Loading…
Loading…
1,472 results • Best match
Providing of Central Lighting from RUB anandbhag to Maithri cafe with 16 Sqmm 4 Core XLPE cable and accessaries in Ward 139 EastAnand Aagh Division of Malkajgjri Circle-28, Secuderabad Circle, GHMC. (29 numbers Octogonal 9.0 mtr poles and 5 numbers brackets supplied by the department) ( Quantity of materials may be varied as per field condition)
Construction of entrance Gate with Security Room, Providing Weighing Bridge, Construction of Office room, Drilling of Borewell, Laying of Pipeline, providing and installation of Street lights of the proposed scientific solid waste management park at Arutla village near Gundla Machnur in Sangareddy under 15th FC Grants
Package No.5/67/CRR (6 works) in Thorrur, Peddavangara (M) of Mahabubabad district- Pack EC Rs.740.00 lakhs 1) BT Road from Chikataipalem to Peddamupparam of Dantalapally Mandal upto High Level Bridge, Thorrur(M) EC Rs.120.00 lakhs 2) Road from (MRL11) PWD Road Somaram to PWD Road Mahabubabad at Madipally Bus Stop via Gurthur, Kantaipalem and Madipally in Thorrur Mandal EC Rs.230.00 lakhs 3) BT Road from Authapuram to Kishtapuram, Peddavangara(M) EC Rs.100.00 lakhs 4) BT Road from Padamati Thanda to Vavilala, Peddavangara(M) EC Rs.100.00 lakhs 5) BT Road from Chinnavangra to Chinna Mangya Thanda, Peddavangara(M) EC Rs.100.00 lakhs 6) BT Road from Chinnavangara Muthyalamma Tmple to Mondi Kunta, Peddavangara(M) EC Rs.90.00 lakhs
Construction of ROB in lieu of LC No.113E across railway line at Km.505/28-30 of Kazipet-Vijayawada section in Km.6/4-6 of Kazipet-Vijayawada section in Km.6/4-6 of Kazipet-Vijayawada section in Km.6/4-6 of Chintakani-Nagulavancha road in Khammam District Sub-work:-Pre-survey work
E.R for Paver Patches to ROB Link road from Km 0/0 to 2/6, MGM-Pochammamaidan road via Autonagar road from Km 0/7 to 2/7 , Autonagar to NH 202 road from Km 0/0 to 1/380 and Hanmakonda -Narsampet - Mahabubabad road from Km 2/6 to 5/0 in Warangal Urban District (BY HMP)
Construction of ROB in lieu of LC No. 62/T at Battalabazar in Warangal town limits at Railway Km 376 /2-4 of Kazipet-Vijayawada section and at Km 6/8-10 of Hanumakonda -Khammam road and connecting hunter road at Km 5/6-8 in Warangal District. (Balance work). Sub work : Providing Bridge Lighting (5th call)
FDR to (R&B) roads in GWMC limits (Package-2) in Warangal Urban District (By HMP). 1)ROB Link road from km 0/0 to 5/560. 2)Hunter road from km 0/0 to 6/220. 3)Kazipet - Peddammagadda road from km 0/0 to 8/2. 4)Travellers Bungalow road from km 0/0 to 2/241.
Laying of 300 mm dia SWG sewerage line from H.No. 8-2-133 St. Marrys School to Plot No. 12 H.No. 8-15-96/102/1 at Shastripuram Railway gate to facilitate construction of ROB work under Mailardevpally section, SD-II, O&M Division-XVI, Rajendranagar. (Reservation earmarked for Schedule Caste, As per G.O.Ms. No: 59, Dtd: 21.05.2018)
Construction of ROB in lieu of L.C. no 73 at Devarakadra village limits at Rly Km 138/3-4 of Devarakadra koilkuntla section and road Km 22/6-8 of Mahabubnagar Raichur road in Mahabubnagar District (sub work for construction of service roads for towards Raichur side of Mahabubnagar Raichur road in Mahabubnagar District) (2nd Call)
Consultants for the work Consultancy Services for To provide third party quality assurance and Quality control for the infrastructure works like buildings/roads/water supply lines/sewer lines/storm water drains/ Bridges/Electrical items like cable for service connections, central lighting, bore well parts etc in Khammam Municipal Corporation limits, Khammam
Consultants for the work Consultancy Services for To provide third party quality assurance and Quality control for the infrastructure works like buildings/roads/water supply lines/sewer lines/storm water drains/ Bridges/Electrical items like cable for service connections, central lighting, bore well parts etc in Khammam Municipal Corporation limits, Khammam
Consultants for the work Consultancy Services for To provide third party quality assurance and Quality control for the infrastructure works like buildings/roads/water supply lines/sewer lines/storm water drains/ Bridges/Electrical items like cable for service connections, central lighting, bore well parts etc in Khammam Municipal Corporation limits, Khammam
Improvements to NH 7 to Nuthankal Road from Km 0/0 to 5/1 = 5.10 Kms, and Improvements to NH 7 to Ravalkol thanda from Km 0/0 to 4/0 = 4.0 Kms and Improvements to Bahadurpally to Bowrampet Road from Km 0/0 to 4/0 = 4.0 Kms in Ranga Reddy District(Now ... span Minor Bridge at ...
Construction of Catchpits near RUB Vaishali nagar, Hafeezpet ward no.236,Miyapur Circle-48, Slp Zone, CMC, Budget Year 2026-27
Widening from two lane to four lane of Raigiri - Yadagirigutta from Km 0/0 to 6/3 including Construction of 2nd ROB at Km 1/4-6 in Nalgonda District Sub Work: Construction of Main carriage way form Km 5/4 to 5/7 and Service road from Km 3/8 to 5/7 in Yadadri Bhongir District (Sub Estimate: Road Safety Interventions)
Annual Maintenance of Balkapur Nala - Desilting work by Manual Means Under Slab Portion Nalas and Under Bridges From Bridge No.21 (H.No.10-06-319/100/A) to Bridge No. 35 (Bismilla Kirana Store), in Ahmednagar -74, Ward N0.-10,Circle-12, KZ,GHMC for the year 2019-2020.(9th Re-call)(Item No.01)
Maintenance of Central Median at Shlipa Avenue, RUB and Buddha Vertex in Circle -52, Kukatpally, Kukatpally Zone, CMC for the 12 Months
Providing Civic amenities in view of Ramzan festival for the year 2024 by laying of CC road for approaching road at Fakhruddin Majid from a) H.No. 10-5-372/A to 10-5-367, b) at Jaweriya Kirana store near Bada bridges under 74-Ahmed nagar division, Ward-10, Circle-12,KZ,GHMC. (Item No.6) 4TH RECALL
Consultancy services-Enumeration of number structures by way of Digitization survey ( With out actually conducting field survey) by Geo-referencing & superimposition on the existing structures like Buildings, Bridges, Permanent ,Temporary and other structures in Musi river boundary and Buffer Zone of Musi river from Gandipet(Osman Sagar) to ORR (East) Gowrelly and Himayath Sagar to Bapughat Sangam.
Manufacture, fabrication, supply and delivery of 1700mm internal diameter MS pipe line for casing using 22mm thick MS plate and pipe line tunneling work through pipe jacking or any specialized technique by excavation, boring and cutting of hard rock, ... at ROB , ...
New crossing station between Kamalnagr and Udgir station- Earth work in formation, construction of new bridges, extension of existing Bridge, Laying and Linking of BG track, assembling and insertion of points and crossings, supplying, leading and dumping of stone ballast Construction of RBG Building, Approach Road and other miscellaneous works for proposed New crossing station between Kamalnagr and Udgir station.
Construction of footpath on i) Shafilguda lake junction to Karkhana Sai Baba temple (2.0 kms), ii) Nacharam Mallapur road to Moula ali Flyover (1.0 km), iii) Radhika X roads to Balajinagar Dumping Yard (7.0 kms), iv) Uppal Nalla Cheruvu to Nagole or ... NFC ROB to ...
Package II/CRR/(3)Works/Peddapally/Estimate Cost Rs.235.00 Lakhs. 1)Shivapalli to Narsalahpalll Road Shivapalll Orra Cheruvu Canal HLB Eligaid(M) of Peddapally District Estimate Cost Rs85.00 Lakhs. 2)Rangapur to Raghavapur road bridge on agulla orea ... orea high level bridge Peddapally(M) ...
Repairs to Storm Water Drain and Laying of RCC pipeline at Drain beside Arts College RUB in Boudha Nagar Ward no. 172 of Tarnaka Circle-43,GHMC.
Laying of CC Road from Sri Vani Vidyaniketan School to RUB Lalithabagh in Kalika Nagar in Jangammet Ward No.74, Jangammet Circle-24 (Recall) - Rs. 50.00 Lakhs
Project Management Consultancy Services for Preparation of Detailed Project Report, Pre-Construction Activity and Project Supervision for Construction of Major bridge for the service road on either sides of ORR and Formation of new Service road from ORR Exit No.18A interchange upto Narsingi Ring along Musi River
Attending damaged stretches by BT from (1) Sanjeev Reddy Garden to Laxmi Enclave Junction, (2) Saran Nagar road to Church Hall, (3) Bollarum Bazar market road to RUB, (4)Kotha Basthi main road to Culvert, (5) opposite Sai Dhaba to Bandam, (6)Opposite model market to Colony gate,(7) Alwal Hills Road no. 11 to St.Pious School, (8)Macha Bollarum Shop to Skypex ., etc in ward 133 of Alwal Circle-27, GHMC.
Construction of box drain and laying of CC road at RUB near Venkateshwara colony in Serilingampmally Ward No.227, Serilingampally Circle-49, Serilingampally Zone, CMC (Item No.2)
(A)a) S/R of BT road from Dhobighat signals to Lucky hotel junction via IS Sadan Junction b) Laying pipe drains, providing footpaths, table drains and lane marking from Dhobighat signals to Lucky hotel junction via IS Sadan Junction in 37-Kurmaguda ... Yakutpura RUB via ... Yakutpura RUB via ...
Widening of Single lane roads to Double lane road to Connecting Mandal Head Quaters to District Head Quarters for a Amangal Nagarjunasagar PWD Road from Km 0/0 to 16/2 in Mahabubnagar District b Amangal Charkonda Road from km 0/0 to 2/8 in ... of Bridges geotechnical ...
Special Repair of approach of RCC Bridge located at Km 116.712 and road embankment at Km 122.600 beside Khowai river for the road of Khowai to Teliamura NH-208 in the state of Tripura in the FY 2022-23
Maintenance of Multi Level Avenue Plantation (MLAP) at RUB to Hafeezpet road and Induvilla Opposite Road in Circle-23, Moosapet, kukatpally Zone, GHMC for a period of (12) months
Maintenance of Greenery on RUB Central Median at Utham Nagar at Ward 183, Malkajgiri circle-05 in Malkajgiri Zone, GHMC for (12) months during the year 2025-26-1st Recall
Laying of Road from Head Post Office to Petrol Bunk at West Fort in Greater Warangal Municipal Corporation Warangal limits in Warangal District i. Hunter road from Km 4/2 to 6/2 ii. Fort road via Chinthal Matwada Diversion road from Km 1/0 to 2/550 ... chinthal ROB on ...
Conducting survey using Network Survey Vehicle for the work Reconstruction/widening of High Level Bridges at design chainage Km 35.331 and at Km 35.771 of Hyderabad-Vijayawada section of NH-65 (old no. 9) to 8-Lane configuration including development of stretch from design chainage Km 34.930 to Km 36.400 of NH-65 (old no. 9) to 4/8 lane on EPC mode under Annual Plan 2019-20 ( 5th call )
(1) Formation of Approach road from PR Cement factory Kistapur X road to Venkatayapalem road form Km 0/0 to 3/7 in Mellacheruvu Mandal in Suryapet District (working reach from Km 2/4 to 3/7) (2) Formation of earthen road from Kistapur R&R centre - ... (3) Construction of Bridge at ...
Supply, Erection, Testing, Installation, Commissioning and stamping of 02 Nos pit less Electronic In-Motion Weigh Bridges of 140 MT capacity along with spares (as per RDSO specification No. WD-29-MISC-19 Rev-01 including all Amendments as on the date of opening of Tender) i.e., 01 No. on the line of KTPS Stage V , VI and 01 No. on the line of KTPS Stage VII (1X800MW) at Paloncha, Bhadadri Kothagudem (Dist), Telangana
Attending badly damaged BT stretches at 1) Rukmini enclave kaman to andhra bank , 3) Panchasheel road no 19, end to existing BT road , 5) internal lanes of panchasheel enclave to presidency avenue , 6) kowkoor village main road at function hall , 7) ... to rub at ...
(a) Laying of CC road from H.No.2-2-1123/1/A to H.No.2-2-1123 at Narsimha Basthi RUB, Nallakunta Ward-81, Amberpet Circle-16, GHMC (b) Laying of CC road from H.No.2-2-1125/1 to H.No.2-2-1125/43 and from H.No.2-2-1125/180 to opp. Mutton shop, Nallakunta Ward-81, Amberpet Circle-16, GHMC (c) Laying of CC road from GHMC 255 to GHMC 248 at Narsimha Basthi, Nallakunta Ward-81, Amberpet Circle-16, GHMC. (Recall)
CRR 2022-23 Package-IV (3 Nos works) in Gollapally & Pegadapally (M) of Jagitial District Est.Cost. Rs.310.00 Lakhs 1)Road from PWD road to Kasthurba School at Gollpallly of Gollapally (M) in Jagitial District Est.Cost.Rs.30.00 Lakhs 2) Road from ... No.s Bridges on ...
Recarpeting of BT road from Hi-tech city Railway station to RUB via Vasantha City road and Mahendra Ashwitha to Gokul Plots X road in ward number 233 Izzathnagar Madhapur Circle-50, KPZ, CMC(3rd call)
Supply and installation of submersible motor pumpset and construction of catchpits and water collection chamber in order to avoid water stagnation under RUB at Balkampet near Near Suprabhatnagar in 201-Ameerpet ward,CircIe -39,KZ,GHMC
Recarpeting of BT road in Telecom colony, Bank colony, Ramchandhraiah colony, Indira nagar (BOB) Lothukunta to Bhoodevi nagar RUB, Various locations in Ward 135, Alwal Circle-27, GHMC. By HMP Contractors only. (5thRecall) (Item no.5)
Construction of Bridge at KM 0/050 on R/f R and B Road to Dannur (B) in Boath Mandal of Adilabad District, with an Est. Cost of Rs.330.00 Lakhs (6th call)
Consultancy services for Survey Investigation and preparation of PPR, DPR, cost estimate and tender documents individually for the 5 works (namely Grade Separators at (a) TKR College Junction, Gayatri Nagar Junction and Mandamallamma Junction, (b) ... existing RUB at ...
1. Signaling arrangements inconnection with proposed slewing of Track and shifting Points,Signals and Locatio boxes at Moula - Ali. 2. Secunderabad Division- Signalling cable shifting for proposed construction of Two lane ROB at Km No. 274/23-26 between PBP-ZN stations (DEPOSIT WORK - NHAI) 3. SIGNALLING AND TELECOM CABLES SHIFTING FOR PROPOSED CONSTRUCTION OF 6 LANE NEW ROAD OVER ROAD (ROR) AT KM NO. 7/2-3 BETWEEN SNF - AMQ STATIONS. (DEPOSIT WORK - NHAI) 4. SIGNALLING ARRANGEMENTS AFOR PROPOSED ADDITIONALSPUR line towards BPQ and at MANIKGARH (MAGH) STATION.
Formation of diversion road at ROB in lieu of LC NO 18T interlock at Railway km 35/5-6 of Karimnagar Jagitial section on Rayapatnam Kodad (RandB) road at Km 54/6-8 in Karimnagar District Est. cost of Rs. 28.00 Lakhs under MGF
HYB Div:- 1) BSX- Provision of PF No 4, Shelter (COP), retaining wall, and extension of exg FOB to PF 4 as part of development of New Holding area on account of Godavari Pushkaram, 2027- Electrical Arrangements 2) SC-MUE Section: Provision of COP at a)NZB for a length of 25m on PF1 and 160m on PF2/3, b)KMC for a length of 300m on PF1 and for a length of 200m on PF2/3, c)BSX for a length of 210m on PF1 and 160m on PF2- Electrical Arrangements 3)Provision of Divyangjan Amenities at 16 Halt Stations (HG2/3) and Upgradation of Toilets at 12 SG-3 Stations on HYB Division-Electrical Arrangements
Name of work: SR TO RAYAPATNAM KODAD ROAD FROM KM 39/6-42/4,45/6-46/6 AND 53/0-54/6 IN KARIMNAGAR DISTRICT,READ AS NAME OF THE WORK: SR TO RAYAPATNAM KODAD ROAD FROM KM 39/4-5,39/550-800,40/0-2,41/800-42/400,43/700-900,44/450-45/020,45/150-400,45/550 ... and Bridges on ...
Pre Survey and DPR preparation work to 1) Widening and Strengthening of Double lane and Four lane of Marpally to Kotepally Road from Km 0/6 to 2/3 (Marpally town limits) and Widening and Strengthening of Single lane to Double lane of Marpally to ... of Minor Bridge at ...