Loading…
Loading…
1,472 results • Best match
Supply & fixing of GI clamps,porcelain pin/shackle type insulator suitable for L. T.pole and supply and stringing of 3x16+25 sq mm AB cable for existing MS tubular poles for illumination at Anand bagh RUB in Malkajgjri Circle-28,Secunderabad Zone
Laying of 200mm dia DI water supply pipe line from g.m Chowni to RUB KK gate in Chandrayangutta Constituency under Jahanuma section,SD-III of O&M Dn.II (Reserved for SC contractors only as per G.O.MS.No.59, I&CAD (Reforms) Department Dated:21.05.2018)
Remodeling of RCC Box drain and providing iron grill fromLabbaik hotel to Bakery, Ahmed sweet house to Yakuthpura Nala, Alfa sweet house to RUB Yakuthpura and at various water stagnation points in 31- Reinbazar, circle-7, Santosh Nagar, CRZ, GHMC Rs. 44.40 Lakhs
Shifting of 300/250mm dia SWG sewer line from H.No.10-5-79/6 to H.No. 10-5-96/99 to facilitate the construction of four lane RUB at Lalaguda Rail Station by GHMC at Tukaramgate under Mettuguda Section, SD-III, O&MDn.VII.
Construction of RUB in lieu of LC No. BP 11 (East Anandbagh) at Railway Km 17/5-6 between Ammuguda - Moulali Station at Road Km 0/8-10 of Uttamnagar - ZTC Road in Ranga Reddy District (Balance work, now in Medchal - Malkajgiri District)
Remodeling of SW drain Np3 450 mm dia Pipe line and VDCC Road at RUB Talabkatta Main Road at Bhavani Nagar in 34-Talabchanchalam in Santhosh nagar Circle-7, CRZ, GHMC.(Reserved for SC Contractors / Proprietorship Firms / Partnership Firm)Rs.8.2 Lakhs
DESIGN, SUPPLY, INSTALLATION AND COMMISIONING OF 2 NOS OF WEIGH BRIDGES OF CAPACITY-60MT (16M X 3M SIZE) OF MAKE: AVERY/ESSAE/METTLER TOLEDO EACH ONE AT APPARAOPETA and ASHWARAOPET PLANTS, BHADRADRI KOTHAGUDEM DIST., TELANGANA STATE.
Annual Maintenance & Premonsoon Desilting of Balkapur Nala by using Manual means under Culverts & Bridges in 74- Ahmed Nagar corp div, Ward-10, Cir-12, CZ, GHMC for the year 2018-2019.(3rd call) (Item No.09)
Supply, Delivery and fixing of outdoor canopy type double door cubical panel for operation of bridges and Tower lights board for Phase-II for Water treatment plant Kalabgoor Section,SD-I,O&M Division No.VIII,Patancheru
Construction Of Bridge Cum Checkdam On R/F Pr Road (Cci) To Nishanghat Of Adilabad Mandal (C/O. 6Vents 8 Mtrs Span Slab Culvert) of Nishanghat Habitation, Arli B GP of Adilabad (R) Mandal, Est. Cost of Rs.290 Lakhs
Widening & Strengthening of Sathupally-Venkatapuram road from Km 0/0-3/9 & Km 4/140-13/625 (Work in reach from Km 8/050-8/350 & 12/400-13/625 including Construction of Bridge at Km 8/2 ) In Khammam District
Estimate for Consultancy services for preparation of detailed report on sub-soil exploration for Construction of ROB in lieu of L.C.No.12/JB on Nizamabad Narsi road at km 21/2-4 at Yedapally (M) in Nizamabad District of Telangana state.(2nd call)
Construction of CC Drain from RoB to Hunter Road sump, Laying of CC Road at Sai Nagar Colony,Laying of CC Road and Construction of CC Drain opp to Andhra Balika Jr Collage and in Div no 28 (Pattanapragathi Funds 2023-24)
Construction of ROB at Ghatkesar in Lieu of LC No.15 at Railway km 214/20-24 of Secunderabad - Kazipet section and at km 22/4-6 of Shamirpet- Ghatkesar road in Ranga Reddy District (Now in Medchal - Malkajgiri District(Balance Work).
Construction of ROB at Madhava Nagar in lieu of of L.C. No. 193 at Railway Km 465/5-6 of Manmad-Secunderabad Railway Line at Road Km 10/0 of Dichpally -Nizamabad Road in Nizamabad Dist.( Sub work:- Preparation of DPR) (4th call)
Construction of Four Lane ROB in Lieu of LC No.18T Interlocked at Railway Km 35/5-6 of Karimnagar - Jagtial Section and at Km 54/6-8 of Rayapatnam - Kodad road in Karimnagar District Sub Work:- Conducting Preliminary Sub Soil Investigation Work
Repairs to Footpath and Central Median of Dabeerpura ROB along with Painting in Chawni Div-94, Malakpet Circle-27, CRZ,GHMC. ( Reserved for ST Individuals / Proprietorship Firms / Partnership Firms as per GO MS.No. 59 dt.21.05.2018) (Malakpet Circle-27) Rs. 22.35 Laksh
Pre-survey estimate for conducting detailed survey of the road with Total station on Bichkunda Dongli to Limboor via Kurla, Dongli from Km 2/4 to 12/4 b) Madnoor Pothangal road via Limbur, Sirpur from Km 14/250 to 18/850 in Kamareddy District. & ... of High Level Bridge at ...
Consultancy services for investigation of approach road and bridge work of Widening of existing 2 lane bridge to 4 lane at Km 4/4 on Nizamabad -Jagdalpur section of NH 63 in the state of Telangana on EPC Mode.
Providing of 10 nos. of 7.5 mtrs Octogonal poles at various places from Yakuthpura RUB to Talabkatta RUB in Reign Bazar division (82 ) in Yakuthpura Circle - 26 and Constituency.
Annual Mlaintenance of open nala from H.No: 1-9-278/49/C/A to H.No:1-9 129/23/C/87 Amber Nagar Bridge to Laxmamma Playground Foot Bridge and from Laxmamma Park foot bridge to Nagamaiahkunta via Achyuth Reddy lane for the year 2026 in Adikmet Ward- 163 , Musheerabad Circle - 41, Sec-bad Zone, GHM (Rs. 20.50 Lakh) (5th callL)
SC Division: MTMI-JPTN:- Proposed construction of RUB (Subway) at km 4/1-2 in lieu of LC No: 5 at KM 4/2-3 as precast RCC Box of size 1x5.50x5.00M between Motumarri - Makkapeta stations by AIR pushing method using 20.40m RH girder.
Restoration of Damaged Road by Filling with Wet Mix Macadam and Laying of 450 mm dia NP-3 Class RCC Cross Drainage Pipes 4 Nos at RUB Near Hyma Gardens, Anantharam Road in the Mahabubabad Municipality under Municipal General Fund for the year 2024-25.
Construction of nala with RCC retaining wall and Laying of NP3 600mm dia storm water drain near RK Nagar RUB to avoid water stagnation in view of Monsoon-2025 in ward 140- Malkajgiri ,under circle-28,Malkajgiri, Sec-bad Zone,GHMC(Reserved for SC Only)
Laying of Linked Pipe line from Ram Mandir to super Bazar and Pentoji Medical Shop to Bandam Cheruvu and Various Locations of Reddy Bazar and RUB Damaged pipeline repairs at Ward no : 14 in Mahabubabad Municipality Under Municipal General Fund for the year 2017-18.
Providing of Decorative LED series Lighting for Malkajgiri x road(Indira Mahila Bhavan junction), Uttam nagar RUB and various junctions in Malkajgjri Circle 28 - Secunderabad Zone, GHMC in view of Praja palana Vijayotsavalu for 6 days i.e. 04/12 2024 to 09/12/2024.
"Providing of LED Rope lighting to beautification of existing 270 nos Central/Side Modern lighting street light poles from Midani Depot to Mahaveer College, Bandlaguda & Chandrayangutta Flyover Bridge, Kandikal Flyover Bridge, Uppuguda RUB and 5nos Traffic signals of Chandrayangutta Circle-8 in Charminar Zone, GHMC"
Construction of RUB at Km.174/0-2 on NH-63(Old NH-16) in Mancherial district (Old- Adilabad) for laying railway line to 2x600 MW, Singaraeni Colleries Company Limited (SCCL) in the state of Telangana (Sub work:- Providing and fixing of Road Safety Interventions)
Construction of RUB at Km.174/0-2 on NH-63 (Old NH-16) in Mancherial Dist(Old Adilabad District) for laying railway line to 2x600 MV, Singareni Colleries Co. Ltd., in the State of Telangana (Sub Work:- Providing and fixing Road Safety Intervensions)
Shifting of 250mm dia SWG sewer line from H.No.10-5-79/6 to H.No. 10-5-314/A at Tukaramgate to facilitate the construction of four lane RUB at Lalaguda Rail Station by GHMC at Tukaramgate under Mettuguda Section, SD-III, O&MDn.VII.
Remodeling of RCC Box drain and providing iron grill fromLabbaik hotel to Bakery, Ahmed sweet house to Yakuthpura Nala, Alfa sweet house to RUB Yakuthpura and at various water stagnation points in 31- Reinbazar, circle-7, Santosh Nagar, CRZ, GHMC (Recall) Rs.44.40 lakhs
Package No. TS29DNIIIB01- Construction of Bridge at KM 7/300 on RF Dornakal R B Road to Mulkalapally NH Road via Vennaram in Dornakal Mandal in Mahabubabad district Est cost Part A Rs.211.51 lakhs + Part B Rs. 6.35lakhs = Rs.217.86 lakhs
(i) Construction of Bridge on road from Bodapuram to Tippapuram at km 0/8 in Mulugu district (ii) Construction of HLB at km 3/6 on Koppusuru to Gundlavagu project from km 0/0 to 6/0 in Mulugu district(3rd call)
Construction of BT roads, Additional proposals of Roads/Bridges in LWE affected areas under RCPLWE-priority (2&3) Roads Sl.No.73,74,75,76,77,78 & 79 (Seven roads, 27.50 Kms) in Mancherial District (Sub-Work: Preparation of Detailed Project Report) (3rd call)
CRR-2023-24- Nizamabad Rural Package Package No:II- Constructions of Roads ,Bridges and CD Works (9 Works) in Nizamabad, Mopal, Dichaplly and Jakranpally Mandals of Nizamabad Rural Assermbly Constituency in Nizamabad Dist Total Est cost Rs 970 Lakhs.
Construction of BT roads, Additional proposals of Roads/Bridges in LWE affected areas under RCPLWE-priority (1) Roads Sl.No.66,67,68,69,70, 71&72 (Seven roads, 36.00 Kms) in Mancherial District (Sub-Work: Preparation of Detailed Project Report) (3rd call)
SHEET(VLCNZD RUBBER) 5X1000X2000MM (Q3), VALC RUB SH 2 MM 1000X2000 (Q3)
Laying of CC Road from H.No.12-6-98 to ROB (Anathula Kedari Cloth stores lane), Laying of CC Road from H.No.12-7-123 to H.No.12-7-141 beside Ramalingeshwara Swamy Temple in div no.24.(Pattana Pragathi 2020-21)(8th call)
Provision for Warangal Inner Ring (Road Provision for Warangal Inner Ring Road(Road work from Naidu Petrol Pump to Enumamula Market excluding ROB gap in GWMC limits in Warangal Urban district. Chainage: 0/000 km - 4/440 km & 6/040 km to 6/300 km)
Construction of ROB in lieu of LC. No. 29 at km. 159/9-160/0 between Umram and Adilabad stations and construction of LHS for light vehicular traffic in lieu of LC.No. 30 at km 161/2-3 near Adilabad market yard in Adilabad District
Project Management Consultancy services for proof checking, Construction supervision,Quality Assurance,Quality Control &Quality Audit for the work of Construction of Grade seperator(ROB) at L.C.No 7 of Secunderabad-Falaknuma-Shivarampally-Railway line at shastripuram on road from Mailardevpally to Falaknuma RTC Bus Depot Hyderabad
Vikarabad Municipality - Infrastructure Development works in ULBs with TUFIDC Assistance - Providing Four Laning with Median, Central lighting from yennepally X road to NTR X road (Manneguda - Vikarabad, Sadasivpet road from Km 8/0 to 8/5 & ROB approches from KM 1/0 to 1/4
Construction of ROB at Ghatkesar in lieu of LC No.15 at Railway Km 214/19-21 of Secunderabad - Kazipet section at Km 22/4-6 on Shamirpet - Ghatkesar Road in Rangareddy District. Sub Work :- Dismantling of Houses for Land Acquisition on NH 202 Side
Construction of 4 lane ROB in Lieu of LC No.191 at Railway at km.456/5-6 of Manmad-Secundrabad Section and km.10/4-6 of Nizamabad By Pass road in Nizamabad District.(Sub-work:- Survey,Design of Bridge and Preparation of DPR)
1. Signaling arrangement in connection with proposed Proposed construction of Road under bridge (RUB) in lieu of LC No.63A(M) Up,DN & third line portion at Km 379/22-24 as precast RCC Box of size 2x9.00x5.50m between KZJ - WL stations by AIR pushing ... ( RUB ) ... ( RUB ) ... ( RUB ) ... ( RUB ) ...
Construction of CC Drain from Chari house to Nala Bridge, Construction of Culvert at Chari house and Laying of CC Road From Srunaja School Srinivas house to salvadhi Venkanna house at W no. 34 in Suryapet Municipality
PREPARATION OF DETAILED PROJECT REPORT INCLUDING DETAILED ENGINEERING AND GETTING APPROVAL FROM I&CAD DEPARTMENT TELANGANA STATE FOR THE PROPOSED DIVERSION OF GUNDLAVAGU AT KTK OC - III INCLUDING BRIDGES ACROSS DIVERTED GUNDLAVAGU NEAR BHUPALPALLI JAYSHANKAR BHUPALPALLI DISTRICT TELANGANA STATE.
Emergency Repairs for CD works painting,Tree banding and providing Hazard markers and delinators at narrow culverts and Bridges on Burgampahad to Eturunagaram road from km.6/8 - 65/0 for the year 2024-25 in Bhadradri Kothagudem District
Removal of accumulated silt in the Primary Settling tank and secondary Clarifloculators and painting to the Scraper Bridges 1 and 2 of M]MWSS Phase-I Water Treatment Plant Rajampet under SD-I, O&M Division No. VIII, Patancheru
Diversion of 450mm dia CI water supply line with 450mm dia MS water supply line from H.No.2-3-22 to 5-4-104/6 near RUB, Ranigunj near Bombay Hotel, M.G.Road under Nallagutta Section, SD-I of O and M Division No-VII.(4th Call)