Loading…
Loading…
1,472 results • Best match
Annual Maintenance and Desilting of open nala from Indu Fortune main gate to Mulkahwa Cheruvu vent at MMTS station via RUB1 and RUB 2 and Mahendra Aasvita to Shilpa Avenue in Ward No. 114 of GHMC, Moosapet Circle - 23
Annual Desilting of Storm Water drains (Open Major Nala) by Mechanical means from RUB Yakutpura to Zohra Bee Dargah Talabkatta via Chotapool for the year 2025 in Rein Bazar division of Circle -7 in CRZ,GHMC Rs.44.85 Lakhs
Annuval Maintenance and Desilting of open nala from indu fortune main gate to mulkahwa cheruvu vent at MMTS station via RUB1 and RUB 2 and Mahendra ashvita to Slipa Avenue in ward No.114 of GHMC, Moosapet Circle-23
Package No-TS04HAIIIBLB04-Construction of Bridge on R/F MRL16-Hanwada to Gudimalkapur via Tankara at 0/0KM to 0/100 KMs in Hanwada Mandal, Mahaboobnagar District, Estimate cost Rs.153.76Lakhs (Construction Rs.150.00Lakhs + Maintenance Rs.3.76Lakhs)
Construction of ROB in lieu of LC No.107T across railway line at Km.493/1-2 of Kazipet-Vijayawada section in Km.0/4-6 of Ramakrishnapuram-Peddagopathi road in Khammam District Sub-work:-Preliminary sub soil investigation
Construction of New BG line between Bhadrachalam road to Sathupalli Station ROB No.50 on V-J Road NH-30 in Bhadradri Kothagudem Dt. Sub Work: Conducting Sub Soil investigation at Km 93/2-4 on V-J Road.
Maintenance of Lawns, Individual Shrubs, Hedge/shrub planting, Tree Species at Greenery From JNTU to Madhapur, Hitech City to Hitech City Railway station and Rotary to Hitech City Railway station, Kukatpally ROB (Railway Over bridge), Island at Art Gallery
Widening from two lane to four lane of Raigiri Yadagirigutta road from Km 0/0 to 6/3 including construction of 2nd ROB at Km 1/4-6 in Nalgonda District. Sub work : Providing Road lighting with Split poles
Shifting of 33KV, 11KV, LT lines & DTRs for construction of approaches to ROB, at Km 170/40-42 between Hitech City and Borabanda Station for 4 lane carriage way in KPHB Sub Division of Kondapur Division in Cybercity Circle
Construction of ROB in lieu of LC No.54 at Railway Km 313/24-26 of Kazipet-Secundrabad section of Peddapaendial to Punnel road at Ch 0/0-2 in Warangal Urban District Sub-Work: Conducting a preliminary survey
Construction of ROB in lieu of LC No.113E across railway line at Km.505/28-30 of Kaipet-Vijayawada section in Km.6/4-6 of Chintakani-Nagulavancha road in Khammam District Sub-work:-Preliminary sub soil investigation
SW(i): Hyderabad Division - Construction of 2 lane ROB in lieu of LC 18 JB on JKM- BDHN section and SW(ii): Hyderabad Division- Proposed construction of LHS in lieu of LC no. 254 at Safilguda - Electrical TRD Arrangements
Laying of BT Layer from Opp MRO Office to Railway Over Bridge at Jubli Pura and Various Locations in Khammam Municipal Corporation
Maintenance of Submersible Pumps, Generator and Desilting Sump of RUB Uppuguda for Twelve (12) months (June, 2022 to May 2023) in 35-Gowlipura, Santosh Nagar, Circle-7, CRZ, GHMC (Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs. 7.25 Lakhs
Laying of CC road with M40 Grade under Talabkatta RUB on left hand & right hand side towards Rein Bazar and Talab Chanchalam of 34-Talab Chanchalam in Santosh Nagar, Circle-7, SZ, GHMC (VDCC Work) (5th Recall) Rs. 26.70 Lakhs
Providing chain link mesh along the Nala at Gandhi Nagar lanka, Fever Hospital, Shivanand Nagar, Tilak nagar RUB, in Nallakunta ward-81, Amberpet Circle 16, GHMC (Reserved for WLCCS) (Under "Special Infrastructure Grant Works" of 59-Amberpet Constituency.) (Rs. 13.80Lakhs)
Laying of VDCC ROAD in front and besides Masjid-e-Rub,Masjid-e-Abu Huraira,Masjid-e-Rabiya, Masjid-e-Ghousia Parveen in view of Ramzan Festival 2021 under Tolichowki-68,Ward-9,Cir-13, KZ, GHMC (Reserved for SCs)
Premonsoon Desilting and maintenance of nala from Samad Hotel to Lalitha Bhag RUB for the year 2022 of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. Reserved for SC Contractors / Proprietorship Firms / Partnership Firms) Rs.9.75 Lakhs
LAYING OF CC ROAD AT P.NO. 32 RUB HARI NAGAR 13-5-162/2/1 TO 13-5-162/2/7 AND VARIOUS BYLANES SHIVAJI NAGAR IN WARD NO. 116 OF MOOSAPET CIRCLE-23, GHMC (RESERVED FOR SC) (RE-CALL)
Annuval Maintenance and Desilting of open nala from indu fortune main gate to mulkathuwa cheruvu vent at MMTS station via RUB1 and RUB 2 for year 2022 in KPHB Colony ward No.114 of GHMC, Moosapet Circle-23 (3nd recall)
Annual desilting of storm water drains (Open major nala) by mechanical means from RUB Yakutpura to Zohra Bee Dargah Talabkatta via Chotapool for the year 2026 in 31-Rein Bazar division of Santosh Nagar Circle, Circle-7, CRZ, GHMC.Rs.49.90 Lakhs
Providing Bridges to Un connected ST habitations on Ravutla to Mahipal thanda , Narsinghpally to Ramsingh Thanda and Nyavanadni to Ramsingh thanda of Nizamabad Rural Constituency in Nizamabad District (Sub-work:Conducting Pre survey and drawings )
Operation and Maintenance (O&M) of Three (03) No's of Foot Over Bridges (FOBs) at Uppal (Near IDA), AS Rao Nagar (near Ushodaya Super Market ) and Balanagar (Near IDPL, Prashanthnagar) for two (2) years
HYB Division: ADEN/NZB - Annual repairs/maintenance of quarters and service buildings including stations, circulating areas, yards, foot over bridges, gardens/parks under the jurisdiction of ADEN/NZB for a period 01.07.2026 to 30.06.2027
HYB Division: ADEN/KCG - Annual repairs/maintenance of quarters and service buildings including stations, circulating areas, yards, foot over bridges, gardens/parks under the jurisdiction of ADEN/KCG for a period 01.07.2026 to 30.06.2027
HYB Division: ADEN/KRNT - Annual repairs/maintenance of quarters and service buildings including stations, circulating areas, yards, foot over bridges, gardens/parks under the jurisdiction of ADEN/KRNT for a period 01.07.2026 to 30.06.2027
HYB Division: ADEN/MED - Annual repairs/maintenance of quarters and service buildings including stations, circulating areas, yards, foot over bridges, gardens/parks under the jurisdiction of ADEN/MED for a period 01.07.2026 to 30.06.2027
Monthly Basis Cab & Taxi Hiring Services - SUV; Monthly basis cab taxi hiring services SUV 2000 Km per month round the clock 24x7 vehicle required for DEN Bridges SC Total 01 vehicle; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; Monthly Basis Cab Taxi Hiring Services SUV 2000 KM per month round the clock 24x7 Vehicle required for DEN Bridges SC Total 01 Vehicle; Outstation 24*7
Package No-TS04HAIIIBLB05-Construction of Bridge on R/F MRL16-Hanwada to Gudimalkapur via Tankara at 0/6 KMs to 0/8 KMs in Hanwada Mandal, Mahaboobnagar District, Estimate cost Rs.175.28Lakhs (Construction Rs.171.00Lakhs + Maintenance Rs.4.28Lakhs)
Package No.TS01XIILB02 - Construction of Bridge at 8/800 on Road from Laxmipur to Baddampally of Vemanpalle Mandal of Mancheraial District. Est. Cost Rs.873.44 Lakhs (Rs.824.00 Lakhs + Rs.49.44 Lakhs Mtc cost), Sanctioned under PMGSY XII Grant.
Construction of ROB in lieu of LC No.60/E at Railway Km 369/14-16 of Kazipet to Vijayawada section on Fathimanagar to Mamnoor road at Km 0/8-10 in Warangal Urban District Sub-Work: Conducting a preliminary survey
Shifting of 150/100mm dia DI pipe line from Opp.H.No.8-15-37/8/A, Mahmood Hotel to Deccan Bakery for construction of proposed parallel ROB, Falaknuma under MRG section, Sub Division-I of Operations and Maintenance Division-I (1st Recall)
Estimate for Consultancy services for preparation of detailed Project report for Construction of ROB in lieu of L.C.No.12/JB on Nizamabad Narsi road at km 21/2-4 at Yedapally (M) in Nizamabad District of Telangana state.(2nd call)
Construction of ROB at Shankarpally in lieu of LC No. 20 at RKY KM 139/6-7 of Secunderabad -Wadi sections and Km 18/6-10 of Chevella Shankarpally Road in Rangareddy District. Sub work: Providing Bridge Lighting (3rd call)
Construction of Third BG line between Bellampally Mandamarri in Kazipet Ballarsha section Construction of 2 Lane ROB at the existing Bridge No.165A (SriRampur Mandamarri Road (MDR) at Km. 18/8-10) in Mancherial District. Subwork: Providing Road Safety Interventions.
Construction of new BG Railway line from Manoharabad to Kothapalli Construction of ROB 167 (4 lane) on Medak Siddipet Elukathurthy Road ( NH 765 DG) at Railway Ch 71429 m at Siddipet between Gajwel Siddipet stations in Siddipet District (2nd call)
Emergency Repairs to Neckonda ROB Road from Km 0/0 to 0/850 & Neckonda to Gudur road from km 3/2 to 6/6 and Neckonda ByePass road from km 0/0 to 1/0 in Warangal District.(By HMP)
Construction of ROB in lieu of LC No.20 at Railway Km 139/6-7 of Secunderabad-Wadi section and at Km 18/6-10 of Chevella - Shankarpally Road in Ranga Reddy District - Sub-work for providing Road safety Interventions.
LAYING OF CC ROIAD FROM H.NO.11-3-49 PADMAMMA HOUSE NEAR APPANNAPALLY ROB BRIDGE TO YEDIRA BT ROAD AND FROM H.NO.11-3-52 TO RAILWAY TRACK BOUNDARY WALL IN APPANAPAALY AREA IN WARD NO.03 IN MAHABUBNAGAR MUNICIPALITY
Maintenance of greenery at Roshaiah Statue, Traffic Islands at Lakdikapool Junction opp:Metro station, model corridor along foot over bridge, Lakdikapool Model Bridge opp Petrol Bunk, pots opp to shagouse hotel and fountain beside Santhnirankari Bhavan, Lakdikapool Circle No. 35, Khairtabad Zone, UBD, GHMC for a period of 12 Months
KZJ-BPQ Section: SW-I: Proposed ancillary works for LC No.33 at Km. 307/15-13 (RUB 81A) Jacketing of approach retaining walls, cover over approaches, and providing long speed breakers duly extending retaining wall between KOLR-PTKP stations of ... ( RUB 74A) ...
SW-I: Proposed ancillary works for LC No.35 at Km. 301/28-30 (RUB 88A) Jacketing of approach retaining walls, cover over approaches, and providing long speed breakers duly extending retaining wall between KOLR-PDPL stations of KZJ-BPQ section under ... ( RUB 145B) ...
SW-I: SC Division: VKB-PRLI Section -Proposed improvement to drainage system, roads and approach retaining wall and provision of height guage at RUB No 32A in lieu of LC No. 10 at km.18/12-13 between VKB-SSPD stations under ADEN/VKB subdivision ... at RUB No ...
SC Division: 1. Improvement of reliability for OHE/PSI infrastructure in SC Division- (Stone filling, AMCD and Misc). 2. Provision of Earth filling & stone pitching for OHE foundation near bridges /culverts/curves over SC Division.
Operation and Maintenance (O and M) of Three (03) nos Foot Over Bridges (FOBs) at Uppal (near IDA), A.S Rao Nagar (Near Ushodaya super market) and Balanagar (near IDPL, Prashanthnagar) for two (02) years, Hyderabad
Periodical Renewals to the approaches to the High Level Bridges at (i) Km. 4/0-4 on Nizampet X roads to Kalher (ii) Km.29/6-8 Narayankhed - Masanpally road in Sangareddy District(3rd call)
Civil works for erection of 60ton weigh bridges 2nos. such as Pedestals, Retaining walls, Approach road and Cabin room at proposed RG OC-V Project in RG.I area, GDK. (Capital, Defect liability is two years)
SC Division: 1. Improvement of reliability for OHE/PSI infrastructure in SC Division- (Stone filling, AMCD and Misc). 2. Provision of Earth filling & stone pitching for OHE foundation near bridges /culverts/curves over SC Division.
Ieeja Municipality- Infrastructure development in ULBs with TUFIDC Assistance- Laying of BT road from PHC to Thumkunta Road via Kathimanyam & Construction of bridge at Kuruvapeta with Providing of road way light with LED in Ieeja Municipality under TUFIDC Assistance.