Loading…
Loading…
1,471 results • Best match
Hyderabad Division: 1) SC-MUE Section: Replacement of Track circuit with Multi Section Digital Axle Counter on Sitafalmandi B- Malkajgiri-Cavalry Barracks- Bolarum Auto Sections- Electrical arrangements 2) Replacement of analog axle counter on loop ... Proposed Construction of Bridge No:636A ... ( ROB ) ... providing RUB between ...
Laying of CC road for eliminating water stagnation in front of Mahfil panshop and at Universal Sulabh Toilets near RUB near Ranigunj in 148-Ramgopalpet Corpn Divn., under circle 30, Begumpet, NZ, GHMC, Sec-bad Zone
Formation of Balance Service Road, Strengthening and Re-Carpeting of existing road (Excluding flyover shadow portion) & Construction of Storm Water Drain on both of sides for 215' wide road from FOB at Divya Sree to Care Hospital at Bio Diversity Junction.
Providing of DI Pipe line to be effected under Construction of ROB from Railway K.m 187/4-5 of Secunderabad to Kurnool section Road K.m 0/2-4 of Gadwal to Rangapur Road in Gadwal Municipality
Construction of ROB in Lieu of L.C No.73 at Devarakadra village limits at Railway Km.138/3-4 of Devarakadra - Kaukuntla Section and Road Km.22/6-8 of Mahabubnagar - Raichur Road in Mahabubnagar District
Estimate for Consultancy services for conducting sub-soil investigation for Construction of ROB on L.C.No.18/JB on Nizamabad Bodhan section of Hyderabad -Medak-Bodhan road at km 182/8-10 in Nizamabad District.(2nd call)
Construction of New BG Line between Bhadrachalam road and Sattupalli Station for ROB No.50 on Vijayawada-Jagadalpur NH-30 (Proposed) at Km 93/2 to 93/4 in Bhadradri Kothagudem District. Sub Work:- Providing RSI.
Providing Check posts-3 Nos and 3 Nos rooms for 60T weigh bridges at OCP-III CHP and at Phase-II CHP at Rg-II area, Godavarikhani, Dist. Peddapalli, Telangana State.
Comprehensive Annual Maintenance Contract(CMC) of(two) 2 numbers 120T in motion weigh bridges working at wharf loading, CHP Yellandu and Chimalapahad Railway station for a period of three (3) years
Construction of 5 nos Foot Over Bridges (FOBs) at Km.92.830, 110.200, 113.200, 118.350 and 122.270 on Yadgiri-Warangal section of NH-163 in the state of Telangana on EPC mode
Pre Monsoon and Annual Desilting of main nala from Samad Hotel to Lalithabagh RUB of 34-Talab Chanchalam in Santosh Nagar Circle-7, Charminar Zone, GHMC. (Reserved for Sagara/ Waddara community Individuals and Societies) Rs. 6.20 Lakhs
Providing of Chain link fencing, Precast slabs and from Bandam baavi to raising/repairs of RR wall on Nalas/SW drains burtonguda, bollaram to janapriya rub, chandranagar, in Ward no. 133, Alwal Circle, GHMC ( Item No.01)
Annual Maintenance and Desilting of open nala from Indu Forture main gate to mulkathuva cheruvu vent at MMTS Station via RUB1 and RUB 2 in Ward No. 114 KPHB Colony, Moosapet Circle No. 23, GHMC (4th call)
Providing of Jali frames along with accessories at Alugadda Bavi RUB, 1) Saibaba Temple Kaman opp. Lalapet 2) Shanti nagar water tank , 2 Nos Minimast, MS tubular pole at Keshavanagar colony, Secunderabad Circle -29, Secunderabad Zone, GHMC.
Annual desilting of storm water drains (Open Major Nala) by mechanical means from Dabeerpura bridge to RUB Yakutpura for the year 2026 in 30- Dabeerpura division of Santosh Nagar Circle, Circle - 7, CRZ, GHMC. Rs.27.90 Lakhs
HEX HEAD BOLT M12X35 STAINLESS STEEL, as per Drawing: IS:1363(PART-1)-1992, A2-70 TO IS:1367(PART-14)-1984, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB
HEX HEAD SCREW M10X65 STAINLESS STEEL, as per Drawing: IS:1364(PART-2)-1992 A2-70 TO IS:1367(PART-14)-1984, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB
CRF -Widening and strengthening to a) Bichkunda -Dongli to Limboor via Kurla, Dongli from Km 2/4 to 12/4 b) Madnoor Pothangal road via Limbur, Sirpur from Km 14/250 to 18/850 in Kamareddy District Sub-Work: Preliminary soil investigation work for the ... of Minor bridge (km ...
FDR to (i) Repairs to culvert at km 6/8 to 7/0 on Ramadugu PWD road to Challagariga via Suddulam, Koratpally, Mailaram road (ii) Construction of CD work at km 12/8 on NH44 to Thirmanpally road (iii) Reconstrution of quadrants to minor bridge on km 5/0-2 on Indalwai-Bheemgal road in Nizamabad District.(4th call)
Constructin of ROB in lieu of LC No.129 across railway line at Km.545/5-6 of Kazipet-Vijayawada section in Km.0/0 of Yerrupalem-Jamalapuram road in Khammam District Sub work:-Pre-survey work
Construction of ROB in liew of LC.No.90 at Railway Km.460/6-8 of Kazipet - Vijayawada Section and at Km.14/2-4 of Satyanarayanapuram - Dornakal road in Mahabubabad Dist. Sub - Work:- Conducting Sub - Soil Investigation.
Construction of New BG line between Bhadrachalam road to Sathupally Station ROB No.20 connecting Tekula Banjar to Chinmathanda road to NH-30 at Km 1/2-4 in Bhadradri Kothagudem District. Sub Work:- Conducting Pre Survey.
Construction of third BG line between Bellampally Mandamarri in Kazipet Ballarsha section Construction of 2 Lane ROB at the existing Bridge No 165 A (Sri Rampur Mandamarri Road MDR at Km. 18/8-10) in Mancherial District
Conducting Pre Survey Estimate for Construction of New BG line between Bhadrachalam road to Sathupalli Station for ROB.7 on Thallada - Bhadrachalam road (SH-12) Road at Km 38/0-2 in Bhadradri Kothagudem District (2nd Call).
Plantation and Maintenance of plants up to (1 Year) including digging, planting, providing tree guards, watering, saucering, deeweeding and replacement of plants from Mustafa Nagar to ROB and from Khanapuram to Ganesh Township in Khammam Municipal Corporation
Construction of ROB at Dhamsalapuram in lieu of LC No.106 in Railway Km 489 / 13-15 of Khazipet Vijayawada section in Km 3/2-4 of Khammam- Bonakal road in Khammam District. Sub work: Providing Electrification
Construction of ROB in liu of L.C.No.95 at Railway Km 470/2-4 of Khazipet-Vijayawada section in Km 13/4-6 of Khammam Papatpally (via) Ramannapeta, Kamanchikallu road in Khammam District. Sub Work:- Preliminary Survey
Plantation and Maintenance of plants up to (1 Year) including digging, planting, providing tree guards, watering, saucering, deeweeding and replacement of plants from Mustafa Nagar to ROB and from Khanapuram to Ganesh Township in Khammam Municipal Corporation
Construction of ROB in Lieu of LC.No. 90 at Railway km 460/6-8 of Kazipeta-Vijayawada section and at km 14/2-4 of Satyanayanapuram - Dornakal road in Warangal District. Sub-Work- Providing Road Safety Interventions
Arresting water supply leakage on 300mm dia MS pipe of Air valve existing on 2200mm dia MS main of Phase-II Ring Main-II at RUB Alugaddabavi Mettuguda under KWS Monitoring section, SD.No.II of O&M Div.No.XI, Sahebnagar
Engaging static labour at a) Zinda tilsmath road b) Nimboliada RUB for monsoon Emergency Duties from 01/06/2025 to 31/10/2025 (5 Months) in Golnaka ward-82 , Amberpet Circle-16, Secunderabad Zone, GHMC. Rs.10.30 lakhs
Manufacturing, Supply, delivery, Lowering, laying, jointing, testing and commissioning the Extended length of 1200mm dia MS Gravity Main of KDWSP Phase-I from Telangana Minority School to tunneling Receiving pit and Grave yard Pump room to Tunneling ... parallel ROB by ... existing ROB at ...
Siddipet Municipality - Construction of RCC Bridges for Crossing the Canal to Carry 600 mm dia & 400 mm dia DI K9 D/F Pumping main at Gallipalli (Vi) & Vanthadapula (Vi) in Siddipet Municipality
Additional proposals of road/bridges in LWE affected area under RCPLWEA scheme (2019-2020) for package-VI roads pertaining to (R&B) Sub-Division Kaghaznagar. Sub work: Preparation of Detailed Project Reports
Forming diversion road to Kalyanikhani Open cast mine of Kasipet-Manikpur road from Km.0/0 to 6/0in Mancherial.(Sub-work: Preparation of Detailed Project Report of Roads & Bridges) (2nd Call)
Additional proposals of road/bridges in LWE affected area under RCPLWEA scheme(2019-2020) for package-VII roads pertaining to (R&B) Sub-Division Asifabad. Sub work: Preparation of Detailed Project Reports
Additional proposals of road/bridges in LWE affected area under RCPLWEA scheme (2019-2020) for package-V roads pertaining to (R&B) Sub-Division Kaghaznagar. Sub work: Preparation of Detailed Project Reports
Package No.TS04CHIIICLB01 - Construction of Bridge on Road from CC Kunta to Undyala via Nakkala Vampu at 0/08Km in Chinna Chinta Kunta Mandal of Mahabubnagar District, Estimate cost Rs.170.18Lakhs (Construction Rs.165.00Lakhs + Maintenance Rs.5.18Lakhs)
Package No-TS04HAIIIBLB06-Construction of Bridge on R/F MRL16-Hanwada to Gudimalkapur via Tankara at 4/8KMs to 5/0KMs in Hanwada Mandal, Mahaboobnagar District, Estimate cost Rs.177.00Lakhs (Construction Rs.173.00Lakhs + Maintenance Rs.4.00Lakhs)
Providing Pedestrian Guard Railing and Construction of FOB in Tukkuguda town limits from Km 17.4 to 18.4 on Hyderabad Srisailam road section of NH 765 in the State of Telangana under Road Safety Annual Plan for the year 2022 23 on EPC mode
Construction of ROB in lieu of LC No.107T across railway line at Km.493/1-2 of Kazipet-Vijayawada section in Km.0/4-6 of Ramakrishnapuram-Peddagopathi road in Khammam District Sub-work:-Pre survey work
Construction of ROB in Lieu of L.C.No.51/2 at Km.2/8 on approach to Ramagundam Railway Station Road at Railway Km.273/22 on Kazipet - Ballarasha section in Karimnagar District. Sub work- Construction of Service Roads
Laying of WBM & CC approach road connecting service road by the side of Indaram Kundaram ROB with Nazeerpalli village across STPP Railway line at Ch. 13.40 KM, Indaram Village, Jaipur Mandal, Mancherial District under CSR Programme of STPP
Construction of ROB in Lieu of LC No.27 at Chattanpally at Railway km 58/2-4 of Secunderabad-Dhone Section and at Road km 31/0 to 32/0 on Makthamadavaram - Shadnagar road in Ranga Reddy District.
Construction of ROB at Dhamsalapuram in lieu of LC No.106 in Railway Km 489/13-15 of Khazipet-Vijaywada section in Km 3/2-4 of Khammam-Bonakal road in Khammam District Sub work:Providing road safety interventions
Construction of ROB in lieu of LC.No.80 at Railway Km.435/15-17 and Sub way at Km.436/11-13 between Tadlapusalapally and Mahabubabad Stations on KZJ - BZA section in Mahabubabad District ( Sub -Work: Pre Survay )
Construction of New BG line Between Bhadrachalam Road and Satupalli Station for ROB No.50 on Vijayawada-Jagadalpur NH-30 Road at Km 93/2-4 in Bhadradri Kothagudem District. SW:-Shifting of existing Mission Bhagiratha grid pipeline.
Construction of ROB in lieu of LC No.129 across railway line at Km.545/5-6 of Kazipet-Vijayawada section in Km.0/0 of Yerrupalem-Jamalapuram road in Khammam District Sub-work:-Preliminary sub soil investigation
Annuval Maintenance and Desilting of open nala from indu fortune main gate to mulkahwa cheruvu vent at MMTS station via RUB1 and RUB 2 and Mahendra ashvita to Slipa Avenue in ward No.114 of GHMC, Moosapet Circle-23
Pre Monsoon and Annual Desilting of main nala from Samad Hotel to Lalithabagh RUB of 34-Talab Chanchalam in Santosh Nagar Circle-7, South Zone, GHMC. Rs. 9.30 Lakhs (Reserved for SC, ST, Waddera, Sagara (Uppara), Societies) (2nd Recall)