Loading…
Loading…
1,470 results • Best match
Construction of Minor Bridge to unconnected ST Habitation from Somaram Thanda to Kothabadi Thanda road at Km 0/6-8 in Somaram Thanda GP in Gandhari Mandal of Kamareddy District .
Construction of ROB in Lieu of LC No. 28 on Secunderabad - Kazipet section at Railway Km 237 / 14-16 on Bhongiri - Jagadevpur road in Km 1 / 0-2 in Nalgonda District. Sub work: Providing ROB and service road lighting (4th call)
Construction of ROB in liew of LC No. 13/T at Railway Km 70/3-5 of Secunderabad - Wadi Section in Tandur Town Municipal Limits in Vikarabad District. (Sub Work: Conducting Sub-Soil exploration work for proposed ROB)(2nd call)
Construction of ROB in lieu of L.C. 34 at Railway Km 304/14-16 of Kazipet -Ballarsha section on Sulthanbad - Kalvasrirampur road at Km 11/6-8 in Peddapally Dist. Sub Work :- Conducting Sub - Soil investigation work for ROB (2nd Call)
Construction of ROB in lieu of L.C.No.1 at Railway Km 362/22-24 of Kazipet -Ballarsha Section on Hanamkonda -Malkapur road at Ch.7/6-8 in Warangal Urban District Sub -Work: Conducting Sub Soil Investigation work for ROB
Construction of ROB in lieu of LC No. 73 at Devarakadra village limits at Rly KM 138/3-4 of Devarakadra-Kaulakuntla section and road KM 22/6-8 of Mahaboobnagar - Raichur road in Mahabubnagar District. Sub work : Providing ROB lighting.
Construction of ROB in lieu of L.C No.67 at Railway Km.391/4-6 of Kazipet - Vijayawada section on Ookal - Thorrur road at Km.7/0-2 in warangal Rural District. Sub - Work: Conducting Sub Soil Investigation work for ROB
Construction of Four Lane ROB in Zaheerabad Town in lieu of LC No.32 Railway KM 60/10-11 of Vikarabad - Parli section in Medak District ( Newly formed Sangareddy District) Sub Work : Providing Street Lighting on ROB and service roads
HYB Division:-Proposed Extension of FOB at Basar Railway station in connection with the work of " BSX-Prov of PF No 4,shelter(COP), retaining wall and extension of exg FOB to PF 4 as part of dev of new holding area on account of Pushkaram.
Laying of SW Drain 600mm dia from Uppuguda RUB towards Uppuguda Jenda in Uppuguda Div. - Rs.8.55 Lakhs
Maintenance of greenery at RUB Central Media and landscaping in Cir-28, Malkajgiri, Sec'bad Zone, GHMC (1st Recall).
FDR to RUB Approaches in Km 3/4-6 on Gajwel - Cheguta Road in Siddipet District (3rd call)
Re-construction of Collapsed wall at RUB Balkampet in 100-Sanathnagar, Circle-17, KZ, GHMC (Item No.05)
Development of Central Median from New Office Building, Raghunath Bund and RUB at Kanteshwar in Nizamabad Municipal Corporation
Providing of Theme Based Mural Graphic Painting on New RUB Kanteshwar Railway Kaman Wall in Nizamabad Municipal Corporation
Construction of 11 Foot Over Bridges and 01 Skyway at Charminar Zone (Package II)
Package No.01/DPR/Bridges/03 works in Kothaguda, Est Cost Rs.33.97 Lakhs
Package No.02/DPR/Bridges/02 works in Gangaram, Est Cost Rs.14.70 Lakhs
Civil works for erection of 2 Nos Lorry weigh bridges at VKCM, Kothagudem area
Construction of 11 Foot Over Bridges and 01 Skyway at Charminar Zone (Package-II)
1) Provision towards OHE modifications in connection with ROB at HSP-OPL station (LC-12), 2) Provision towards OHE modifications in connection with ROB at OPL-JMKT station ( LC-18), 3) Provision towards OHE modifications in connection with ROB at ... with ROB at ...
1) Provision towards OHE modifications in connection with ROB at HSP-OPL station (LC-12), 2) Provision towards OHE modifications in connection with ROB at OPL-JMKT station ( LC-18), 3) Provision towards OHE modifications in connection with ROB at ... with ROB at ...
Widening and strengthening of Bhainsa-MH Border from km 0/0-1/4 and 8/2-18/0 (Including Minor Bridge at Km 12/4 and 13/8) in Nirmal District
Flood Damaged Repairs for Construction of body wall minor bridge approaches at Km 99/8-10 Mahadevpur - Mukunur - Kanakpur - Kataram road (Near Chintakani village of Kataram Mandal) in JS Bhupalpally District.
Re Construction of Minor Bridge in place of in sufficient HP Culvert at Km 3/0-2 of Mendora X road to Rudrangi via Manala in Nizamabad District under FDR scheme.
Re Construction of Minor Bridge at Km 16/8-10 in place of H.P. Culvert 10 Rows of 800 mm dia on Armoor Bheemgal Road in Nizamabad District under FDR Scheme.
Filling of Gravel on both sides of ROB at Swagath Restaurant in Gadwal Municipality under Municipal General Funds
Consultancy services for investigation, Non Destructive testing, rehabilitation methodologies for adikmet ROB at Jamia Osmania Railway station, Secunderabad.
C/o ROB @ KM 76/4 of Khammam - Devarapalli road in Khammam Dist. Sub-work : Conducting Topographic Survey
Consultancy services for investigation, Non Destructive Testing, Rehabilitation Methodologies for Bharath Nagar ROB, Moosapet circle Kukatpally Zone, CMC.
LAYING OF CC ROAD NEAR FOB ON JNTU ROAD IN KPHB COLONY IN WARD NO. 114 OF MOOSAPET CIRCLE-23, GHMC
Providing of Decorative lighting to Film Nagar Junction and FOB in Jubilee Hills Division of Jubilee Hills Circle-18, KZ, GHMC.
Construction of High Level Bridge at Km 6/8-10 on Asifabad - Tiryani Road including approach from Km 6/6 - 7/220 in Kumaram Bheem Asifabad District. Sub-work : Preliminary sub-soil investigation work for the proposed construction of HLB at Km 6/8-10 (proposed for 4 vents of 8 m span)
Erection of Intermediate towers (132KV NMS) between tower Loc.No.38/27-38/28 and (132KV NB+3) type tower between tower location No.38/25/A to 38/25/1 of 132KV Chandrayangutta - Moosarambagh - Imlibun feeder for Improving the Ground clearance for ... constructed High level bridge at ...
Annual maintenance of open nala from Laxmamma Park Foot Bridge to Brindavan Colony via Achyuth Reddy lane in Adikmet Division 85, Ward No. 1, Division 15, Sec-bad Zone, GHMC (Rs. 24.00 Lakh) (6th Re-Call)
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 KM per month round the clock 24 x 7 Vehicles required for SSE Bridges Secunderabad, SSE Bridges North Kazipet and SSE Bridges South Kazipet total 3Vehicles; Outstation 24*7
Construction of Bridge at Nala in Srinagar colony road no. 3 in W.No.16 in suryapet muncipality
Construction of Bridge at Km. 0/0-6 on Edulur-Thakkellapadu Road in Nalgonda District (Balance Work)
Construction of Bridge on road from Dedinenipally to Chinnakarpamula, Peddakothapally Mandal, Nagarkurnool District.Estt cost Rs.210.00 lakhs
Construction of Bridge on road from Govindaram to Odded of Medipally of Jagtial District Est.Cost.Rs.80.00 Lakhs
Construction of Bridge on road from Chilkepally to Mailaram, Pangal Mandal, Wanaparthy Dist.Estt Cost Rs.330.00 lakhs
Construction of bridge on road from Bodapuram to Tippapuram at km 2/400 Venkatapuram Mandal, Mulugu District
Construction of Bridge at Km 0/4-6 at KCR Nagar in Palvancha in Bhadradri Kothagudem District
Construction of ROB in lieu of L.C No. 40 at Railway Km 291/8-10 of Kazipet - Ballarsha sction on Peddapally Goureddypet road at Km 0/6-8 in Peddapally Dist. Sub Work :- Conducting Sub - soil Investigation work for ROB (2nd Call)
Construction of ROB in lieu of LC No.01 at Railway Km 362/22-24 of Kazipet to Ballarsha section on Hanamkonda to Malkapur road at Ch 7/6-8 in Warangal Urban District Sub-work: Conducting Preliminary survey for ROB work
Construction of ROB in lieu of L.C No.64 at Railway Km.381/28-30 of Kazipet - Vijayawada section on Hanamkonda - Narsampet - Mahabubabad road at Km.7/4-6 in warangal Rural District. Sub - Work: Conducting Sub Soil Investigation work for ROB
Construction of ROB at Cherlapally in lieu of LC No.12 of Railway Km 206/28-30 of Secunderabad- Kazipet section in KM 0/2-4 of Cherlapally to meet NH 202 road in Rangareddy District. Sub work : Providing Electrification to ROB
Construction of Third BG line between Bellampally - Mandamarri in Kazipet Ballarsha section Construction of 2 lane ROB at the existing bridge No 165-A (Srirampur - Mandamarri Road (MDR) at Km 18/8-10) in Mancherial District. Sub work : Providing ... to ROB
Construction of ROB in lieu of L.C.No.60/E at Railway Km.369/14-16 of Kazipet - Vijayawada section on Fathimanagar to Mamnoor road at Km 0/8-10 in Warangal Urban District Sub -Work : Conducting Sub -Soil Investigation Work for ROB
Rebuilding of Existing 2 Lane ROB (RHS) to 3 Lane ROB at Railway Km.102 / 3-4 Crossing the NH - 44 Chainage 86/200-300 Near Divitipally Village on Hyderabad - Bangalore section of NH-44 in the state of Telangana on EPC Mode