main canal @ KM 0/0-2 on PWD road to Elkalapally via Kannala( in place of exisitng narrow & damaged culvert) in Peddapally District
Construction of additional vent of RUB near Malakpet at km 6/0-2 on Assembly - LB Nagar Sub work - Laying of Approach road and construction of sump ( with sensor pumps) to drain rain water at New RUB Malakpet
FDR to Construction of 10 Vents of 10 m span High Level Bridge at Km. 24/8-10 in between Bollaram & Akkaram Villages and 3 Vents of 6 m Span Box Culvert at Km. 21/4-6 on Dindi-Deverakonda Road to Kambalapally Road in Nalgonda District (2nd call)
Widening and Strengthening of Nalgonda - Devarakonda road to Kurrampally via Regatte from Km 0/0 to 11/8 in Nalgonda District (construction of High level Bridge at Km 2/8-10 on Nalgonda - Devarakonda road to Kurrampally via Regette in Nalgonda District) (sub work conducting sub soil Investigation
Improvements by forming 6-lane road from Laxmi Talkies junction to old Mancherial to meet NH-63 at km 166/2 on NH-63 road and from Rangampet to Andaldevinagar in Mancherial District. Subwork: Consultancy Services for Preparation of Detailed Project ... 6-lane High level Bridge .
Premonsoon desilting and annual maintenance of open nala Laxmamma Park foot bridge to Brindavan Colony via Achute Reddy lane in Adikmet Division, Division - 15, Sec-bad Zone, GHMC (5TH CALL) (Rs. 16.60 lakh)
Annual maintenance of open nala from Laxmamma Park Foot Bridge to Brindavan Colony via Achyuth Reddy lane in Adikmet Division 85 Ward No 1 Division 15 SBZ GHMC (2nd RECALL) Rs.24.00 lakhs
E.R to ROB at Km 114/0-2 of Nakrekal to Mallampally Road of NH-365
Widening of BT Road from Newly Constructed ROB approach to Vittal Nagar Junction in Kyathanpally Municipality